ct5308 Breakwaters and Closure Dams

H.J. Verhagen

Faculty of Civil Engineering and Geosciences Section Hydraulic Engineering

February 1, 2012 2

elements

• Lectures • Book:

Breakwaters and Closure Dam Verhagen, d’Angremond & Van Roode published by Spon, UK £ 40 (paperback) available via VSSD (normal €39.50, members € 19) available as “netbook” via Library (only TU-ip)

• Website: via Blackboard go to course ct5308 • practical information • PowerPoint presentations • additional texts

• Assessment: • via exercise • via oral examinations

February 1, 2012 3

Netbook version

• goto http://discover.tudelft.nl

• type “breakwaters and closure dams”

• click on book (Spon version)

• click on “Go to full text”

• Good links, but only useful in online version

February 1, 2012 4

Example Netbook

February 1, 2012 5

Other references

• Rock Manual (2007)

• Closure of Tidal Basins (1987)

• Coastal Engineering Manual

• Various PIANC publications

• EN13383

• Manual on the use of… (2x)

• CD-ROM will be made available

February 1, 2012 6

1. Introduction

2. Coastal Hydrodynamics

3. Coastal Sediment Processes

4. Coastal Geology

5. Coastal Project planning and design

6. Design of coastal project elements

7 Appendices (Glossary)

http://chl.erdc.usace.army.mil/cemtoc

Coastal engineering manual (shore protection manual)

February 1, 2012 7

Design of Coastal Project Elements (Hughes, updated 6/1/2006)

1 Introduction to Coastal Project Element Design

2 Types and Functions of Coastal Structures

3 Site Specific Design Conditions

4 Materials and Construction Aspects

5.1 Fundamentals of Design - Part 1

5.2 Fundamentals of Design - Part 2

5.3 Fundamentals of Design - Part 3

6 Reliability in Design

7 Design of Specific Project Elements - Case Studies

8 Monitoring, Maintenance and Repair of Coastal Projects

February 1, 2012 8

February 1, 2012 9

February 1, 2012 10

February 1, 2012 11

February 1, 2012 12

organization Master Hydraulic Engineering

February 1, 2012 13

Making a mattress

February 1, 2012 14

Bed protection

February 1, 2012 15

??

February 1, 2012 16

Completed block mat

February 1, 2012 17

Block mat factory

February 1, 2012 18

Transport of the block mat

February 1, 2012 19

Placing the block mat

February 1, 2012 20

Caspian quarry, Dubai

February 1, 2012 21

Quarry in Bulgaria

February 1, 2012 22

Larvik, Norway

February 1, 2012 23

Loading a quarry train

February 1, 2012 24

Quarry train for the Maasvlakte 1

February 1, 2012 25

Loading a stone barge (Palm I, Dubai)

February 1, 2012 26

The split barge

February 1, 2012 27

Split barge

February 1, 2012 28

Heavy stonework (Palm I, Dubai)

February 1, 2012 29

Large construction cranes

February 1, 2012 30

Placing riprap by crane

February 1, 2012 31

Placing riprap by crane

February 1, 2012 32

Using the orange peel grab

February 1, 2012 33

Side stone dumping vessel

February 1, 2012 34

side stone dumping vessel

February 1, 2012 35

ship for placing concrete cubes

February 1, 2012 36

Placing cubes by helicopter

February 1, 2012 37

Helicopter in action

February 1, 2012 38

Emergency closure in New Orleans

February 1, 2012 39

Closure with a cable car

February 1, 2012 40

Horizontal closure by tipping (Korea)

February 1, 2012 41

Closing with sand bags and sack-gabions

February 1, 2012 42

Sirevåg Berm breakwater

February 1, 2012 43

Antifer blocks at Sines (Portugal)

February 1, 2012 44

Breakwater under construction

February 1, 2012 45

Xbloc armour units in Bar Beach