Solar PV Status and Market Outlook RENEWABLE ENERGY IN ARGENTINA
SolarPlaza Webminar, December 1, 2016
Mauro G. Soares National Director for Renewable Energy
TODAY´S CHAT POINTS
• WHO WE ARE AND WHAT WE DO • WHERE WE ARE HEADING TO • OUR REGULATORY AND CONTRACTUAL FRAMEWORK • WHAT WE HAVE DONE THIS YEAR • WHAT´S IN STORE FROM NOW ON
UNDERSECRETARIAT OF RENEWABLE ENERGY
• Designs and implements regulation that enables the achievement of the country´s renewable energy legal mandates
• Reviews, assesses and follows up on renewable energy investment projects at a national level
• Conducts National and International Cooperation actions in the area of renewable energy development
• Conducts technical, economic and regulatory analysis for the sub-sector
NATIONAL OFFICE OF RENEWABLE ENERGY NATIONAL OFFICE OF RENEWABLE ENERGY PROMOTION
• Promotes the use and integration of different renewable energy sources to the national energy mix.
• Sets guidelines and manages promotion, scientific and technological research programs, as well as technical studies and resources inventory efforts.
• Designs and implements regulation for the distributed renewable energy market.
WHO WE ARE AND WHAT WE DO Ministry of Energy and Mining
Secretariat of Electric Power
% o
f the
tota
l pow
er d
eman
d
WHERE WE ARE HEADING TO RENEWABLE ENERGY NATIONAL TARGETS 2018-2025
Existing 0.8 GW 1.8%
3 GW 10 GW
RenovAr Round 1.0 1.1 GW 2.7% RenovAr Round 1.5 1.2 GW 3.0% Legacy Contracts (R202) 0.5 GW 1.5%
Existing +
Actions 2016
9 %
Note: Percentage of RE in total demand calculated using P75 generation estimates and 2018 projected demand.
WHERE WE ARE HEADING TO
Renewables
Transmission
Hydroelectricity
Nuclear
Thermoelectricity
15.0
5.0
10.2
6.0
4.8
2017-2015 Planned Capital Investment in the Power Sector (in billion USD)
+10 GW
+3 GW
+6 GW
+1 GW
>5k km
Demand 2015 135 TWh Demand 2025 170 TWh
15 Bill USD
RENEWABLE ENERGY IN ARGENTINA
NATIONAL LEGAL FRAMEWORK FOR RENEWABLE ELECTRICITY (Law N° 27191)
Mandatory Targets 8% @ 2017-18 16% @ 2021 20% @ 2025
Resource Diversification Geographical and Technological
Generous Fiscal Incentives Applicable to IPPs and Local Manufacturers
FODER Public Trust Fund for Guarantees and Financing
New Utility-Scale RE Framework Law 27191
THE NEW REGULATORY FRAMEWORK
Law 27.191 Senate 4Q’14 (94% positive vote) Lower Chamber 4Q’15 (93% positive vote)
Decrees 531 y 882 Presidential Decree 1S ’16
Res. 71, 72, 123, 1/E, 136, 252 Resolutions of the Ministry of Energy and Mining 1S’ & 2S’16
RenovAr Rounds 1 & 1.5 CAMMESA 2S’16
RENEWABLE ENERGY PROGRAM 2016-2025 Regulatory Framework Elements
Incentives implementation rules and Call for Tenders RfP
National Law
High-level Regulation
Call for Tenders implementation
100% of RE Mandate
PPAs Tenders (instructed by MINEM)
Private PPAs for Large Users
Self Generation
100% of the 300 kW-or-less demand and Large Users who do not opt-out. Price determined through Tenders
Large Users (>300 kW) who exercise their right to opt-out and purchase directly from IPPs and/or traders, or self-generate their mandated quota. Annual Goals subject to penalties. Price and other T&Cs freely negotiated.
