Capstone turbine corporation e-finity distributed generation

Preview:

Citation preview

Capstone Turbine

E-Finity Distributed Generation The Power to be Independent

Authorized Capstone® Distributor

Capstone Turbine Corporation

Who is Capstone? • Develops • Manufactures • Sells & • Services MicroTurbine Technology

The MicroTurbine Leader

• Founded 1988 • 1st company to introduce a

MicroTurbine • 100% MicroTurbine focused • 7000+ units sold and shipped • Million’s  of  documented  run  

hours

50,000,000

Made in America

• “Made  in  America” • 75+% US Steel • USA owned and operated • >100 Patents Worldwide • ISO 9001:2000 • UL-2200 & 1741 certified

(1) Fuel (4) Benefits Out

1. Reliable Hot Water

2. Reliability Chilled Water

3. Reliable Electricity

4. Reliable Back-Up Power Clean & Green

Local Power Generation

Power When You Need It Where You Need It

E-Finity

E-Finity Distributed Generation The Power to be Independent

Mid-Atlantic & Southeastern Regions

Authorized Capstone® Distributor

E-Finity Actively Supports EPA

Active DOE Clean Energy Member

9

Trade Associations

Factory Certified and Supported

E-Finity Provides Authorized Capstone:

Conceptual  Design  Approval  (CA)  Service’s Factory Trained Installer Services (FTI) Authorized Service Provider (ASP) Long Term Maintenance (FPP)

Capstone Technology

Single Stage Jet Engine

• 1750 F Combustion • Recuperated • 3 Air Bearings • “Electronic”  Gearbox • Stand-Alone Capability

Single Stage Jet Engine

• 1750 F Combustion • Recuperated • 3 Air Bearings

• 1 moving part: Turbo Generator Shaft

Patented Air Bearing Turbine

Spring

Foil

Shaft

• Air bearings No oil or grease

• Air cooled No anti-freeze or liquids

• Variable speed 45,000 to 96,000 RPM

Worry Free Operation

Lowest Maintenance Available

• Air-Cooled • One Moving Part • Air Cooled Electronics • No Lubricants or Antifreeze • No Spark Plugs / Lifters, etc • Complete Remote Monitoring & Trouble

Shooting • No post-combustion devices or chemicals

Lowest Carbon Footprint

• Low emission design • Super-low NOX

- Less than 9ppm - .14 to .16 g/hb-br

Endorsed by the SCAQMD

• No additional Catalysis requirement

Remote System Diagnostics

• Data Logging & Storage – monitors and records key system

data 24x7 • Real-Time Notification

– alert and local CST Technician notification

• Balance of Plant Interactivity

– monitoring of compressors, water flow and temperatures, etc.

Capstone Products

Capstone Turbine

•C30, C65, C200, C600, C800, C1000 •Natural Gas •Propane •Digester, Landfill and Goal Bed Methane

Simple Modular Solutions

Grid Connect Stand Alone

Dual Mode

CHP  App’s

HP Natural Gas

Landfill/Digester Gas

Sour Gas

Liquid Fuel & Propane

30 – 65 kW net output Product Offerings

Simple Modular Solutions

65 kW Heat Recovery

Grid Connect Stand Alone

Dual Mode

CHP  App’s

HP Natural Gas

Landfill/Digester Gas

Sour Gas

Liquid Fuel & Propane

200 – 1000 kW net output

Product Offerings

C600 expandable to C800& C1000

Capstone Solutions

Reliable Onsite Electric

Peak Shaving

Load Following

Clean Reliable Back-up Power

- Straight Line 60Hz @ 480 Volts

Integrated CHP Module

Heat Recovery Module

Model C65 MicroTurbine

Integrate with Absorption Chillers

Every C65 MicroTurbine produces 20 Tons Chilled Water Can be Exhaust Fired or Hot Water Fired

C200 with External HRM

Capstone C1000

Hot Water = 500 gpm Chilled Water = 300 Tons Steam = 3500 Mlbs/hr 1000 kW Clean Power

C1000 Series with Heat Recovery

Dual Mode System Controller

Islanding from Utility

• MT Monitors Utility Voltage • Identifies Abnormality • Opens Motorized Breaker • Isolates BLDG from Utility • DMSC verifies Island • MT Sets back to Load State

