1

11 Successful Implementation & Improved Operation

Installation – Issues and SolutionsAndreas AgostinIndustrial Network Sales Specialist Asia PacificMTL Instruments Singapore, part of Cooper Crouse-Hinds

15.05.2013 Perth

2

22 Successful Implementation & Improved Operation

Introduction

Fieldbus is in use since 19981, yet still new for many customers today.

This presentation will look at the installation issues and the “lessons learned”, so that you can benefits from their experience.

1 Shell Malampaya is one of the early, larger projects. 1600 FF instruments are in use. The project produced first gas in Oct 2001. Source: J. Seaver, Shell Philippines Exploration B.V., “Malampaya Deep Water Gas-to-Power Project: Malampaya Subsea Development”, Offshore Technology Conference, 6 May-9 May 2002, Houston, Texas.

3

33 Successful Implementation & Improved Operation

Introduction� The pictures you will see are collected from “real”

projects; they are neither simulated nor “demo”.

� We will look at – Control room: cabinet design and wiring– Field: Wiring, field junction boxes, field device installation.

� Processes typically involve explosion protection methods “intrinsic safety” (I.S. / Ex i; energy limitation by a ‘barrier’) or “explosion proof” (Ex d; protection by explosionproof enclosure).Many examples use “IS” as this is a key product of my company and that is where I get involved.

4

44 Successful Implementation & Improved Operation

DisclaimerAll products shown serve as EXAMPLE only.In particular, problems shown in conjunction with a product

serve as example only.

The brand/make/model of the product serving as exampleis IRRELEVANT .

Problems highlighted serve as example only, are do in no way express problems with a particular product, model or brand.

5

55 Successful Implementation & Improved Operation

The conventional system

6

66 Successful Implementation & Improved Operation

Control room – Conventional wiring

2nd level 1st leveljunction box Marshalling

and barrierControl system

7

77 Successful Implementation & Improved Operation

Control room – Conventional wiring

Marshalling: to group AI / AO / DI / DO / etc

8

88 Successful Implementation & Improved Operation

Control room – Conventional wiring

9

99 Successful Implementation & Improved Operation

Control room – Conventional wiring� Long wires, standard length� Allows pre-fabrication of wire

(ferrules, mounting)� Conventional signals (4-20mA,

RTD, thermocouple, 0-5V/10V/24V) – slow, hardware filtered, length less important

10

1010 Successful Implementation & Improved Operation

Field – Conventional wiring

� Quality (material)� Safety� Location / access� Weight/size, …

10

11

1111 Successful Implementation & Improved Operation

Fieldbus versus conventional

12

1212 Successful Implementation & Improved Operation

Control room – DCS wiring EXAMPLES

Fieldbus

Conventional

13

1313 Successful Implementation & Improved Operation

Control room – DCS wiring EXAMPLESInstallations do not have

to look messy. They can be very nice, too.

Fieldbus

Conventional

14

1414 Successful Implementation & Improved Operation

Control room – DCS wiring EXAMPLESFieldbus Conventional

15

1515 Successful Implementation & Improved Operation

Control room – DCS wiring EXAMPLES

FieldbusFieldbus

16

1616 Successful Implementation & Improved Operation

Control room – DCS wiring

Important:do not use individual wires to wire cabinet. Use fieldbus cable and shield properly.

Why?

Higher signal frequency – protect them against disturbances.Individual wires will cause crosstalk from one wire to another –communication faults can occur.

??

17

1717 Successful Implementation & Improved Operation

Fieldbus CableRecommended:Type A cable: Shielded twisted pair

Other cable is possible, but there are limitations in terms of achievable cable distance and electromagnetic compatibility (EMC).

Fieldbus is a digital “high speed” (31kBit/s) communication, a current modulated signal superimposed on the DC power.

18

1818 Successful Implementation & Improved Operation

Fieldbus Cable

Shielded pairprinciple

Foilshield

Foil plusbraidedshield

SWA

Not round – Not recommended

Ideally round – Recommended

Fillers (solid or fiber)

19

1919 Successful Implementation & Improved Operation

Fieldbus Cable

SWA Multi-pair

Multi-pair (multi-trunk)

20

2020 Successful Implementation & Improved Operation

Please not this way

Images obscured – Brand is irrelevant.

21

2121 Successful Implementation & Improved Operation

Control room – DCS wiring

22

2222 Successful Implementation & Improved Operation

Fieldbus system – Field wiring

??•• Parallel wiring Parallel wiring

(terminals)(terminals)•• special wiring special wiring

blocksblocks•• (daisy chaining)(daisy chaining)

23

2323 Successful Implementation & Improved Operation

Fieldbus system – Field junction boxes

Principle of wiring distribution in junction box:all devices are in parallel

Source: FF AG 140 Rev. 1

24

2424 Successful Implementation & Improved Operation

Fieldbus system – Field junction boxes

Please not this way

25

2525 Successful Implementation & Improved Operation25

Fieldbus system – Field junction boxes

Use dedicated wiring blocks with built-in electronic short circuit protection.

