12
Washington State Ocean Energy Conference November 9, 2011 Executive Director – Jeffery K. Robb

Cwts ocean energy robb

  • Upload
    blemon

  • View
    156

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Cwts ocean energy robb

Washington State

Ocean Energy Conference

November 9, 2011

Executive Director – Jeffery K. Robb

Washington State

Ocean Energy Conference

November 9, 2011

Executive Director – Jeffery K. Robb

Page 2: Cwts ocean energy robb

Alternative EnergyAlternative Energy

Port Strategic PlanPort Strategic Plan: :

Be a Leader in the Assessment and Be a Leader in the Assessment and Development of New Market Opportunities Development of New Market Opportunities

Partnership with Battelle Partnership with Battelle Supported EDC Grant Application to Develop Alternative Supported EDC Grant Application to Develop Alternative

Energy Road MapEnergy Road Map Develop Waterfront Infrastructure in Support of IndustryDevelop Waterfront Infrastructure in Support of Industry Develop Industrial Park Facilities in Support of IndustryDevelop Industrial Park Facilities in Support of Industry

Page 3: Cwts ocean energy robb

Port Angeles…Ideally LocatedPort Angeles…Ideally Located

Port Angeles

Page 4: Cwts ocean energy robb

Port Angeles HarborPort Angeles Harbor

Terminal #1 & #3

Terminal #7Terminal #5

Page 5: Cwts ocean energy robb

TerminalTerminal #1 #1

Berth Capacity up to 1,200 feetBerth Capacity up to 1,200 feet 125,000 Dead Weight Tonnage125,000 Dead Weight Tonnage 38 Feet Draft at Berth38 Feet Draft at Berth Cold Iron Electrical ServicesCold Iron Electrical Services Topside Repair of Ships and BargesTopside Repair of Ships and Barges Tug and Fueling ServicesTug and Fueling Services

Terminal #3Terminal #3 Berth Capacity up to 750 feetBerth Capacity up to 750 feet Engineering and Permitting in Process to Engineering and Permitting in Process to

Expand to 1,200 feet CapacityExpand to 1,200 feet Capacity

Page 6: Cwts ocean energy robb
Page 7: Cwts ocean energy robb

Airport and Industrial PropertiesAirport and Industrial Properties

William R. Fairchild International AirportWilliam R. Fairchild International Airport 63506350’’ Runway Capable up to 737 Aircraft Runway Capable up to 737 Aircraft Instrument Landing System (ILS)Instrument Landing System (ILS) Scheduled Air ServiceScheduled Air Service

110 acre Industrial Park 110 acre Industrial Park Access to Primary and Secondary Runway Access to Primary and Secondary Runway Additional Industrial Property AvailableAdditional Industrial Property Available Under Construction Two 25,000 SF Composite Under Construction Two 25,000 SF Composite

Manufacturing Buildings Manufacturing Buildings

Page 8: Cwts ocean energy robb

Angeles Composite TechnologiesAngeles Composite Technologies125 Jobs and growing…125 Jobs and growing…

Page 9: Cwts ocean energy robb

Composites Manufacturing Composites Manufacturing Campus ExpansionCampus Expansion

Page 10: Cwts ocean energy robb

November 3, 2011November 3, 2011

Page 11: Cwts ocean energy robb

Competitive Advantages

Proximity to Ocean Energy Deep Water Harbor with Marine Terminals Trained Marine Trades Workforce Industrial Manufacturing Facilities International Airport Pacific Northwest National Laboratory Peninsula College Community Support

Page 12: Cwts ocean energy robb

Port of Port AngelesPort of Port AngelesLeaders in Economic Development