43
The True Value of Rail Andrew Lezala, CEO Metro Trains Melbourne New Zealand Rail Conference June 2016

Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Embed Size (px)

Citation preview

Page 1: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

The True Value of Rail

Andrew Lezala, CEO Metro Trains Melbourne

New Zealand Rail Conference

June 2016

Page 2: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Melbourne Rail Network

“A railway is 10% iron”

• ‘Spider Network’ with central body, long legs

• 15 lines

• 218 railway stations

• 210 six-carriage trains

• 4,700+ employees

• 2,300+ weekday services

• 14,000+ weekly services

• 800,000+ daily journeys

• 800+ kms of track

• 227 million trips p.a.

Page 3: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

The Spine Of Melbourne

▪ Melbourne is the fastest growing capital city in Australia

▪ Every week 1800 new residents come to live in our city

▪ South Morang is the fastest growing suburb in Australia

▪ 7 out 10 fastest growing regions are in Greater Melbourne

▪ Rail patronage has soared over the last decade

▪ The railway will do the heavy lifting into the future

Page 4: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Melbourne train patronage

Metropolitan Train PatronageMelbourne Train Patronage (millions trips/year)

230 million

trips per year

150 million

trips per year

Page 5: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Population growth in Melbourne

“A railway is 10% iron”

Page 6: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Melbourne train patronage - comparison

Metro Trains Melbourne | Oct 2015

Number of lines 15 16 10 11

Number of stations 218 300 85 270

Route length 392km 428km 175km 402km

Population 4.0 mil 11.8 mil 7.0 mil 7.5 mil

Daily ridership 0.4 mil 4.5 mil 3.9 mil 3.0 mil

Overall Ridership 10% 38% 56% 40%

% of city population

Melbourne Paris Hong Kong London

Page 7: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Rail Value…

Page 8: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Ecology – road carbon emissions million t

Road emissions 1990-2020Bureau of Infrastructure, Transport and Regional Economics

Page 9: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Ecology – transport emissions by mode

Rail vs other transport modesEconomics

Page 10: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Ecology

In one year, the average passenger train reduces carbon

emissions by a factor equivalent to planting 320 hectares of trees

In one year, the average freight train travelling between Melbourne and

Brisbane reduces carbon emissions by a factor equivalent to planting 600

hectares of trees (or a household of 3 people giving up electricity for 46 years)

* Deloitte Access Economics

Page 11: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Safety

▪ On average, every year there are 1500 road fatalities and

over 30,000 road injuries costing Australia $35 billion annually

▪ By comparison rail accrues 37 fatalities and 130 injuries

* Deloitte Access Economics

▪ One passenger train reduces accident costs by an amount that

could fund 505 hospital beds per day or 6 doctors for one year

Page 12: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Congestion

▪ Traffic congestion costs Australians $15 billion every year

▪ The average passenger train takes 525 cars off the road,

that’s equivalent to 3.2 million vehicle kilometres a year

▪ The average freight train takes 110 trucks off the road,

that’s equivalent to 49.7 million truck kilometres a year

* Deloitte Access Economics

Page 13: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Total domestic freight task by transport mode, billion tonne-kms

Congestion

Page 14: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Total passenger travel by transport mode, billion passenger-kms

Congestion

Page 15: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Estimated congestion cost in American cities

Congestion

Page 16: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Reducing social exclusion

Poor transport contributes to social exclusion in two ways:

1. Poor transport restricts access to activities that enhance people’s life

chances such as work, learning, health care, food shopping and more

2. Deprived communities suffer disproportionately from pedestrian deaths,

pollution and the isolation which can result from living near busy roads

* London Social Exclusion Unit

** Australian Bureau of Statistics

ABS figures suggest that 2.6 million Australians live under the poverty line,

meaning that 11.8% of residents are in need of low cost transport options

Page 17: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Social exclusion in Melbourne

Melbourne suburbs by growth

Page 18: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Facilitating growth and prosperity

▪ The CBDs of Sydney and Melbourne – just

7.1 square kilometres – generate $118 billion

(triple the contribution of the agriculture sector)

* Grattan Institute

** Australian National Accounts

Infrastructure is of critical importance to the

productivity of businesses – governments must

look for new ways to meet our infrastructure

needs over the long term – there is no shortage

of private sector financing available for projects.

