Alternatives Meeting

VT 2A/Industrial Avenue/Mountain View Road Scoping StudyWilliston, VermontSeptember 25, 2013

Project Committee

• Christine Forde CCRPC• Ken Belliveau Town of Williston• Bruce Hoar Town of Williston• Ken Robie VTrans• Rick Bryant Stantec• David Grover Stantec• Contact: cforde@ccrpcvt.org

Meeting Purpose

• Receive public comment regarding the alternative improvement plans.

Agenda

• Describe Study Process• Review Future Traffic Projections• Identify Alternatives and Performance• Describe “Viable” Alternatives• Receive Public Comment

Scoping Study Process

• Collect existing conditions data• Conduct Local Concerns Meeting• Establish project Purpose and Need• Identify potential alternatives• Evaluate alternatives.• Recommend a preferred alternative

Purposed and Need Statement

“To address existing and future traffic congestion; enhance safety for all users; and, improve bike-pedestrian travel along VT2A in Williston between Industrial Avenue/Mountain View Road and River Cove Road.”

Study AreaN

VT 2A

AccommodationsOperations

Project Area

PM Peak Hour Volumes

Existing 2033

Traffic Operations

0.79

0.92

0.98

1.19

0

0.2

0.4

0.6

0.8

1

1.2

1.4

Existing ‐ 2013 Future ‐ 2033

Volu

me-

to-C

apac

ity R

atio

AM Peak Hour

PM Peak Hour

Delay vs. V/C Ratio Curve

0

50

100

150

200

250

300

0 0.5 1 1.5

Del

ay p

er V

ehic

le (S

econ

ds)

Volume to Capacity Ratio

Simulation: 2033 PM Peak Hour

Option 1: Add Westbound Left-Turn Lane

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 0.95PM 1.19 1.17

Option 2: Add Eastbound Left Turn Lane to Option 1

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 0.91PM 1.19 0.99

Option 3: Add Northbound Through Lane to Option 2

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 0.89PM 1.19 0.89

Option 4: Change Lane Use on Industrial Avenue, Add Westbound Left-Turn Lane

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 0.90PM 1.19 1.09

Option 5: Add Northbound Through Lane to Option 4

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 0.90PM 1.19 0.98

Option 6: Single Lane Roundabout

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 1.59PM 1.19 1.37

Option 7: Dual Lane Roundabout

V/C RATIO

2033 2033 WITHIMPROVEMENTS

AM 0.92 0.82PM 1.19 0.85

Viable Options: Lane Additions

Viable Options: Dual Lane Roundabout

Comparison of Alternatives

Benefit or Impact Lane Additions RoundaboutWorst V/C Ratio 0.89 0.85“Life Expectancy” 31 Years 35 YearsAdded Pavement 25,000 SF 24,000 SFROW Takings-Area 5,200 SF 1,300 SFROW Takings-Parcels 15 Parcels 5 ParcelsTree Loss 7 Trees 5 TreesUtility Poles Moved 14 12

VT 2A Alternatives

Proposed Improvements for VT 2A North of River Cove Road

Looking North

Pedestrian Safety

• Pedestrian Actuated Rapid Flashing Beacons• Crosswalks• Pedestrian Refuge Island

3 Lane Cross-Section with East Side Sidewalk

Looking North

Existing Conditions with East Side Sidewalk

Looking North

Option N1: Three-Lane Section

Option N2: Add Sidewalk on East Side

Comparison of AlternativesBenefit or Impact

Existing 3-Lane Cross Section

3-Lane Cross Section + Sidewalk

Existing + Sidewalk

Sidewalks One Side One Side Two Sides Two Sides“Bike Lanes” On Street On Street On Street On StreetRefuge Islands No Yes Yes NoNew Pavement None 27,000 SF 50,000 SF 19,000 SFROW Takings-Area

None None 15,000 SF None

ROW Takings-Parcels

None None 17 Parcels None

< 25 Feet of Driveway

None None 2 Parcels None

Tree Loss None 6 Trees 11 Trees 5 TreesUtility Poles None 14 14 14

Comments and questions

Next Steps

• Refine Plans• Present to Planning Commission on October 1, 2013• Present to Selectboard on October 21, 2013• Submit Final Report

Other Options

Other Options

Other Options

Other Options

Other Options

Other Options

Other Options

Other Options

Recommended