Opt
-Out
O
pt-O
ut
RENEWABLE ENERGY MARKETS 3 Contracting Mechanisms
GUARANTEE
CONTRACTS
RenovAr CONTRACTUAL FRAMEWORK 2 Contracts 3 Levels of Guarantees
Energy Payment
FODER Guarantee 1 Sovereign
Guarantee
Termination Payment 1
2 World Bank Guarantee
Termination Payment 2
3
Power Purchase Agreement 1 FODER
Trust Adhesion Agreement 2 Energy Sales Energy Payment and Early Termination Guarantees
(*) To replenish FODER so that it always holds 12 months worth of eligible PPA payments as liquid reserve (#) CAMMESA coordinates efforts with FODER on a monthly basis in order to ensure that all payments are covered in full on due date
Payments
Physical Flow
Guarantees
PPA
CAMMESA (Off-taker)
2. CAMMESA bills End Consumers on a monthly basis to through DistCos or directly to major users Electricity
End Consumers
1. IPP Injects Renewable Electricity into National Grid
IPP (Seller)
8. Ministry of Energy & Mining increases Guarantee Charge (*)
7. FODER seeks repayment from CAMMESA after having made a Energy Guarantee Payment on its behalf
Renewable Energy Trust Fund
(FODER) 6. FODER pays IPP under Energy Payment Guarantee
5. IPP Issues a claim to FODER for late or non-payment of Energy under PPA
4. CAMMESA pays IPP on a monthly basis under PPA (#)
3. Consumers pay on a monthly basis through DistCos or directly in case of major users
Energy Payment Guarantee 1
LIQUIDITY GUARANTEE
IPP (Seller) CAMMESA (Offtaker)
Renewable Energy Trust Fund (FODER)
(Trustee: BICE)
4. Cause for Sale of Project occurs. IPP submits the claim for payment of the
Project Sale Price to the FODER
1. Cause for early termination occurs
2. IPP notifies CAMMESA
8. IPP submits the claim to the WB (*)
9. The WB pays the eligible amount to the IPP (*)
11. National State pays to the WB the amount due under the Indemnity Agreement
MINEM / MINHYF Representatives of the National State
5. The FODER submits a claim for needed budget to the Ministry of Energy and Mining / Ministry of Finance and
Treasury in exchange of the treasury bills, kept in guarantee.
10. IPP claims for the balance to the FODER Trustor
(*) The FODER grants individuals and legal entities which have issued projects the irrevocable right to directly submit claims before the World Bank in certain cases and to receive payments from the World Bank.
Termination Payment Guarantee via Treasury Bills 2 The World Bank 3
SOLVENCY GUARENTEE (TERMINATION)
7. The FODER does not pay to the IPP the Project Sales Price or pays partially
6. MINEM / MINHyF does not have the funds in full or at all
3. PPA is terminated, IPP is free to sell to thrid party or spot market
RENEWABLE ENERGY IN ARGENTINA
RenovAr Results
# PROJECTS : 58 MW: 2,811
# PROJECTS : 11 MW: 53
# PROJECTS : 5 MW: 11
# PROJECTS: 49 MW: 3,468
ROUND 1 - BIDS RECIEVED (SEPTEMBER 5, 2016)
Number of bids received: 123
SOLAR PV
WIND
BIO
SMALL HYDRO
Provinces that participate: Buenos Aires, Chubut, Río Negro, Santa Cruz, Neuquén, La Rioja, La Pampa, Mendoza, Córdoba and Santa Fé
