Tunisian project portfolio

Preview:

DESCRIPTION

Tunisian project portfolio. CDM Investor Forum. DJERBA, 22 - 24 September 2004. Portfolio of 8 projects presented in the 1st NC. 10 CDM Small scale projects portfolio with UNDP support. 2001. 2003. 2004. Action plan for GHG Mitigation. CDM Project priority areas (CDM potential). - PowerPoint PPT Presentation

Citation preview

Tunisian project portfolio Tunisian project portfolio

CDM Investor ForumDJERBA, 22 - 24 September 2004

Action plan for GHG

Mitigation

PDD for 2 CDM small projects

financed by the ANME

PDD for 2 CDM full size projects with the support of Canadian

Cooperation

Portfolio of 8 projects presented in the 1st NC

10 CDM Small scale projects portfolio with

UNDP support

•Zounkar Wind farm•Enfidha Cardboard Company cogeneration project

•Efficient street lighting project•Methane valorisation in Waste Water treatment station

CDM Project priority areas (CDM potential)

2001

20032004

First CDM Projects Portfolio

•Portfolio presented in the first National Communication

• 8 projects

•Cogeneration

•ESCO

•Wind Farm

•Biogas

•Solar Water heating

•Freight plant

•Public lighting

•Low consumption lamps

Energy saving : 5,5 MTEOGHG emission reduction: 16 MTECO2

Type of activities N. of projects

Sector

Renewable energy 6 Electricity production : 4Residential : 1Tertiary sector : 1

Supply side energy efficiency

2 Electricity production: 2

Demand side energy efficiency

1 Tertiary sector  : 1

Energy substitution 1 Transport : 1

CDM Small Scale Projects Portfolio

• Study order by ANME and financed by the UNDP

• Pre-identification of 10 CDM Small Scale Projects

CDM Potential (Priority areas)

12%3803 29782 989Total

38%6.7181 394Flaring gas reduction in gas and petroleum production sites

5%29.05906 045Natural Gas substitution

16%37.22267 749ESCO promotion

17%90.954818 943Cogeneration development

15%11.0742 294Biogas development

19%139.373829 028Wind energy development

17%47.12759 820Energy saving and contract programme in industry

5%5.2951 080Public street lighting

3%22.36784 651Water solar heating

17%9.5551 984Energy saving and contract programme in tertiary sector

%(Mdt)

Potential contribution of CDMTotal invest.

(Mdt)

GHG emiss. reduce

(kTe-CO2)

Project areas

12%3803 29782 989Total

38%6.7181 394Flaring gas reduction in gas and petroleum production sites

5%29.05906 045Natural Gas substitution

16%37.22267 749ESCO promotion

17%90.954818 943Cogeneration development

15%11.0742 294Biogas development

19%139.373829 028Wind energy development

17%47.12759 820Energy saving and contract programme in industry

5%5.2951 080Public street lighting

3%22.36784 651Water solar heating

17%9.5551 984Energy saving and contract programme in tertiary sector

%(Mdt)

Potential contribution of CDMTotal invest.

(Mdt)

GHG emiss. reduce

(kTe-CO2)

Project areas

Cogeneration of Heat and Power at Enfidha Cardboard Company (ECC)

• Site: East-Centre, 100 km from Tunis Capital

• Capacity: 90 tons/day of carton from recycled paper

• Project Activity : Installation of 3,5 MW of cogeneration capacity

Cogeneration of Heat and Power at

Enfidha Cardboard Company (ECC)

•Energy saving: 25 GWh/year

•Emission reductions: 6,500 tCO2e/yr

•Starting date: 1/01/2006 (starting of the crediting period)

•Baseline: Metrogas de San Bernardo (NM-0018) – under review by the Executive Board

Cogeneration of Heat and Power at

Enfidha Cardboard Company (ECC)•Investment to mobilize : $US 3.5 million

•Resources:

•Self financing

•Subsidies through the Energy Conservation Support Programme and the Industry Modernization Programme

•Commercial Bank Credit

•Supplier Credit

•PDD Status: Preliminary version

•Project Developer: ECONOLER

•Under review by ANME

Cogeneration of Heat and Power at

Enfidha Cardboard Company (ECC)

Wind Farm of Zounkar

• Site: Bizerte, North of Tunisia at 60 km from Tunis Capital

•Project Activity : Electricity production from wind farm connected to the grid

• Capacity: 90 MW

•Energy saving: 318 GWh/year

•Emission reductions: 160 ktCO2e/yr

•Starting date: 1/01/2006 (starting of the crediting period)

•Baseline: Methodology of NM-0012 wind farm project of Wigton in Jamaica

Wind Farm of Zounkar

•Investment to mobilize : $US 120 million

•Resources:•Self financing (30% of the investment)•Commercial Bank• Subsidies through the Energy Conservation Support Programme

Wind Farm of Zounkar

•PDD Status: Preliminary version

•Project Developer: ECONOLER - ENERCIEL

•Under review by ANME

Wind Farm of Zounkar

Efficient Street Lighting

•Site: Districts of Ariana, Goulette and Mourouj (Tunis Capital)

•Project Activity : Dissemination of power modulators

• Modulators for 40.000 street lamps (6,5 MVA)

•Energy saving: 6,5 GWh/year

•Emission reductions: 3,800 tCO2e/yr

•Starting date: 1/01/2006 (starting of the crediting period)

Efficient Street Lighting

•Investment to mobilize : $US 2,6 million

•Resources:

•District Self financing

•Subsidies through the Energy Conservation Support Programme

•Communal Fund

Efficient Street Lighting

•PDD Status: under development

•Project Developer: ANME

Efficient Street Lighting

Biogas valorisation in the waste water treatment station of Nabeul

• Site: Nabeul, East-North, 60 km from Tunis Capital

•Project Activity :Methane recuperation and use for heating

•Recuperation of 42,000 m3 of Methane/yr

•Energy saving: 60000 l of fuel/yr (54 TEO)

•Emission reductions: 7,500 tCO2e/yr

•Starting date: 1/01/2006 (starting of the crediting period)

Biogas valorisation in the waste water treatment station of Nabeul

• Investment to mobilize : $US 0.2 million

• Resources:

• Self financing of ONAS

• Subsidies through the Energy Conservation Support Programme and the Industry Modernization Programme

Biogas valorisation in the waste water treatment station of Nabeul

•PDD Status: Preliminary version

•Project Developer: ANME

•Under review by ANME

Biogas valorisation in the waste water treatment station of Nabeul

CDM Small Scale Projects Portfolio

Project areas

GHG emiss. reduce (kTe-CO2)

Total invest. (Mdt)

Potential contribution of CDM

(Mdt) %

Energy saving and contract programme in tertiary sector

1 984 55 9.5 17%

Water solar heating 4 651 678 22.3 3%

Public street lighting 1 080 95 5.2 5%

Energy saving and contract programme in industry

9 820 275 47.1 17%

Wind energy development 29 028 738 139.3 19%

Biogas development 2 294 74 11.0 15%

Cogeneration development 18 943 548 90.9 17%

ESCO promotion 7 749 226 37.2 16%

Natural Gas substitution 6 045 590 29.0 5%

Flaring gas reduction in gas and petroleum production sites

1 394 18 6.7 38%

Total 82 989 3 297 380 12%