Phase 2A In this slide show: Mechanical Room, New Elevator and Grand Stairs May 18, 2011

King Street Station 5.18.11 slide show

Embed Size (px)

Citation preview

Page 1: King Street Station 5.18.11 slide show

Phase 2AIn this slide show:

Mechanical Room, New Elevator and Grand Stairs

May 18, 2011

Page 2: King Street Station 5.18.11 slide show

Additional geothermal wells were drilled on the west side of the station to provide 100% heating and cooling for the station.

Page 3: King Street Station 5.18.11 slide show

Mechanical room with roll up door installed and geothermal mechanicals insulated.

Page 4: King Street Station 5.18.11 slide show

Geothermal well pumps in mechanical room.

Page 5: King Street Station 5.18.11 slide show

Northeast corner of Jackson Plaza is finished, including seismic upgrade.

Page 6: King Street Station 5.18.11 slide show

Area under Jackson Plaza adjacent to the west wall.

Page 7: King Street Station 5.18.11 slide show

Lighting and ventilation are installed. Most marble panels are back in place.

Page 8: King Street Station 5.18.11 slide show

Facing southwest under Jackson plaza beneath the Grand Staircase.

Page 9: King Street Station 5.18.11 slide show

A new terrazzo floor, lighting and original marble panels are installed in the future baggage area.

Page 10: King Street Station 5.18.11 slide show

A new storage room west of the elevator.

Page 11: King Street Station 5.18.11 slide show

New elevator installed connecting the terminal level to the 3rd floor.

Page 12: King Street Station 5.18.11 slide show

Elevator machine room.

Page 13: King Street Station 5.18.11 slide show

HVAC connections under the Plaza.

Page 14: King Street Station 5.18.11 slide show

Construction under way on mezzanine level for Amtrak offices, including a bathroom and break room.

Page 15: King Street Station 5.18.11 slide show

View from on the mezzanine level.

Page 16: King Street Station 5.18.11 slide show

Scaffolding erected over Grand Stairs for restoration.

Page 17: King Street Station 5.18.11 slide show

Following waterproofing, new terrazzo treads and landings the grand the stair will reopen late summer/early fall.

Page 18: King Street Station 5.18.11 slide show

New, precast terrazzo treads will be installed on the grand stairs.

Page 19: King Street Station 5.18.11 slide show

Granite bench installation made of salvaged granite from adjacent historic building foundations.

Page 20: King Street Station 5.18.11 slide show

Wood and granite bench installation is complete.

Page 21: King Street Station 5.18.11 slide show

This roof hood is the exhaust for the new elevator.