Provinces that participate: Salta, San Juan, Jujuy, Catamarca, San Luis, La Rioja, Mendoza, Neuquén, La Pampa, Córdoba, Buenos Aires and Chaco
Provinces that participate: Entre Ríos, Corrientes, Córdoba, Tucumán, Santa Fé, Misiones and San Luis
Provinces that participate: Río Negro and Mendoza
ROUND 1 - BIDS RECIEVED (SEPTEMBER 5, 2016)
PROVINCE #
PROJECTS
CAPACITY (MW)
NET P50 CAPACITY
FACTOR (%)
AVERAGE LOCAL
CONTENT (%)
SALTA 9 829 34% 8%
SAN JUAN 14 558 29% 13%
JUJUY 4 400 25% 17%
LA RIOJA 7 318 29% 8%
CATAMARCA 9 315 30% 12%
SAN LUIS 4 197 27% 18%
MENDOZA 8 124 27% 67%
BUENOS AIRES 1 30 19% 68%
CORDOBA 1 30 24% 0%
CHACO 1 10 25% 40%
TOTAL 58 2811 29% 21%
ROUND 1 - AWARDED PROJECTS (OCTOBER 14, 2016)
TECHNOLOGY
NUMBER OF
PROJECTS
AWARDED POWER
CAPACITY (MW)
ANNUAL ENERGY
PRODUCTION (GWh/YEAR)
PROVINCES
Wind 12 707 2,882 Buenos Aires, Chubut, Río Negro, Santa Cruz, Neuquén, La Rioja
Solar PV 4 400 918 Salta y Jujuy
Biogas 6 9 70 Santa Fe, San Luis y Córdoba
Biomass 2 15 122 Corrientes y Misiones
Smal Hydro 5 11 68 Río Negro y Mendoza
Total 29 1,142 4,060 14 Provinces
ROUND 1 - SOLAR PV PROJECTS AWARDED
59.0 60.0 60.0 60.0
0
10
20
30
40
50
60
70
80
P.S. La Puna (100) P.S. Cauchari 1 (100) P.S. Cauchari 2 (100) P.S. Cauchari 3 (100)
Awar
ded
Pric
e (U
S$/M
Wh)
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
ROUND 1.5 - BIDS RECIEVED (NOVEMBER 11, 2016) WIND
PATAGONIA 100 MW
COMAHUE 100 MW
REST OF THE COUNTRY 100 MW
BUENOS AIRES 100 MW
QUOTA
REGION NUMBER OF PROJECTS CAPACITY (MW)
Buenos Aires 8 680
Comahue 3 187
Rest of Country 3 193
Patagonia 5 497
TOTAL 19 1,557
Maximum Price 59.39 USD/MWh
ROUND 1.5 - BIDS RECIEVED (NOVEMBER 11, 2016) SOLAR PV
RESTO OF THE COUNTRY 100 MW
NOA 100 MW
QUOTA
REGION NUMBER OF PROJECTS
CAPACITY (MW)
NOA 9 394
Rest of Country 19 531
TOTAL 28 (*) 925
Maximum Price 59.75 USD/MWh
(*) Bids SFV-03 and SFV-25 were discarded due to formal issues in their respective envelope B.
ROUND 1.5 - AWARDED PROJECTS (NOVEMBER 25, 2016)
TECHNOLOGY NUMBER OF
PROJECTS
AWARDED POWER
CAPACITY (MW)
AVERAGE AWARDED
PRICE (US$/MWh)
ANNUAL ENERGY
PRODUCTION (GWh/YEAR)
WIND
10 765.4 53.34 3,037
SOLAR PV 20 516.2 54.94 1,274
Total 30 1,281.5 53.98 4,311
ROUND 1.5 - SOLAR PROJECTS AWARDED
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
NOA REGION
51,9 53.4 53.7 56.3 56.4
0
10
20
30
40
50
60
P.S. SAUJIL (23) P.S. TINOGASTA (15) P.S. FIAMBALÁ (11) P.S. CAFAYATE (80) P.S. NONOGASTA (35)
Awar
ded
Pric
e (U
S$/M
Wh)
48.0 52.0 53.0 53.7 54.1 55.0 55.0 55.0 55.0 55.2 56.5 56.7 57.6 58.9 59.2
0102030405060
P.S.ANCHORIS
(21)
P.S. PASIP(1)
P.S.SARMIENTO
(35)
P.S. ULLUMN1 (25)
P.S. IGLESIA- GUAÑIZULI
(80)
P.S. LAVALLE(18)
P.S. LUJANDE CUYO
(22)
P.S. LA PAZ(14)
P.S.GENERAL
ALVEAR (18)
P.S. ULLUMN2 (25)
P.S. ULLUM4 (14)
P.S. LACUMBRE
(22)
P.S.ULLUM3
(32)
P.S.CALDENESDEL OESTE
(25)
P.S. LASLOMITAS (2)
ROUND 1.5 - SOLAR PROJECTS AWARDED
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
REST OF COUNTRY REGION
Colw
ay 0
8 In
dust
rial S
.L. /
IL
DEFO
NSO
GU
ILLE
RMO
CLA
VIJO
/
FERN
ANDO
ÁN
GEL
MAR
ESCA
Awar
ded
Pric
e (U
S$/M
Wh)
QU
AATR
O P
ARTI
CIPA
COES
S.A
.
