Update: Best Local Land Use Practices

Preview:

DESCRIPTION

Update: Best Local Land Use Practices. Kirby Date, AICP January 28, 2009. BLLUP 2006/7. Awareness Sessions 10 Technical workshops Launch technical assistance Evaluation with Coastal Training Program. Lessons Learned 2006/2007. Increase technical workshops to one day, diversify presenters - PowerPoint PPT Presentation

Citation preview

Update:Best Local Land Use Practices

Kirby Date, AICP

January 28, 2009

BLLUP 2006/7

• Awareness Sessions• 10 Technical

workshops• Launch technical

assistance• Evaluation with

Coastal Training Program

Lessons Learned 2006/2007

• Increase technical workshops to one day, diversify presenters

• Provide motivation for elected officials not attending technical sessions

• Explore training for engineers

BLLUP 2008

• 2 Technical Workshops• Ongoing presentations to

communities/groups• One on one technical

assistance• DVD to promote “the

message”• Identification of new

research needs: Coastal Training Program

• Plan for targeted technical workshops

BLLUP 2008: Technical Assistance

• Springfield Township, Lucas County

• Monclova Township, Lucas County

• City of South Euclid, Cuyahoga County

• Chatham Township, Medina County

• Peninsula Village, Summit County

• Eaton Township, Lorain County

• Black River RAP, Lorain County

Lessons Learned/2008 Year

• Conduct case studies on development impact

• Train engineers in hands-on format for plan preparation and plan review

BLLUP 2009

• Ongoing awareness sessions• Expanded technical workshops• Case studies showing costs-benefits

of Best Practices• Case studies of development

implications of Best Practices• Continued technical assistance to

local communities• Work with OWRC on statewide

BLLUP initiative

Case Studies - project (draft concept)

• Two project Case Studies to illustrate engineering design of LID project throughout its life – real projects – commercial, small, redevelopment, residential – illustrate range of solutions

• One Case Study illustrating comprehensive plan throughout its life – real project

• Two “blank” project case studies for use in workshops

Case Studies -Technical (draft)

• Stream setbacks in subdivisions• Parking Lot Design• Permeable pavement• Pocket wetlands• Bioretention Cells• Dry/wet enhanced swales• Infiltration basins• Vegetated filter strips• Green roofs

Questions?