Aker BP decommissioning activityUK Decommissioning trade mission to Norway
12th June 2017
2
Solid footprint covering entire NCS
* Phase 1
PRODUCTION PORTFOLIO
Skarv
Alvheim
Ivar Aasen
Johan Sverdrup
Ula/Tambar
Valhall/Hod
Alvheim
High production efficiency and low operating cost
Ivar Aasen
First oil December 2016
Johan Sverdrup
World class development with break even price below 25 USD/bbl*
Skarv
Solid base performance and upside potential
Ula/Tambar
Late life production with significant upside potential
Valhall/Hod
1 billion barrels produced, ambition to produce additional 500 mmbbls
3
BUSINESS PERSPECTIVES
Creating the leading independent offshore E&P company
Reorganising the value chain with
strategic partnerships and alliancesBe at the forefront for digitizing E&P
Value chain based on a shared LEAN
understanding, toolbox and cultureFlexible business model
ready for growth and volatility
4
BUSINESS PERSPECTIVES
Management principles embedded in our culture
Drive
Performance
Make Decisions
based on Data
and Analysis
Always search for
Improvements
Develop People
and Teams
One team-one for all, all for one
SAFER
SØKENDE
ENQUIRING
FORUTSIGBAR
PREDICTABLE
ENGASJERT
COMMITTED
ANSVARLIG
RESPONSIBLE
RESPEKTFULL
RESPECTFUL
5
Nature of our decomm activity
Periodic
Increasing volume
Dominated by P&A
A range of facilities, requiring a selection of methods
AKER BP’S PORTFOLIO
Completed
• 2/4 G topsides & bridge
First wave
• Valhall QP (2019)
• Original Valhall and Hod (2022- 2026)
• Jette (2019)
• Gyda pipelines (after 2018)
Next wave
• Ula & Tambar
• Skarv
• Alvheim
Thereafter
• Valhall
• Fields not yet developed
Scope of work
Decommissioning
6
EKOFISK 2/4 G
Valhall 2/4-G Bridge – 2014
800 Tonnes
Decommissioning
Valhall 2/4-G Topside – 2016
2.200 Tonnes
7
QP REMOVAL & OVD (INCLUDING HOD)
Decommissioning
DP Topside 10.100 T
DP Jacket 12.600 T
PCP Topside 11.250 T
PCP Jacket 9.550 T
Hod Topside 1.100 T
Hod Jacket 3.450 T
Hod Drill Template 150 T
QP Topside 3.500 T
QP Jacket 4.300 T
2/4-G Jacket 3.700 T
Total Weight 59.700 T
2017 2026
8
JETTE & GYDA PIPELINES
Decommissioning
9
OVD INC. HOD
Summary
Contracting strategy
Minimise the number of interfaces to be managed by Aker BP.
Current preference is for total Engineering, Preparation, Removal and Disposal (EPRD) contracts.
Topsides and jackets removal may be separate contracts.
OVD and Hod may be separate contracts
Integration of EPRD work with cleaning and deactivation work is possible
Integration of EPRD work with P&A work is possible.
Work will be undertaken in accordance with Norwegian regulations.
Contract portfolio:
Existing TI&R FAs with Hereema and Allseas
EPRD call off awarded to Alleas for QP topsides removal in 2019
Additional TI&R FAs may be awarded
June‘17 – Jan’18: Review the procurement strategy (additional contracts, alternative to EPRD etc) for
OVD & Hod, may result in Screening and Pre-qualification of additional service providers
10
Demonstrate safe performance.
Demonstrate how you are different from the
competition • technically
• commercially
• scope of responsibility
• flexibility
• SIMOPS
• etc.
Integrate with others, or at least be willing to be
integrated – demonstrate value.
Demonstrate your relevance to our scope.
Be proactive – come and knock on our door.
Contact:
• Ron Howard, ron.howard@akerbp.com, +47 47 35 58 93,
or
• Catriona Løland, catriona.loland@akerbp.com, +47 4796 2016
How to get involved