SOLAR PV @ ROUND 1 + 1.5 24 SOLAR PV PROJECTS
AWARDED
Wind Awarded
Wind Not Awarded
Solar PV Awarded
Solar PV Not Awarded
Biomass Awarded
Biomass Not Awarded
Biogas Awarded
Biogas Not Awarded
Small Hydro Awarded
Small Hydro Not Awarded
PROVINCE # PROJECTS
ROUND 1
ROUND 1.5
TOTAL
JUJUY 3 300 300
SAN JUAN 7 212 212
SALTA 2 100 80 180
MENDOZA 6 94 94
CATAMARCA 3 49 49
SAN LUIS 2 47 47
LA RIOJA 1 35 35
TOTAL 24 400 516 916
SIGNITICANT PRICE IMPROVEMENT ROUND 1 vs. ROUND 1.5
ROUND 1.5 AWARDED CAPACITY 516 MW CUT-OFF PRICE 59.20 US$/MWh
ROUND 1 AWARDED CAPACITY 400 MW CUT-OFF PRICE 60.00 US$/MWh
SIGNITICANT PRICE IMPROVEMENT ROUND 1 vs. ROUND 1.5
Max -52%
Min -16% Average
-30%
RENEWABLE ENERGY IN ARGENTINA
What´s Next
WORK IN PROGRESS
ACTION ITEM COMPLETED BY (ESTIMATE)
RenovAr PPA and FODER Adhession Agreements signed Round 1 by Jan. 5, 2017
Round 1.5 by mid 2017
Pending regulation on local content certification and duty-free imports for
local manufacturers
YE 2016
Corporate PPA and Self-generation Detailed Regulation 1Q 2017
Distributed Renewable Energy Regulation (national law) 1Q to 2Q 2017
RenovAr Round 2 launched 2Q 2017?
Technology specific tenders for Geothermal, Biogas, Biomass, Small Hydro 3Q 2017?
