Reduce risk, increase performance, improve quality, introduce sustainable practice and complete on time. Sub contract the screed system to CSC Screeding Ltd on your next BSF project. Providers of competitively priced high-quality, value engineered floor screed solutions for BSF projects across the UK.

CSC Screeding

Embed Size (px)

DESCRIPTION

This is an introduction as to how CSC Screeding have positioned themselves as a force to be reckoned with in the screeding industry.

Citation preview

Page 1: CSC Screeding

Reduce risk, increase performance, improve quality, introduce sustainable practice and

complete on time.

Sub contract the screed system to CSC Screeding Ltd on your next

BSF project.

Providers of competitively priced high-quality, value engineered floor screed solutions for BSF projects across the UK.

Page 2: CSC Screeding

Company background and track record

In depth experience of the Education Sector & BSF

Recent BSF Case studies

Working in partnership with UFH Experts

Approved supplier status / Certified Installer status

Benefit summary of FlexiDry

Joint Warranty with Warmafloor (GB) Ltd

Presentation Outline

NEXT

Page 3: CSC Screeding

Company background

HQ based in High Wycombe Buckinghamshire with operational capability to provide a nationwide screed installation and technical consulting service.

More than 22 yrs experience with many of the top 100 Main Construction Contractors including:-

Established partnerships with mid - market specialists across the UK including :-

NEXTBACK

Page 4: CSC Screeding

Sectors

Core Sectors

Education (BSF) / Health/ Retail Transport & Travel / Housing / High End Residential/ Commercial Developments

Emerging Sectors

- Sustainable building initiatives such as Passivhaus. - Skanska Modernahus Project. - Green Power Centre

NEXTBACK

Page 5: CSC Screeding

Why CSC

Positioned as the top technical expert in the UK

Reputation for knowledge sharing. Collaborative approach with all our clients from start to finish. Focused on innovation ……and can back this up. High capability and proven value engineering delivery. Add value which supports perfect delivery. Leaders in value engineering sustainability into screed application

NEXTBACK

Page 6: CSC Screeding

Market Leaders

Bandwidth

Market leader in fast drying screed systems. Market leader in screed designed specifically for UFH systems. Market leader in screed systems designed with sustainability in mind. Unique installation of high strength / high performance systems. Installer of free-flowing systems…….where appropriate Installer of basic traditional sand and cement screed.

NEXTBACK

Page 7: CSC Screeding

Video link Intro.

VIDEO

NEXTBACK

Page 8: CSC Screeding

Innovators in screed science

NEXTBACK

Please click the link below to be transported to the FlexiDry website

Page 9: CSC Screeding

Education

In depth experience of the Education Sector

Front runner on a number of across BSF projects

Particularly focused on providing value engineering solutions.

Completed more than 65 school projects recently.

Majority involving UFH systems and within school environments.

NEXTBACK

Page 10: CSC Screeding

Supporting perfect deliveryon all BSF floor screed installations with FlexiDry F1, F2 and F3

NEXTBACK

Page 11: CSC Screeding

Value engineering

CSC are leading the way with a unique value engineering solution for a number of the initial BSF projects. These recent developments have significantly improved the whole approach to screed installation. This is highlighted within the example reference sites covered within this presentation.

Some of the early adopters include names such as Keir Group, Mansell & Wates Construction. The key to this success relates to a well proven and highly efficient screed system called FlexiDry, now recognised as a major step change in supporting perfect delivery

NEXTBACK

Page 12: CSC Screeding

Longbenton Campus

NEXTBACK

This is a press release which became public after Kier changed the spec from using Free-flowing Anhydrite screed 1200m2 into the screeding to use FlexiDry:

Contracts Manager for Kier North Tyneside Peter Dixon was instrumental in changing the specification from a free flowing anhydrite screed and replacing it with the well established and leading FlexiDry F1 floor screed system.

Peter commented “Having considered the drying timelines and other performance data of the original Anhydrite Screed System, we soon realised the floors would take 90 days to dry which would seriously adversely impact the overall construction programme”.

Longbenton press release