17
MONGOLIAN WIND ENERGY ASSOCIATION PROMOTING AND ADVOCATING WIND POWER IN MONGOLIA

05.02.2015, Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

Embed Size (px)

Citation preview

Page 1: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

MONGOLIAN WIND ENERGY ASSOCIATION

PROMOTING AND ADVOCATING WIND POWER IN MONGOLIA

Page 2: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

OUTLINE

1. Mongolia: Energy

2. RE resources

3. RE policies

4. About Mongolian Wind Energy Association (MWEA)

5. Wind energy projects in Mongolia

Page 3: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

1. MONGOLIA: ENERGY

Page 4: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

Energy system Installed capacity, MW

RE Total

CES 50 (Wind) 1014

EES - 36

SES - 27

WES 12 (Hydro) 12

AUES 11 (Hydro) 30

Total ~73 ~1100

1. MONGOLIA: ENERGY

Page 5: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

Energy Production

Thermal power plant 79%

Import 19%

Hydro power plant 1%

Wind power plant 1%

Diesel power plant 0%

Page 6: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

Wind: 1.1TW at 30m height

2. RE RESOURCES

Geothermal: 40 springs/spas

Hydro: 6.5GW Solar: 4.3-4.7kWh/sq.m. 300 sunny days in Gobi

Page 7: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

NATIONAL RENEWABLE ENERGY PROGRAM (2005-2020) IN 2005

IN 2007 THE RENEWABLE ENERGY LAW

IN 2014, GREEN DEVELOPMENT POLICY OF MONGOLIA

100000 SOLAR GER PROJECT (2001-2012)

3. RE POLICIES

Page 8: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

• Established in 2008

• Member to GWEC; WWEA

• Members: General Electric, Qleantech, Clean Energy, National Renewable Energy Center, Aydiner, Sainshand Wind Park, etc.

4. MONGOLIAN WIND ENERGY ASSOCIATION

Page 9: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

MISSION

• Mission: “Develop wind energy industry and train professional industry personnel”

• Objectives:

1. Tax exemptions from land lease and customs duty for wind energy projects

2. Increase public awareness and distribute information

Page 10: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

ACTIVITIES • WEBSITE: www.monwea.org • Annual wind energy report for Mongolia: 2008-2009; 2010-2011,

2012-2013 • Training wind energy professionals in both local and international

training sessions • Monthly columns for Business Time magazine • Promotional television program on wind energy with Mongolian

National Broadcasting Channel • Wind Energy Day since 2010 • Wind assessment report for GWEC; WWEA • Participation in various international and local wind conferences

(China Wind Power, US Wind Power, World Wind Energy Conference, National Forum for Renewable Energy in Mongolia)

• Mongolian Partner for Quantum Leap in Wind promoted and implemented by Asian Development Bank (ADB).

• Wind Energy Asia 2014 conference • National Renewable Energy Forum 2015

Page 11: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

4. WIND ENERGY PROJECTS IN MONGOLIA

Page 12: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

Clean Energy:

SALKHIT

(operational)

49.6 MW

Aydiner

50 MW

AB Solar Wind

100 MW

Sainshand

Windpark

52 MW

Qleantech

250 MW

Clean Energy Asia

50 MW

Page 13: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

1. SALKHIT WIND FARM- CLEAN ENERGY LLC

• Operational since June 2013;

• Transmitted 53M kWh to Central Grid as of the end of 2013

• Capacity: 49.6MW

• Investment: USD120M

• Tariff: 0.095USD/kWh

Page 14: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

2. OYUTOLGOI WINDFARM- QLEANTECH

• Capacity: 250 MW (102MW in 2015; 148MW in 2017-2018)

First stage: 102MW • Investment: USD180M • Projected electricity inflow to the grid: 370M

kWh • Tariff: 0.095USD/kWh • Investor: Swedish and Chinese investors • Construction initiation: 2015 • Operational: January, 2016

Page 15: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

3. SAINSHAND WINDPARK

• Capacity: 52MW

• Investment: USD120M

• Projected electricity inflow to the grid: 170M kWh

• Tariff: 0.095USD/kWh

• Investor: Ferrostaal (Germany)

• Construction initiation: 2015

• Operational: January, 2016

Page 16: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

CHOIR WIND FARM- AYDINER GLOBAL

• Capacity: 50MW

• Investment: USD95M

• Projected electricity inflow to the grid: 137M kWh

• Tariff: 0.095USD/kWh

• Investor: Aydiner (Turkey)

• Construction initiation: 2016

• Operational: 2016

Page 17: 05.02.2015,  Promoting and Advocating Wind Energy in Mongolia, Mr. Achitsan B

CLEAN ENERGY ASIA

• Capacity: 50MW

• Location: Tsogttsetsii; Umnugobi

• Special license issued: September, 2014

• Project progress: under PPA negotiations

• Investor: Newcom and Softbank

• Construction initiation: 2016

• Operational: January, 2017