RENEWABLE ENERGY IN ARGENTINA
RenovAr – List of Awarded Projects
ROUND 1 - LIST OF AWARDED PROJECTS
TECHNOLOGY ID PROVINCE TOWN PROJECT NAME BIDDING CONSORTIUM MW AWARDED PRICE (USD/MWh)
WIND
EOL-14 BUENOS AIRES Bahía Blanca P.E. García del Río ENVISION / SOWITEC 10 49.81
EOL-17 BUENOS AIRES Buratovich P.E. Vientos del Secano ENVISION 50 49.08
EOL-06 BUENOS AIRES Villalonga P.E. Villalonga GENNEIA 50 54.96
EOL-16 NEUQUEN Confluencia P.E. Los Meandros ENVISION 75 53.88
EOL-15 RIO NEGRO Pilcaniyeu P.E. Cerro Alto ENVISION 50 56.98
EOL-44 BUENOS AIRES Bahía Blanca P.E. Corti C. T. LOMA DE LA LATA 100 58.00
EOL-22 CHUBUT Garayalde P.E. Garayalde PAE / 3 GAL 24 59.00
EOL-35 BUENOS AIRES Villarino P.E. La Castellana CP RENOVABLES 99 61.50
EOL-33 CHUBUT Pampa del Castillo P.E. Kosten ENAT / SEG / OTAMENDI / NUEVO CERRO DRAGÓN 24 59.41
EOL-05 SANTA CRUZ Las Heras P.E. Vientos Los Hércules EREN 97 62.88
EOL-08 CHUBUT Puerto Madryn P.E. Chubut Norte GENNEIA 28 66.00
EOL-46 LA RIOJA Arauco P.E. Arauco II (Etapa 1 y 2) ARAUCO S.A.P.E.M. 100 67.19
Project requested World Bank Partial Guarantee.
49.1 49.8 53.9 55.0 57.0 58.0 59.0 59.4 61.5 62.9
66.0 67.2
0
10
20
30
40
50
60
70
80
Vientos delSecano (50)
García delRió (10)
LosMeandros
(75)
Villalonga(50)
Cerro Alto(50)
Corti (100) Garayalde(24.15)
Kosten (24) La Castellana(99)
Vientos LosHércules
(97.2)
ChubutNorte (28.35)
Arauco II(Etapa 1 y 2)
(99.75)
ENAT
/ S
EG /
OTA
MEN
DI /
NU
EVO
CER
RO D
RAG
ÓN
WIND PROJECTS AWARDED Aw
arde
d Pr
ice
(US$
/MW
h)
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
ROUND 1 - LIST OF AWARDED PROJECTS
TECHNOLOGY ID PROVINCE TOWN PROJECT NAME BIDDING CONSORTIUM MW AWARDED PRICE (USD/MWh)
SOLAR PV
SFV-38 JUJUY Cauchari P.S. Cauchari 1 JEMSE 100 60.00
SFV-39 JUJUY Cauchari P.S. Cauchari 2 JEMSE 100 60.00
SFV-40 JUJUY Cauchari P.S. Cauchari 3 JEMSE 100 60.00
SFV-13 SALTA San Antonio de los Cobres P.S. La Puna FIELDFARE/ ISOLUX 100 58.98
SMALL HYDRO
PAH-01 MENDOZA Lujan de Cuyo P.A.H. Canal Cacique Guaymallén - Salto 8
EMESA / CONST. ELECT. DEL OESTE 1.20 105.00
PAH-02 MENDOZA Lujan de Cuyo P.A.H. Canal Cacique Guaymallén - Salto 6
EMESA / CONST. ELECT. DEL OESTE 1.01 105.00
PAH-03 MENDOZA Lujan de Cuyo P.A.H. Dique Tiburcio Benegas
EMESA / CONST. ELECT. DEL OESTE 1.65 105.00
PAH-04 MENDOZA Junín P.A.H. Triple Salto Unificado EMESA / CONST. ELECT. DEL OESTE 0.51 105.00
PAH-05 RIO NEGRO El Foyel P.A.H. Rio Escondido PATAGONIA ENERGIA 7.00 105.00
Project requested World Bank Partial Guarantee.
