M cKenney’s replaced nine chilled water coils in 34-year- old air handling units (AHUs) located in an operation center for a large, public service company. THE CHALLENGE The facility required zero downtime during occupied hours, which gave the team only 30 hours on weekends to complete the project. The AHUs overhaul took place in small, 200-square-foot mechanical rooms and the team knew it had to act quickly and decisively as it worked alongside other trades. In addition, an awkward piping configuration restricted prefabrication work and the condition of the area under the coils was unknown. THE SOLUTION With design plans and detailed schedules in place, the McKenney’s team accelerated AHU replacements. New custom-built stainless steel drain pans were also fabricated to fit inside the existing pan to support the weight of the replacement coils. THE RESULTS The project was completed on time and on budget. The AHUs are now running more efficiently, saving energy and opera- tional costs. Team Accelerates Coil Refit PROJECT NAME Chilled Water Coil Replacement Project PROJECT LOCATION Charlotte, North Carolina PROJECT TEAM Owner: Utility Holding Company Contractor: McKenney’s, Inc. SPECIALIZATIONS Design/Build Pipe Shop Prefab MARKETS Mission Critical Commercial Office Central Plants The content of this document is not intended as an endorsement. www.mckenneys.com © 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 [email protected] 3601 Performance Road Charlotte, North Carolina 28214

Chilled Water Coil Replacement Project

Embed Size (px)

Citation preview

Page 1: Chilled Water Coil Replacement Project

McKenney’s replaced nine chilled water coils in 34-year-old air handling units (AHUs)

located in an operation center for a large, public service company.

THE CHALLENGEThe facility required zero downtime during occupied hours, which gave the team only 30 hours on weekends to complete the project. The AHUs overhaul took place

in small, 200-square-foot mechanical rooms and the team knew it had to act quickly and decisively as it worked alongside other trades. In addition, an awkward piping configuration restricted prefabrication work and the condition of the area under the coils was unknown.

THE SOLUTIONWith design plans and detailed schedules in place, the McKenney’s team accelerated

AHU replacements. New custom-built stainless steel drain pans were also fabricated to fit inside the existing pan to support the weight of the replacement coils.

THE RESULTSThe project was completed on time and on budget. The AHUs are now running more efficiently, saving energy and opera- tional costs.

Team Accelerates Coil RefitPROJECT NAME

� Chilled Water Coil Replacement Project

PROJECT LOCATION

� Charlotte, North Carolina

PROJECT TEAM

� Owner: Utility Holding Company

� Contractor: McKenney’s, Inc.

SPECIALIZATIONS

Design/Build

Pipe Shop Prefab

MARKETS

� Mission Critical

� Commercial Office

� Central Plants

The content of this document is not intended as an endorsement.

www.mckenneys.com© 2016 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.

McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.

404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316

704-357-1200 [email protected]

3601 Performance Road Charlotte, North Carolina 28214