John Fraser | Secretary to the Treasury

Page 19: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Facilitating growth and prosperity

64.7%

Page 20: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Sustainable industry – jobs and $$$

▪ The High Capacity Metro Trains (HCMT) Project is the largest single

investment in new rolling stock in Victorian history at 65 new trains

leading to 120 by 2025 (with 50% local content)

▪ Sydney and Melbourne alone will invest $55 billion in rail assets in

the next 10 years

▪ Inland Rail Project -1700km of new freight line, enabling goods

to be delivered Melbourne-Brisbane in less than 24 hours

Tens of thousands of jobs

Page 21: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Making it happen…

Page 22: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Planning and mobility demand

▪ There is a vital need for carefully developed urban blueprints

such as those developed for Shanghai and other major cities

▪ A national transport plan would provide cohesion and direction

▪ We must plan and build smart cities not dumb cities… why build

in Point Cook and Cranbourne without public transport infrastructure?

▪ Change to high rise close to CBD - or mobility demand becomes exponential

Page 23: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Funding… get joined-up plans

▪ Federal and State government alignment supporting the plans

▪ Private sector finance for appropriate elements

▪ Value capture – plan it in from the start

▪ Alternative sources of funds e.g. benefit tax, congestion charging etc

▪ ARA should play a key role in influencing outcomes in this space

Page 24: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Customer centric approach

A customer centric approach will help to drive rail patronage in the future:

Clean

Accessible

Reliable

Safe

Capacity

Page 25: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

High capacity trains

“A railway is 10% iron”

Page 26: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

High capacity signalling

Page 27: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Bus feeders into stations

Page 28: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Creating a smart metro

Page 29: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Build… build…build

Page 30: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Project delivery

There are major rail electrification projects underway in key cities:

Melbourne

Auckland

Wellington

Sydney

Page 31: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Sydney Metro Northwest

Page 32: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Sydney Metro Northwest

Page 33: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

50 Level Crossing Removals

$5-6 billion 50 level crossings to be removed

over 2 full terms of government

A huge program of works with

estimated investment to be

approximately $5-6 billion

Page 34: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Cranbourne-Pakenham Rail Upgrade Project

$2.5 billion The Cranbourne-Pakenham Line

upgrade will deliver more services:

▪ 37 high-capacity trains

▪ 9 level crossing removals

▪ 4 stations to be rebuilt

▪ Power and signalling upgrades

▪ New train depot at Pakenham

▪ Line capacity boosted by 42%

▪ Extra 11,000 customers in AM peak

Page 35: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Melbourne Metro Rail Project

$11 billion The Melbourne Metro Rail Project

will double the size of the city loop:

▪ 2 x 9km rail tunnels running from

South Kensington to South Yarra

▪ New underground stations at Arden,

Parkville, CBD Nth, CBD Sth, Domain

▪ Train/tram interchanges to be built

at Parkville and Domain

Page 36: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Line Extension to Mernda

$600 million The South Morang line will be extended

to Mernda, catering for the significant

population growth in Melbourne’s north

Page 37: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Affordability . . .

Page 38: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Affordability

▪ Strive to reduce overheads and public transport subsidies

▪ Sensible pay deals – currently construction costs are prohibitive for many much-needed projects

▪ Better engineering standards, design and processes – lower cost by design

▪ Affordable high speed – ART

Page 39: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Air Rail Transit (ART)

▪ Ultra light construction

▪ Utilising existing road / rail corridors

▪ 360 km/h moving 9,600 customers/hour

▪ Cabin design based on the layout of a regional aircraft

Page 40: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Air Rail Transit (ART)

▪ TGV France & Spain $40 million/km (€ 5.97 million/km)

▪ Shinkansen $50 million/km (¥4.27 billion/km)

▪ Channel Tunnel Rail Link $358 million/km (£ 92.08 million/km)

Page 41: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Air Rail Transit (ART)zzzz

▪ Melbourne to Geelong = 16 mins

▪ Tullamarine to Avalon = 13 mins

▪ Melbourne to Sydney = 2 hrs 29 mins

Page 42: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

True value of rail

▪ Ecology - a better world legacy

▪ Reduced transport related death and injury - $35 bn pa

▪ Reduced congestion - $15 bn pa

▪ Reduced social exclusion

▪ More growth and prosperity

▪ More jobs and $$$

▪ Planning and blueprints

▪ Aligned and multi-faceted funding models

▪ Integrated mobility

▪ Customer centric approach

▪ Affordability

Page 43: Andrew Lezala - Metro Trains Melbourne - The True Value of Rail

Thank You