Aeroportos Brasil Viracopos S.A. – Project Status
2
Construction of the structural pillars for the new passenger
terminal
3
Aeroportos Brasil Viracopos – Project Status
4
Aeroportos Brasil Viracopos – Project Status
5
Construction of the blocks and
pillars
Aeroportos Brasil Viracopos – Implementation of the
infrastructure and mesostructure in the Pier-C region
Preparing structural reinforcements Preparation for block construction and stake
leveling
Detail of the scaffolding used for pillar
construction
6
Aeroportos Brasil Viracopos – Implementation of the Pier C
Infrastructure
Bulldozed area in the region of the NTPS corridor
Pouring lean concrete into the base of block BL-1
in the NTPS corridor area
Semi-completed foundations to support
the corridor blocks Preparing blocks in the NTPS corridor area.
7
Aeroportos Brasil Viracopos – Implementation of the Pier A
Infrastructure
Implementing the infrastructure for NTPS Pier A
Excavation of BL-4 to raze the stake heads and
prepare lean concrete for NTPS Pier A. Enclosure for pouring concrete into a block at Pier
A Block awaiting concrete at NTPS Pier A
8
Aeroportos Brasil Viracopos S. A. - Concession
Concession: 30 years
Regulatory Agency ANAC
Share held by Triunfo: 23%
Operation Start Date: November 2012
Construction Start Date: August 2012