Less than 5 Seconds

Dual Mode System Controller

Return to Utility

• Upon Utility Return the DMSC • Sends Signal to MT to Start System Timer for

Reconnection (Customer Specified, Generally 5 Minutes)

• MT Disconnects & DMSC Closes Breaker • System Resumes Normal Operation • MT Begins Recharge Mode

MT Never Shuts Down

Factory Support Services

PROPRIETARY AND CONFIDENTIAL Capstone Turbine Corporation 33

Capstone FPP Benefits

• 24 Hour Technical Support

• Response time within 24 hours

• 24 Hour remote monitor and alarming to Capstone and Customer

34

Capstone Remote Monitoring

• Web access to sites • Data Logging • Alarming • Remote trouble shooting • Less windshield time

Capstone Preventative Maintenance

Servicing injectors at 20,000 hrs on a BP platform Capstone MicroTurbine

8,000 Hours

Air Filters Clean/Replace Fuel Filter Replace Igniter Replace

20,000 Hours

Injectors Replace Battery Pack Replace Thermocouple Replace

40,000 Hours

Engine Exchange

• Typical Maintenance cost of $1.00 MTRH • Average of 6 Hours of Planned mtn/Yr • Capstone will guarantee cost of planned

and unplanned maintenance

Simple Overhaul in Minutes

Four Bolts Disconnections Generally (2) 2 hours

Back on Line!

CHP Plus & Minus

Reasons to Encourage CHP

• Lower carbon footprint (EPA) • Power independence (DOE) • Help meet Renewable Energy Portfolio Standard (States) • Funds infrastructure upgrades & improvements • Encourages the use of energy efficiency technologies • Lowers energy costs • Helps keep the door open • Create new Green Job

Barriers inhibiting CHP • Utility standby charges or ratchet penalties • Electric utility discouragement (Cogen Killers) • Incentives with “Open & Close “ window programs • Onerous submission process • 3rd party implementers add layers and costs • Lack of value for net metering (export to grid) • Looses to “Low Hanging Fruit” • Lack of awareness (changing)

Additional Barriers ?? • Interconnection • Permitting • Financing

The biggest one

Lack of Parody for ITC’s

Solar / Wind = 30%

CHP = 10%

70-90% efficient yet the lowest ITC ????

E-Finity Applications

Viking Yacht (NJ Manufacturer)

•NJ Incentive •New Equipment •100% Heating & AC •40% Self Electric Generation •Slashed Carbon Foot Print Barrier > Incentive Challenges

York Sewer Authority (PA WWTF)

• PA DEP Incentive • New Equipment • Renewal Energy Project • $300,000 Savings / Yr • Significant Carbon Savings • 100% US Made Products Plus > Incentive Challenges

Gas Storage Site

Stand-A-Lone Site

•100% Site 3 Phase Power •100% Building Heat & Fuel Gas Heating • (4) C65 ICHP & (5) C65 •1st Commissioned 2006

Industrial Gas Plant

Electric & Hot Water

Combined Heat & Power Fours Seasons Philadelphia

Combined Heat & Power Fours Seasons Philadelphia

• 100% Hot Water • 25% Building Electric • 15% Building Heat

Emphasis was on:

•Controlling Energy Costs •Reduce Greenhouse-Gas

Emissions

Tri-Generation Philadelphia Gas Works

• Capstone C200 Turbine

• Hot Water Heat Exchanger

• 40 Ton Hot Water Absorber

• Capstone Logic Controller

Electric Load Following UGI Headquarters

PPL Utility Meter set at 0kW Capstone Makes 100% of Building Electric

Combined Heat & Power Bristol Bridge

•100% Building Electricity •100% Building Hydronic Heat •Future 90Tons Absorption Chilling

Islanding Capable Dedicated Back Up Power

for Exhaust Hood Containing Dangers

Fumes

Heating / Cooling/ Islanding CHP Salem College, New Jersey

Red Cross Disaster Relief Facility

•195kW Electric Load Following •100% Hot Water •100% Chilled Water •Island / Stand Alone Site

Questions & Answers

Recommended