P R O J E C T D E S C R I P T I O N
Name of Project: WOODCREST RESIDENCES
Location: Don Quijada St., Guadalupe, Cebu City
Type of Development: 9-Storey Residential Condominium
Total Project Cost:
Project Duration: June 2008 to June 2010
P R O J E C T D E S C R I P T I O N
Building Allocation Data :
Parking Area - 3,562.17 sq.m. Sellable Area - 9,140.60 sq.m. Common Area - 2,960.77 sq.m. Total Building Area - 15,663.54 sq.m.
Land Allocation Data :
Building Footprint - 2,457.92 sq.m.
Amenities (Clubhouse and Pool)- 522.00 sq.m.
Roads - 2,203.98 sq.m.
Future development - 3,425.95 sq.m.
Total Area - 8,759.00 sq.m.
P R O J E C T D E S C R I P T I O N
Total No. of Units : 136 unitsTotal No. of Parking Slots : 132 units
Unit Type No. of Units Area
Studio Type 24 32.00
2-bedroom 90 69.00
2-bedroom special 02 47.80
Den 02 57.20
Regular Loft Type 10 122.48
Deluxe Loft Type 04 133.71
Premium Loft Type 04 177.10
To drainage route
To drainage route
To drainage route
SITE DEVELOPMENT PLAN
WOODCREST RESIDENCES
FRONT ELEVATION
RIGHT SIDE ELEVATION
LEFT ELEVATION
REAR ELEVATION
LOWER GROUND FLOOR PLAN
Ramp down
UPPER GROUND FLOOR PLAN
Ramp up
SECOND FLOOR PLAN
THIRD FLOOR PLAN
FOURTH - SIXTH FLOOR PLAN
SEVENTH FLOOR PLAN
EIGHTH FLOOR PLAN
NINTH FLOOR PLAN
Back to THE CONDOMINIUM
STUDIO TYPE UNIT
STUDIO TYPE UNITUnit =27.75 sq. m.Porch=2.15 sq. m.
Balcony=3.85 sq. m.
2 - BEDROOM UNIT
2 BEDROOM UNITUnit =55.60 sq. m.Porch=2.80 sq. m.
Balcony=7.70 sq. m.
REGULAR LOFT TYPEDELUXE LOFT TYPEPREMIUM LOFT TYPE
GROUND FLOOR (REGULAR / DELUXE / PREMIUM)
LOFT UNITSUnit =55.65 sq. m.Porch=2.75 sq. m.
Balcony=7.70 sq. m.
SECOND FLOOR-REGULAR LOFT
Regular LoftUnit =51.44 sq. m.
Balcony=7.70 sq. m.
SECOND FLOOR-DELUXE LOFT
DELUXE TYPE UNITUnit =28.81 sq. m.
Balcony=41.25 sq. m.
SECOND FLOOR-PREMIER LOFTBack to THE CONDOMINIUM
PREMIER UNITUnit =51.44 sq. m.
Balcony=56.78 sq. m.
PROJECT DETAILS
GENERAL CONTRACTOR – PRIMARY STRUCTURES CORPORATION (PSC)
READY-MIXED CONCRETE SUPPLIER –CONCRETE SOLUTIONS INC. (CSI)
MATERIAL SPECIFICATIONS
1.) PERIMETER WALLS PRE-CAST/PRE-FABRICATED CONCRETE
4.) ROOFING PRE-PAINTED LONG SPAN METAL STEEL TILE
2.) INTERIOR DRY WALLS 3/8” GYPSUM BOARD ON METAL STUDS
3.) TOILET & BATH WALLSPRE-CAST PANELS
5.) FLOORING LIVING, DINING, KITCHEN – CERAMIC TILES CR FLOOR & WALL - CERAMIC TILES BEDROOMS - LAMINATED WOOD
MATERIAL SPECIFICATIONS6.) DOORS
MAIN DOOR - STEEL DOOR W/ PEEPHOLESBEDROOM - PVC COATED STEEL DOORSBALCONY - ALUMINUM SLIDING DOORS W/
GLASS PANELS7.) WINDOWS
ALUMINUM SLIDING WINDOWS W/ GLASS PANELS
10.) TOILET & BATH ACCESSORIESCOMPLETE SET OF WATER CLOSET, LAVATORY & SHOWER
9.) KITCHEN COUNTER SYNTHETIC MARBLE WITH SINK & ACCESORIES
8.) CABINETRIESPRE-FABRICATED MELAMINE BOARDS
SITE INLET
OPEN CANAL
SITE OUTLET
STREET OUTLET
STREET OUTLET
DRAINAGE DISPOSAL ROUTE
PROPOSED STP
EXISTING SITE DRAINAGE INLET
Back to site drainage
EXISTING OPEN CANAL
Back to site drainage
EXISTING SITE DRAINAGE OUTLET
Back to site drainage
EXISTING DRAINAGE STREET OUTLET
Back to site drainage
EXISTING DRAINAGE STREET OUTLET
Back to site drainage`
HAPPY VALLEY, BANAWA
TISA, LABANGON
TRES DE ARIL, LABANGON
N. BACALSO AVE.
C. PADILAA ST.
S.R.P.
Back to THE SITE
Back to THE CONDOMINIUM
Back to site drainage
Next Page
THE SITE
HAPPY VALLEY , BANAWA
Back to drainage route
TISA , LABANGON
Back to drainage route
TRES DE ABRIL, LABANGON
Back to drainage route
N. BACALSO AVE.
Back to drainage route
C. PADILLA ST.
Back to drainage route
SOUTH RECLAMATION PROJECT
Back to drainage route
VOLUME OF WASTE WATER GENERATED
No. of Units (A) : 130 units No. of Occupants (B) : 3 persons Water Consumption Per Capita (C) : 120.00 liters/capita/day % of Occupancy (D) : 70%
Total Volume Per Day (E)= (AxBxCxD) 33.26 cubic meter
Total Volume Per Hour (F)= (E/12 HOURS) 2.77 cubic meter
Total Volume Per Minute (G)= (F/60) 0.05cubic meter
Back to drainage route Back to site drainage
Back to site drainage`
END OF THE PRESENTATION...
THANK YOU VERY MUCH...