View
256
Download
7
Embed Size (px)
Citation preview
MONGOLIAN WIND ENERGY ASSOCIATION
PROMOTING AND ADVOCATING WIND POWER IN MONGOLIA
OUTLINE
1. Mongolia: Energy
2. RE resources
3. RE policies
4. About Mongolian Wind Energy Association (MWEA)
5. Wind energy projects in Mongolia
1. MONGOLIA: ENERGY
Energy system Installed capacity, MW
RE Total
CES 50 (Wind) 1014
EES - 36
SES - 27
WES 12 (Hydro) 12
AUES 11 (Hydro) 30
Total ~73 ~1100
1. MONGOLIA: ENERGY
Energy Production
Thermal power plant 79%
Import 19%
Hydro power plant 1%
Wind power plant 1%
Diesel power plant 0%
Wind: 1.1TW at 30m height
2. RE RESOURCES
Geothermal: 40 springs/spas
Hydro: 6.5GW Solar: 4.3-4.7kWh/sq.m. 300 sunny days in Gobi
NATIONAL RENEWABLE ENERGY PROGRAM (2005-2020) IN 2005
IN 2007 THE RENEWABLE ENERGY LAW
IN 2014, GREEN DEVELOPMENT POLICY OF MONGOLIA
100000 SOLAR GER PROJECT (2001-2012)
3. RE POLICIES
• Established in 2008
• Member to GWEC; WWEA
• Members: General Electric, Qleantech, Clean Energy, National Renewable Energy Center, Aydiner, Sainshand Wind Park, etc.
4. MONGOLIAN WIND ENERGY ASSOCIATION
MISSION
• Mission: “Develop wind energy industry and train professional industry personnel”
• Objectives:
1. Tax exemptions from land lease and customs duty for wind energy projects
2. Increase public awareness and distribute information
ACTIVITIES • WEBSITE: www.monwea.org • Annual wind energy report for Mongolia: 2008-2009; 2010-2011,
2012-2013 • Training wind energy professionals in both local and international
training sessions • Monthly columns for Business Time magazine • Promotional television program on wind energy with Mongolian
National Broadcasting Channel • Wind Energy Day since 2010 • Wind assessment report for GWEC; WWEA • Participation in various international and local wind conferences
(China Wind Power, US Wind Power, World Wind Energy Conference, National Forum for Renewable Energy in Mongolia)
• Mongolian Partner for Quantum Leap in Wind promoted and implemented by Asian Development Bank (ADB).
• Wind Energy Asia 2014 conference • National Renewable Energy Forum 2015
4. WIND ENERGY PROJECTS IN MONGOLIA
Clean Energy:
SALKHIT
(operational)
49.6 MW
Aydiner
50 MW
AB Solar Wind
100 MW
Sainshand
Windpark
52 MW
Qleantech
250 MW
Clean Energy Asia
50 MW
1. SALKHIT WIND FARM- CLEAN ENERGY LLC
• Operational since June 2013;
• Transmitted 53M kWh to Central Grid as of the end of 2013
• Capacity: 49.6MW
• Investment: USD120M
• Tariff: 0.095USD/kWh
2. OYUTOLGOI WINDFARM- QLEANTECH
• Capacity: 250 MW (102MW in 2015; 148MW in 2017-2018)
First stage: 102MW • Investment: USD180M • Projected electricity inflow to the grid: 370M
kWh • Tariff: 0.095USD/kWh • Investor: Swedish and Chinese investors • Construction initiation: 2015 • Operational: January, 2016
3. SAINSHAND WINDPARK
• Capacity: 52MW
• Investment: USD120M
• Projected electricity inflow to the grid: 170M kWh
• Tariff: 0.095USD/kWh
• Investor: Ferrostaal (Germany)
• Construction initiation: 2015
• Operational: January, 2016
CHOIR WIND FARM- AYDINER GLOBAL
• Capacity: 50MW
• Investment: USD95M
• Projected electricity inflow to the grid: 137M kWh
• Tariff: 0.095USD/kWh
• Investor: Aydiner (Turkey)
• Construction initiation: 2016
• Operational: 2016
CLEAN ENERGY ASIA
• Capacity: 50MW
• Location: Tsogttsetsii; Umnugobi
• Special license issued: September, 2014
• Project progress: under PPA negotiations
• Investor: Newcom and Softbank
• Construction initiation: 2016
• Operational: January, 2017