ROUND 1 - LIST OF AWARDED PROJECTS
TECHNOLOGY ID PROVINCE TOWN PROJECT NAME BIDDING CONSORTIUM MW AWARDED PRICE (USD/MWh)
BIOGAS
BG-01 BIOMAS CROP Rio Cuarto C.T. Río Cuarto 1 BIOMAS CROP 2 160.00
BG-02 BIOMAS CROP Juan LLerena C.T. Río Cuarto 2 BIOMAS CROP 1.2 160.00
BG-03 ACA / FERSI Christophersen C.T. Yanquetruz ACA / FERSI 1.2 160.00
BG-04 ADECO AGRO Huinca Renancó C.T. San Pedro Verde ADECO AGRO 1.42 158.92
BG-05 FECOFE / COOP. HUINCA RANANCÓ
Rio Cuarto C.T. Huinca Renancó FECOFE / COOP. HUINCA RANANCÓ 1.62 160.00
BG-06 SANTA FE Ricardone C.T. Biogás Ricardone MARTÍN NACARATO / OTROS 1.2 118.00
BIOMASS
BM-01 CORRIENTES Santa Rosa C.T. Generación Biomasa Santa Rosa
PAPELERA MEDITERRÁNEA / LUCENA 12.5 110.00
BM-05 MISIONES Puerto Esperanza C.T. Pincó Eco PINDÓ 2 110.00
Project requested World Bank Partial Guarantee.
ROUND 1: SOLAR PV PROJECTS AWARDED
59.0 60.0 60.0 60.0
0
10
20
30
40
50
60
70
80
P.S. La Puna (100) P.S. Cauchari 1 (100) P.S. Cauchari 2 (100) P.S. Cauchari 3 (100)
Awar
ded
Pric
e (U
S$/M
Wh)
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
BIO AND SMALL HYDRO PROJECTS AWARDED
0
20
40
60
80
100
120
140
160
P.A.H. CanalCacique
Guaymallén -Salto 8 (1.2)
P.A.H. CanalCacique
Guaymallén -Salto 6 (1.01)
P.A.H. DiqueTiburcio
Benegas (1.65)
P.A.H. TripleSalto
Unificado(0.51)
P.A.H. RioEscondido (7)
C.T.Generación
Biomasa SantaRosa (12.5)
C.T. Pincó Eco(2)
C.T. RíoCuarto 1 (2)
C.T. RíoCuarto 2 (1.2)
C.T.Yanquetruz
(1.2)
C.T. San PedroVerde (1.42)
C.T. HuincaRenancó
(1.62)
C.T. BiogásRicardone *
(1.2)
Awar
ded
Pric
e (U
S$/M
Wh)
SMALL HYDRO BIOMASS BIOGAS
MAR
TÍN
ALF
REDO
NAC
ARAT
O
PATA
GO
NIA
EN
ERG
ÍA S
.A.
FAM
ILIA
LU
CEN
A
BIO
MAS
S CR
OP
S.A.
BIO
MAS
S CR
OP
S.A.
FERS
I S.A
.
COO
P. L
IMIT
ADA
DE E
LECT
RICI
DAD
Y SE
RVIC
IOS
ANEX
O D
E HU
INCA
REN
ANCÓ
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
TECHNOLOGY REGION ID PROVINCE PROJECT NAME BIDDING CONSORTIUM MW AWARDED PRICE (USD/MWh)
SOLAR PV
NOA
SFV-21 CATAMARCA P.S. Saujil ENERGIAS SUSTENTABLES 23 51.9
SFV-20 CATAMARCA P.S. Tinogasta IVANISSEVICH / DEYKOLL 15 53.4
SFV-18 CATAMARCA P.S. Fiambalá EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 11 53.7
SFV-12 SALTA P.S. Cafayate FIELDFARE / ISOLUX INGENIERÍA 80 56.3
SFV-15 LA RIOJA P.S. Nonogasta ENERGIAS SUSTENTABLES / FIDES GROUP 35 56.4
REST OF SOLAR
SFV-34 MENDOZA P.S. Anchoris EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 21 48.0
SFV-06 MENDOZA P.S. General Alvear EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 18 55.0
SFV-04 MENDOZA P.S. La Paz EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 14 55.0
SFV-01 MENDOZA P.S. Lavalle EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 18 55.0
SFV-02 MENDOZA P.S. Lujan de Cuyo EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 22 55.0
SFV-05 MENDOZA P.S. PASIP EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 1 52.0
ROUND 1.5 - LIST OF AWARDED PROJECTS
Project requested World Bank Partial Guarantee.
