View
163
Download
1
Category
Preview:
Citation preview
ADCET, Ashta
Project name:-’S.T.reservation’
1] Member of the project group:-1.Nadaf Vasim .R
2] Name of the project guide:-Mr. Kamble V.A and Mr. Sale V.M
WELCOME TOMSRTC
LoginUser name:________Password :_________
_________________________________________________________________________
INDEXSr. No. Title Pg. no.
1 Main menu 4
2 Booking and new record 5
3 Journey Detail 6
4 Route 7
5 Seat 8
6 Passenger Detail 9
7 Charges 10
8 Collection & list of all booking 11
9 Deleting & existing Booking 12
10 After Deleting 13
MAIN MENU
• -------------------------------------------------------------1. BOOK A NEW RECORD2. COLLECTION & LIST OF ALL RECORDS3. MANAGE RECORDS4. EXIT----------------------------------------------------------------ENTER U R CHOICE=
1. BOOKING ADD NEW RECORD---------------------------------------------
• TRAVAIL DETAIL__
• Date= dd/mm/yyyy • Time= hh:mm:ss
• Type= as/sc/ordinary
• Adult= • Child= Contnue..(Y/N)=……
JOURNEY DETAIL___
• FROM=
• TO=
• ROUTE=
• CHILDEN less than 5 years=
____Route____Sr. no
Time Route name Type Reach fare
1.
Select any one =Continue…..(Y/N)=
___SEAT___ENTER Y 38 39
5 6 7 8
9 10 11 12
13 14 15 16
17 18 19 20
21 22 23 24
25 26 27 28
29 30 31 32
33 34 35 36 37
SELECT SEAT NUMBER== _____SAVE & CONTINUE.(Y/N)=….
___PASSENGER DETAIL___SR.NO. PASSENGER
NAMESEX M/F
AGE SEAT RATE
1. VASIM M 20 5 250
.
.
SAVE AND CONTENUE.(Y/N)=…
____CHARGES____• CHARGES___
• Fare=_____+7=______• 7 Rs. for reservation.• Total passenger (n)=______xfare
• Total child(c)=______x(_____+7)
• Total Amout=_______
Save and contenue.(Y/N)=..
2.COLLECTION & LIST OF ALL BOOKING_________________________________vies of all collection & list booking_ Name of the booker__ Day___ Date___ dd/mm/yy Time____hh:mm:ssSr.No.
Name age Sexm/f
seat route from To
date time amout
save &contenue(Y/N)=…
__3.Deleting existing booking_____________________________
• Do you want to delete record (press Y/N)=…• Record has been delete SUCCESSFULLY !• Continue(Y/N)=…..
After deleting…• 2.COLLECTION & LIST OF ALL BOOKING• _vies of all collection & list booking• _ Name of the booker__ Day___ Date___ dd/mm/yy Time____hh:mm:ssSr.no name ageim
eSexm/f
seat Rouefrom
to date Time Amont
____4.EXIT____
…..THANK YOU….._______________
DATA FLOW DIAGRAM(DFD)
• 0_LEVEL DFD____
USER/PERSON
SYSTEM
OUTPUT
FLOW CHART•
• CORRECT PASSWORD
START
LOGIN
IF PASSWORD ACCEPTED
MENU
DTA BASE SYSTEM
EXIT
INCORRECT PASSWORD
SYSTEM DEVELOPMENTDFD 1-LEVEL DFD USER
RE - ENTER PASSWORD
LOGIN
ADD RECORD COLLECTION DELETE EXIT
DATA SYSTEM
1. ABSTRACT
Traveling is a large growing business in India and other country. It also includes maintenance of information like schedule and details of each bus.
We observed the working of the Bus reservation system and after going through it, we get to know that there are many operations, which they have to do manually. It takes a lot of time and causes many errors. Due to this, sometimes a lot of problems occur and they were facing many disputes with customers. To solve the above problem, and further maintaining records of items, seat availability for customers, price of per seat, bill generation and other things, we are offering this proposal of reservation system.
By using this software, we can reserve tickets from any part of the world, through telephone lines, via internet.
2. INTRODUCTION
Our project is to computerize travelling company to manage data, so that all the transactions become fast and there should not be any error in transaction like calculation mistake, bill generation and other things. It replaces all the paper work. It keeps records of all bills also, giving to ensure 100% successful implementation of the computerized Bus reservation system.
Our reservation system has three modules. First module helps the customer to enquire the availability of seats in a particular bus at particular date. Second module helps him to reserve a ticket. Using third module he can cancel a reserved ticket.
————————————————————————————————————
Requirements analysis_________
This is requirement for S.T.Reservation system project is follow:_software requirement:- 1) Turbo C & Cpp
2) operating system like window Xp_Hardware requirement:-
1) Minimum CPU cofiguration: 2) 512 MB of RAM 3) 20 GB Hard disk space for managing ,
S.T.reservation.
Literature ,review or other schemas:-
This should contain list of all referenced papers , books, website ,visited s.t . stand, etc.[1] for this project we referred books,
a) programing in ANSII ‘C’ -E Balagurusamy.b) programing in let’s ‘C’ -Yashwant kanetkar
[2] Also , for these project we take information from bus stand._Mr. S.P.Patil
[3] Also , for these project we referred some special website from internet .
1)www.sourcecode.com2)www.bus reservation.com3)mini project in c&cpp4)www.1000projects.com
[4] Introduction of software engineering. _Pankaj Jalote
CLIENT REQUIREMENTS:-
1)CURRENT REQUIRMENT:2)FOR SECUIRITY PURPOSE LOGIN WITH PASSWORD:3)MAIN AUTHORITHORITY:4)ADDING NEW RECORD :5)LIST OF ALL COLLECTION RECORD:6)DELETE BOOKING:7)EXIT
FLOW CHART DIAGRAM:-
NEW BOOKING RECORD
TRAVEL DETAIL
JOURNEY DETAIL
PASSENGER DETAIL
CHANGES
EXIT
ROUTE
SEAT
PROPOSED WORK:-
In the s.t .reservation /bus reservation project all information is display like___
1)new record 2)list record 3)delete record 4) exit
These above information take only computer department , this project also give :-
•Ensure data accuracy.•Records are efficiently maintained by DBMS.•Availability of seats can be enquired very easily.•Passengers can also cancel their tickets easily.•Minimum time needed for the various processing.•Better Service.•Minimum time required.
INTRODUCTION:-
IN MY S.T.RESERVATION MINI PROJECT ALL BUS RESERVATION INFORMATION ARE STORED . IN THIS PROJECT ONLY VASIM NADAF ARE WORK . AND THESE PROJECT ARE DOING IN C& CPP LANGAUGE.USEING THE HARD WARE &SOFTWARE REQUIRMENT .IN THESE PROJECT:
1] THE DATA FLOW DIAGRAM,FLOW CHART & RECOED LIST ADDED FOR S.T.RESERVATION
Recommended