McKenney’s installed a heating and air conditioning system at a new mixed-use, multi-family
high-rise condominium.
The ChallengeMcKenney’s needed to install a complete condenser water plant including pumps and cooling towers. Simultaneously, water source heat pumps in each of the approximately 350 units spread over 35-floors had to be
installed in the condominium tower. Rough-in had to be coordinated in very tight spaces with nine-foot floor-to-floor heights.
The SoluTionExtensive planning, shop drawings, prefabri-cation of piping and sheet metal ductwork, and off-site pre-assembly contributed to the successful installation. The team also carefully coordinated equipment, material deliveries and packaging necessary for lifting the
components to all 35 floors. They also helped create and drive the schedule to complete the work at one time and minimize return trips into the condominiums.
The ReSulTSBuilding owner Daniel Corporation was impressed by the team’s very high productivity and quality work that resulted in on-time completion with no injuries.
Coordination Overcomes ChallengesPRojeCT name
� 1010 Midtown
PRojeCT loCaTion
� Atlanta, Georgia
PRojeCT Team
� Owner: Daniel Corporation
� General Contractor: Brasfield & Gorrie
� Architect: Rule Joy Trammell + Rubio
� Engineer: Jordan & Skala
PRojeCT STaTuS
� Completed
leeD® CeRTifiCaTion level
� N/A
The content of this document is not intended as an endorsement.
www.mckenneys.com© 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000 [email protected] 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316
704-357-1200 [email protected]
3601 Performance Road Charlotte, North Carolina 28214
Photo courtesy of Rule Joy Trammell + Rubio, LLC.