www.ESCOAtlantic.com (443) 553-5888
Epoxy Cool Roof Systems
This is the beginning of the job laying out the roof so that it can be scrubbed with harsh detergents and scrub brushes….the only way to eliminate all of the oils and dirt which get in
between the encapsulation process and the roof. s
Safety First
Bad areas can be replaced before ECRS installation
Repairing leaks
Preparation is the most important part of the job. All of the dirt and wales need to be removed so that the primer coat can fuse with the roof. The only way this can be done is by two hand
washings with harsh detergents and re-scrub again s
The roof is thoroughly washed and rinsed s
This is the roof before it is primer coated. This particular roof was about 26 thousand square feet and we started with the interior perimeter first and then build out from there
After prep....all coatings that may have been applied previously, are sanded
Beginning the process
Primer with polymesh fabric mat rolled in and then back rolled with 2nd coat of primer
Fiber and fabric on seams with 2 primer coats
Primer and fabric application
This is a picture of the primer coat with fiberglass strand embedded in it… there are 2 coats of this gray with fiberglass trends in it as well as a coat of reflective white epoxy as the finish
Epoxy with fiberglass strand as a primer coat
Close to finishing a large section
Closing out a large section
Closing out a large section
Further finishing up a section
Close up
Finished
Finished