LEDs: - built-in s/c protection

26

2626 Successful Implementation & Improved Operation

Good Wiring Practices� Test segment wiring before connecting components� Avoid damaging the wire when removing insulation� Ground the cable shield only at one point (at the control

room end)� Insulate the ungrounded end of the cable shield (at the

instrument)� Ground armor on both sides (potential equalization)� Use crimp ferrules

– Ferrule diameter must fit wire– Crimp tool must fit ferrule– Ferrule must fit terminals

� Maintain polarity and associated color codes throughout the segment

27

2727 Successful Implementation & Improved Operation

Good Wiring Practices

� Lessons learned:� Torque screwdriver� Wire end ferrules� Right (!) wire strippers� Fieldbus tester

Harmswire strands

Chooseright size

AWG ..

28

2828 Successful Implementation & Improved Operation

Fieldbus Design Tools(Examples)

29

2929 Successful Implementation & Improved Operation

Project Procedure

Best practice:� Bench test

Functional tests and interoperability test� FAT� SAT

30

3030 Successful Implementation & Improved Operation

Installation Guidelines� Cable Tests

– Experience has shown that new cable irregularities are so infrequent that it is more efficient to check cable after installation

� Cable Installation– Verify that cable is properly installed, bypassing impact

from wiring components� Segment Checkout

– Check of proper wiring of wiring components� Device installation

– Check of proper device installation� Loop checkout

– Functional test

31

3131 Successful Implementation & Improved Operation

Installation tools

Portable fieldbus diagnostic test equipment(Handhelds)

� Measures relevant fieldbusparameters

� Establish baselineafter commissioning

32

3232 Successful Implementation & Improved Operation

Handheld diagnostic tools

Handheld Diagnostic Tool

Device 1 Device 3 Device 2

T

Device Coupler& Terminator

(non-IS) Spurs

FFPST

FF Power Supply& Conditioner&Terminator

24VDC

HostComputer

H1 Interface

Connect at respective location to obtain accurate measurement.

33

3333 Successful Implementation & Improved Operation

Handheld diagnostic tools

Handheld Diagnostic Tool

FFPST

FF Power Supply& Conditioner&Terminator

24VDC

HostComputer

H1 Interface

Fieldbus barrier

Device 1 Device 3 Device 2

Fieldbus barrier& Terminator

IntrinsicallySafe Spurs

T

Fieldbus

barrier

To measure at fieldbus barrier/IS segments, Handheld needs to be Ex i approved.Important since the galvanic isolation of fieldbus barrier impacts on measurement.

34

3434 Successful Implementation & Improved Operation

Earthing/Grounding

� Grounding in the control room� One point grounding only� Continuous shield from control room to the field� Shield not connected at the field instrument

� Connect cable armor at both ends (potential equalization)

35

3535 Successful Implementation & Improved Operation

Earthing/Grounding

Device 1 Device 3 Device 2

T

Wiring Block& TerminatorFFPS

T

FF Power Supply& Conditioner&Terminator

24VDC

HostComputer

H1 Interface

36

3636 Successful Implementation & Improved Operation

Fieldbus barrier

Device 1 Device 3 Device 2

Fieldbus barrier& Terminator

IntrinsicallySafe Spurs

T

Fieldbus

barrier

Earthing/Grounding

FFPST

FF Power Supply& Conditioner&Terminator

24VDC

HostComputer

H1 Interface

37

3737 Successful Implementation & Improved Operation

Local field junction box for 4 instruments. Rust prevented proper grounding, so that separate ground connection was required

38

3838 Successful Implementation & Improved Operation

Field – Fieldbus wiring

Green: fieldbusRed: Power (Motors, etc)

For easy maintenance

39

3939 Successful Implementation & Improved Operation

Troubleshooting

40

4040 Successful Implementation & Improved Operation

Daisy chaining – not recommended

41

4141 Successful Implementation & Improved Operation

Troubleshooting

Electrical welding can generate significant surges

42

4242 Successful Implementation & Improved Operation

Bend radius too tight, Upward facing gland risks water ingress

Two cables into one glandprevents sealing of gland

43

4343 Successful Implementation & Improved Operation

Water ingress caused corrosion of wire and terminals

44

4444 Successful Implementation & Improved Operation

Cable jacket stripped back too far

Troubleshooting

45

4545 Successful Implementation & Improved Operation

Wires coming out of ferrules

46

4646 Successful Implementation & Improved Operation

Troubleshooting

Earth stud not connected – internal surge protectors not working

47

4747 Successful Implementation & Improved Operation

Troubleshooting

Ground not connected

48

4848 Successful Implementation & Improved Operation

Troubleshooting

Poor cable (shield) quality

49

4949 Successful Implementation & Improved Operation

Troubleshooting

Grounding concept failure-prone

50

5050 Successful Implementation & Improved Operation

Troubleshooting

Water marks, fungus inside junction box

51

5151 Successful Implementation & Improved Operation

Troubleshooting

Wire squeezed by enclosure lid – water ingress

52

5252 Successful Implementation & Improved Operation

http://forums.fieldbus.org/showthread.php?t=1298

53

5353 Successful Implementation & Improved Operation

Conclusion

� Fieldbus is robust if the installation is adjusted to the requirements of a digital communication line

� Do not simply copy 4-20 methods� Use fieldbus smartly (e.g. eliminate marshalling)� Good wiring practices are more important than

on 4-20 due to bus structure� Train your installers on fieldbus practices

54

5454 Successful Implementation & Improved Operation