SRE & Software Fault Management
Through Measurement and ModelingRick Karcich
rkarcich@cisco.com
SRE & SW Fault Management
• SRE is a Measurement of Change Activity & Test Activity Problem
• Composed of 3 phaseso Static Code Measurement
Measuring the code that implements each requiremento Measurement of Change, Build-to-Build, Sprint-to-
Sprint Developing the Change Profile
o Dynamic Test Measurement Developing the Test Profile
• Understanding how effective our tests are at hitting changed portions of code releases
SRE == Software Reliability Engineering
Measurement as the basis for SRE improvement
• A Basic Problemo Testers find too many bugs too late in a
release/sprint cycleo Bug fixing destroys the crisp, predictable
execution of a project• The Goal
o Predictably meeting release schedules with known quality/reliability
o Develop information actionable by testers
Measurement as the basis for SRE improvement…
• We don’t really want to know about the things that we can measureo Lines of Codeo Statements
• We really want to understand the things that we cannot measureo Software faultso Software development effort
Measurement as the basis for SRE improvement…
• Modern software systems change continuously• They evolve functionally• The code base evolves as a result
Software Evolution: Measuring A Moving Target
• We assume that we are developing/maintaining a single program
• In effect, we are really working with many programs over time
• They are different programs in a very real sense• We must identify and measure each version of
each program module
The Measurement Problem…
Build/Sprint NA
B
C
DE
F
G
H
IJ
K
Build/Sprint N+1A
B
L
DE
F
G
H
IJ
K
M
The Introduction Of Faults
• People make errors in the interpretation of their taskso System Analystso Systems Designerso Developers
• These errors are manifested in o Specificationso Designo Programso as faults
• Faults, when executed, result in failures
The Fault Process
Build/Sprint N Build/Sprint N+1
Latent Faults
Latent Faults
FaultsRemoved
FaultsAdded
Execution Consequences Of Faults: Failures
• Faults are found in program modules• A fault can only cause a failure if it is executed• Different functionalities execute different sets of
modules• Faults are associated with program
functionalities• A test suite generated from a representative
operational profile is a precondition for reliability analysis
Faults And Uncertainty
• Can never know when all faults have been found• May use past experience to anticipate fault count• Must create a fault surrogate
o Obtained from past development effortso Varies directly with faultso Anticipates distribution of faults in modules
• Comments• Executable Statements• Non-executable Statements• Total Operators• Unique Operators• Function Operators• Total Operands• Unique Operands Fault Index(FI)• Unique Actual Operands• Nodes• Edges• Paths• Maximum Path Length• Average Path Length • Cycles
Development of FI from Raw Metrics – Static Measurement
FI as a Fault Surrogate
• The FI metric is a statistical synthesis of program module complexity
• Program modules may be ordered by FI• The relative complexity of a software system is
the average FI of the component modules• Validation of the FI concept
o Correlates well (0.90) with measures of software faults
A Fault Index
• FI is a synthesized, dimensionless metric• FI is a fault surrogate
o Composed of metrics closely related to faultso Highly correlated with faults
Converting Data to Information
CMA
MetricAnalysis
PCA/FI
PrincipalComponents
Analysis
Modules
Program Lots of Data
12 23 54 12 203 39 238 34
7 13 64 12 215 9 39 238
11 21 54 12 241 39 238 35
5 33 44 12 205 39 138 44
42 55 54 12 113 29 234 14
FI
100
90
110
95
105
Measurement of Change, Build-to-Build(Spirnt-to-Sprint) – Code Churn and Code Delta
• Fault Index(FI) acts as a proxy for faults• FI values change from one build to the next as a
module is changed• Code deltas are differences in FI values from
build to the next• Code churn is the absolute value of Code Delta –
this is the measure of change activity
The Measurement of Change Process
Build i
Build j
Source Code
Measurement
Tools
Baseline
Baselined Build j
Baselined Build i
PCA Domain Sc
DomainScore
Change
Code Churn
Code Delta
Baselining A Software Development Project
• Software changes over software builds• Measurements, such as relative complexity,
change across builds• Initial(arbitrary) build as a baseline• Relative complexity of each build• Measure change in fault surrogate from an initial
baseline
Measurement Baseline
Point A
Point B
-5+10
Measuring Product X’s Change Activity
Measuring Product X’s Change Activity, since Alpha
Questions….?