Project Profile:

Brownhills, Casting Plc – Case Study

O’Brien is confident to say, using its wealth of knowledge it is able to target each and every new contract with a smart approach, offering clients the best in quality and construction knowledge.

Client: Seddon Construction Project: New Warehouse Facility, Castings Plc Location: Brownhills, West Midlands Value: £2m Contract Duration: 22 weeks

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Page 3: Construction and Earthworks for Brownhills, Casting Plc

About the Project:

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Work carried out by O’Brien

The construction of a new warehouse and external yard facility for Castings Plc, Brownhills. The initial bulk earthworks operations carried out by O’Brien Contractors required the remediation of the 23,000m2 site, including breakout of existing structures to crush for re-use and the cutting and filling of 10,000m3 of site one material and subsequently capped with 10,000m3 of imported 6F2 granular fill.

A 180m long, 450mm thick concrete retaining wall was constructed to the perimeter of the building footprint with the wall heights varying from 2.2m high to 6m high, the foundations to the retaining wall was positioned on concrete piles. The foundation depths varied from 0.6m deep to 1m deep with a total weight of 205 tonnes of rebar used in the foundations.

The 6100m2 floor area of the building was made up of reinforced concrete ground beams and pile caps being constructed over concrete piles. A total tonnage of re-bar used in the ground beams and pile caps was 210 tonnes.

The associated drainage to the building consisted of 1000lm storm water sewer out-falling into a newly constructed 1000m3 attenuation lagoon which then fed into the neighbouring canal through a hydro brake manhole and newly formed gabion baskets on the embankment. A 200m3 attenuation tank was also installed to retain water in flash floods.

The externals consisted of a kerbed roadway, 2500m2 of tarmac car park and 5000m2 of 205mm thick concrete with a brushed finish, positioned on a bed of 200mm of type one stone.

Page 4: Construction and Earthworks for Brownhills, Casting Plc

O'Brien Contractors LtdManor Cottage, Church LaneLeamington SpaCV32 7JT www. obriencontractors.co.uk |[email protected]| Tel: 01926 423 918

Core Operations:

“O’Brien – Delivering a Smart Approach to Construction”

O’Brien Group offers expert teams across a diverse range of services. All five construction led services, Design and Build, Construction, Sports Pitches, Earthworks, Laser Levelling and Plant Hire operate highly skilled teams who aim to provide the best in construction knowledge and a smart approach to every aspect of our works.

• Bulk earthworks and site clearance• Ground stabilization• Reinforced concrete works including foundations, floors, retaining walls and external service yards• Roads and sewers• Drainage, pipework and associated works• External works including block paving and slabbing• Parking areas• Earthworks’ design and ground modelling facilities• Fine tolerance Laser Levelling and 3D machine control system

Page 5: Construction and Earthworks for Brownhills, Casting Plc

O'Brien Contractors Ltd Manor CottageChurch LaneLeamington SpaCV32 7JT

Website: www. obriencontractors.co.uk

Email: [email protected]

Tel: 01926 423 918

Contact Details:

Connect with us via our social media channels:

Twitter

Google+

Facebook

Linkedin