TECHNOLOGY REGION ID PROVINCE PROJECT NAME BIDDING CONSORTIUM MW AWARDED PRICE (USD/MWh)
SOLAR PV
REST OF SOLAR
SFV-31 SAN JUAN P.S. Sarmiento EMPRESA MENDOCINA DE ENERGÍA S.A.P.E.M. 35 53.0
SFV-46 SAN JUAN P.S. Ullum N1 ENERGIAS SUSTENTABLES / FIDES GROUP 25 53.7
SFV-49 SAN JUAN P.S. Iglesia - Guañizuli JINKOSOLAR HOLDING 80 54.1
SFV-45 SAN JUAN P.S. Ullum N2 ENERGIAS SUSTENTABLES S.A / ALEJANDRO IVANISSEVICH / FIDES GROUP
25 55.2
SFV-37 SAN JUAN P.S. Ullum 4 COLWAY 08 INDUSTRIAL / ILDEFONSO GUILLERMO CLAVIJO / FERNANDO ÁNGEL MARESCA
14 56.5
SFV-32 SAN JUAN P.S. Ullum3 ENERGIAS SUSTENTABLES / ALEJANDRO IVANISSEVICH 32 57.6
SFV-57 SAN JUAN P.S. Las Lomitas LATINOAMERICANA ENERGIA 2 59.2
SFV-41 SAN LUIS P.S. La Cumbre DIASER 22 56.7
SFV-36 SAN LUIS P.S. Caldenes del Oeste QUAATRO PARTICIPACOES 25 58.9
ROUND 1.5 - LIST OF AWARDED PROJECTS
Project requested World Bank Partial Guarantee.
ROUND 1.5: SOLAR PROJECTS AWARDED
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
NOA REGION
51,9 53.4 53.7 56.3 56.4
0
10
20
30
40
50
60
P.S. SAUJIL (23) P.S. TINOGASTA (15) P.S. FIAMBALÁ (11) P.S. CAFAYATE (80) P.S. NONOGASTA (35)
Awar
ded
Pric
e (U
S$/M
Wh)
48.0 52.0 53.0 53.7 54.1 55.0 55.0 55.0 55.0 55.2 56.5 56.7 57.6 58.9 59.2
0102030405060
P.S.ANCHORIS
(21)
P.S. PASIP(1)
P.S.SARMIENTO
(35)
P.S. ULLUMN1 (25)
P.S. IGLESIA- GUAÑIZULI
(80)
P.S. LAVALLE(18)
P.S. LUJANDE CUYO
(22)
P.S. LA PAZ(14)
P.S.GENERAL
ALVEAR (18)
P.S. ULLUMN2 (25)
P.S. ULLUM4 (14)
P.S. LACUMBRE
(22)
P.S.ULLUM3
(32)
P.S.CALDENESDEL OESTE
(25)
P.S. LASLOMITAS (2)
ROUND 1.5: SOLAR PROJECTS AWARDED
Note: Figure in parenthesis represents awarded power capacity in MW for each project.
REST OF SOLAR REGION
Colw
ay 0
8 In
dust
rial S
.L. /
IL
DEFO
NSO
GU
ILLE
RMO
CLA
VIJO
/
FERN
ANDO
ÁN
GEL
MAR
ESCA
Awar
ded
Pric
e (U
S$/M
Wh)
QU
AATR
O P
ARTI
CIPA
COES
S.A
.
ROUND 1.5 - LIST OF AWARDED PROJECTS
Project requested World Bank Partial Guarantee.
Thank You
Undersecretariat of Renewable Energy Ministry of Energy and Mining Presidency of the Nation
Paseo Colón 189 Piso 9 Tel. (+54 - 11) 4349-8033/8186 [email protected]
Documents available at: www.cammesa.com.ar and www.minem.gob.ar