Waste to Energy Assessment - Recycling Council of Alberta · Tonnes CO 2e Landfill Tonnes CO 2e...

Preview:

Citation preview

Waste to Energy AssessmentRecycling Council of Alberta WTE Symposium

Thursday, March 12, 2020

Presentation Overview1. Planning Process in BC2. WTE Overview3. Intro to Comox Strathcona Waste Management (CSWM)4. WTE Study Results5. Questions

Overview Plan Review Process1. Initiate the

Planning Process

2. Set Plan Direction

3. Develop and Implement

Consultation Plan

4. Evaluate Options

5. Prepare & Adopt the Plan

Approach to Solid Waste Planning

§Current System Review§Waste Diversion

§ Reduce, Reuse and Recycle§Energy / Materials Recovery§Residual Waste Management§System Financing

MOE WTE Considerations§ Focus on waste hierarchy, waste reduction

§ Set a 350 kg/capita/year disposal target§WTE must be in solid waste management plans, approved by

MOE§Assess and compare treatment and disposal options§Adopt best achievable technology§Meet air emissions requirements for solid waste facilities

WTE Overview§Conventional WTE systems

§ Essentially power plants using waste as fuel instead of natural gas, coal or wood

§Advanced WTE systems § Pyrolysis / gasification – convert carbon-based waste into gas burned

for power, or converted to fuel (for burning)§ In BC MOE doesn’t consider anaerobic digestion WTE§Mixed waste processing – considered alongside other recovery

options

The role of WTE in an Integrated System

§With recycling and organics treatment:

Recycling

Landfill Landfill

ThermalTreatment

OrganicTreatment

Metro Vancouver WTE

§Operational since 1988§ 250,000 tonnes per year§Numerous upgrades§Meets all air emission

standards

York Durham WTE§ Newest large-scale WTE plant in Canada. Started operations 2016§ Mass burn technology§ Capacity 140,000 tonnes per year, upgrading to 160,000 tonnes§ Ultimate capacity 400,000 tonnes per year

Chester, NS WTE

§ 70,000 tonnes per year§ Technology is pyrolysis §Producing synthetic diesel, refuse

derived fuel (RDF) and potential to make biochar for agricultural applications

§Currently being commissioned. Expected to run at capacity in early 2020

Comox Strathcona Waste Management (CSWM)

CSWM Overview§Geographically large – 24,000 km2

§ Two regional districts – population of 112,000§Over 100,000 tonnes of waste and recycling managed§Moving to one regional landfill (65,000 tonnes) §Solid waste management plan

§ Updated in 2011§ Reviewed again in 2017

§ 2011 review – detailed study of WTE costs and GHG emissions

CSWM Full System Costs

2018 WTE Study Overview§Update 2011 study – costs and greenhouse gas emissions for

scenarios§Assess three potential locations §Estimated scenario costs:

§ Transfer station construction and operation§ Landfill operation, closure and post closure§ WTE facility construction and operation

§Estimated GHG emissions for each scenario

Review and Shortlist Process§Request for Information (RFI) issued for vendors§Six vendor submissions reviewed§Essential and desirable criteria developed §Submissions evaluated and scored§Shortlisted three vendors for further review§Potential costs and GHG emissions assessed for two

Waste flow – Status Quo

Waste flow – Sustane

Waste flow – Waste Treatment Technologies

Average Disposal Cost per Tonne

Increasing capacity - Estimated average disposal cost per tonne

Option Over 40 years

0 Status Quo $75

1(a) WTT in Comox Valley $163

3(a) Sustane in Comox Valley $107

Total Disposal Costs

System Cost Breakdown

GHG emissions over 40 years

Option TechnologyTonnes CO2e

LandfillTonnes CO2e

Transfer Stations

Tonnes CO2eTotal

Tonnes CO2e

0 Status Quo 0 890,000 9,000 899,000

1(a) WTT in Comox Valley -1,060,000 178,000 9,000 -873,000

3(a) Sustane in Comox Valley -339,000 178,000 9,000 -152,000

What now in BC?§Continued interest in WTE and related technologies

§ Strong interest in Sustane facility in Nova Scotia§Also strong interest in mixed waste processing

§ Municipal solid waste or construction / demolition§Continued move toward organics diversion

§ Composting and / or anaerobic digestion

THANK YOU

Todd Baker, P. Eng.778-874-4299tbaker@morrisonhershfield.com

Recommended