Waste Minimisation and Waste Minimisation and Sustainable Procurement in Sustainable Procurement in Construction Construction Alex Albon (@earthexchange)

Earth Exchange Waste Pecha Kucha

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Earth Exchange Waste Pecha Kucha

Waste Minimisation and Waste Minimisation and Sustainable Procurement in Sustainable Procurement in

ConstructionConstruction

Alex Albon (@earthexchange)

Page 2: Earth Exchange Waste Pecha Kucha

Message From (Near) The Top!

“It is imperativeimperative that we start to think of waste as a waste as a resourceresource wherever possible. … it is more important than ever that we enable businesses to find a we enable businesses to find a market for materialsmarket for materials which would otherwise be disposed of as waste”

The Rt Hon Hilary Benn MPSecretary of State for Environment, Food and Rural Affairs.

Page 3: Earth Exchange Waste Pecha Kucha

Drivers and Challenges

UK Construction uses more natural resources than any other industry

► Over 400 million tonnes per year

Page 4: Earth Exchange Waste Pecha Kucha

Drivers and Challenges

UK Construction accounts for more than 30% of UK’s total waste

► About 120 million120 million tonnestonnes per year

► About 13%13% of all materials brought to site are unusedunused

Page 5: Earth Exchange Waste Pecha Kucha

Drivers and Challenges

About 60 Million Tonnes per year is reused or recycled

► Vast majority of this is soils and soils and aggregatesaggregates

Page 6: Earth Exchange Waste Pecha Kucha

Drivers & Challenges

Many counties have no landfill voidno landfill void. SE England only 4 years void left

Of that already reused there are massive efficiency gains to be made of a scale of £££££££ Billions £££££ Billions ££££

Government ‘Strategy For Sustainable Construction’ June 2008 – 50% Reduction50% Reduction in Construction Wastes to Landfill 2012. Zero Zero wastewaste to landfill 2020

‘Sustainable Procurement AgendaSustainable Procurement Agenda’ – recycled content etc

Page 7: Earth Exchange Waste Pecha Kucha

Facts and Figures

Small House Plot Foundations Generates Equivalent to about 50 years of domestic waste50 years of domestic waste

arisings from a typical family of 4 in that house

Divert 1000m3 subsoil from landfill Equivalent to annual waste from 3600 peopleannual waste from 3600 people

Reuse 1000m3 at a site 8 miles (12km) closer than normal Save 1850 miles of haulageSave 1850 miles of haulage (Manchester to

Milan… and back!!) Save 2.8 tonnes COSave 2.8 tonnes CO22

Save £72,000 landfill taxSave £72,000 landfill tax

Page 8: Earth Exchange Waste Pecha Kucha

Current problem

The ‘Ephemeral’ nature of construction projects and variable project programmes makes makes ‘creating a market’ rather tricky!!‘creating a market’ rather tricky!!

WhoWho needs it? WhenWhen do they need it? HowHow do you get it? WhatWhat have you got? WhereWhere is it and wherewhere are you?

Current solution: Who you know What you know Last minute Non-strategic Suitable for use?

Page 9: Earth Exchange Waste Pecha Kucha

Here I Am?

Page 10: Earth Exchange Waste Pecha Kucha

Back in 5 minutes?

Page 11: Earth Exchange Waste Pecha Kucha

A Solution

Page 12: Earth Exchange Waste Pecha Kucha

The solution - Earth Exchange®

Page 13: Earth Exchange Waste Pecha Kucha

Features

Secure Web-basedSecure Web-based system to match surplus materials with deficits at the site level via a Google Maps

Covers entire UKentire UK with no geopolitical borders and resulting boundary effects!

But… has local focuslocal focus for the user.

Page 14: Earth Exchange Waste Pecha Kucha

Features

Time basedTime based – to incorporate: Changing construction programmes and needs ‘Quality’ considerations

Page 15: Earth Exchange Waste Pecha Kucha

Member’s Site

Page 16: Earth Exchange Waste Pecha Kucha

Member’s Site – Unique features

Multi-site capability user/map configuration

Site details – type of construction

Multiple-material capability

Availability/wanted dates

Haulage routes and distances

Contacts, communication, alerts, stats

Unlimited access and use (no pay per site etc)…

NEWNEW - Details of local service providers highlighted by proximity (Labs, haulage, consultants, plant etc).

Page 17: Earth Exchange Waste Pecha Kucha

Summary

Earth Exchange® has huge potential to save waste disposal, haulage and procurement costs

Earth Exchange® is a low cost, easy-to-use tool which can interface with SWMPs, BREEAM etc

Earth Exchange® creates the virtual ‘market market for materialsfor materials’ to match material requirements at locations and times to suit you

“Exchange It – Don’t Waste It”

Page 18: Earth Exchange Waste Pecha Kucha

Summary

Earth Exchange® : Offers huge financial and environmental benefits: Nearby reusable soils, aggregates and materials

mapped at source – virgin materials preserved, haulage reduced etc

Procurement time, effort and costs saved Improved RC KPI’s achievable Local users of surpluses mapped – disposal avoided,

haulage reduced Project flexibility Potential revenues realised for ‘unwanted’ materials

► Reduced Project Costs With Zero Effort!!Reduced Project Costs With Zero Effort!!

Page 19: Earth Exchange Waste Pecha Kucha

Virgin Materials Saved 156,000 t

Diverted from Landill 81,000 t

Heavy Haulage Saved

285,000 miles

Costs Saved

£4.125 Million