Fire Protection SystemInspection and Test
อั�งกุ�ศ รุ่� �งแสงจั�นทรุ่�
Fire Protection Systems
• มี�โอักุาสใช้�งานน�อัย• จัะต้�อังใช้�งานได้�เมี��อัต้�อังใช้�งาน
• ผู้��อัอักุแบบ จัะต้�อัง อัอักุแบบรุ่ะบบท��ใช้�งานได้�
เท�าน�!น• รุ่ะบบจัะต้�อังต้รุ่วจัสอับและทด้สอับได้�
Inspection and Test
• Inspection• Test– Periodic Test– Acceptance Test
Fire Protection Systems
• Sprinkler• Water Spray• Clean Agent
Sprinkler System
• Wet pipe• Preaction– Single Interlock– Double Interlock
Sprinkler System
• ปกุต้%ไมี�มี�กุารุ่ไหลในท�อั• ไมี�มี�กุารุ่ท'างานในแบบ
Manual
Automatic Sprinkler
• Listed spray pattern• Sensitive to obstruction
Automatic Sprinkler
• Listed temperature rating
• Listed discharge coefficient
Wet Pipe
• Continuously charged• Immediate discharge
Preaction
• Continuously monitored by compressed air
• Require fire detection system
Single Interlock
• Water charge in system piping upon operation of alarm device
Double Interlock
• Water charge in system piping upon operation of alarm device and sprinkler opening
Preaction sprinkler
• Upright sprinkler• Dry sprinkler• Pendent sprinkler in
return bends and branch lines are above 4C
• Horizontal sidewall sprinkler installed so that water is not trapped
Required Information
• As-Built drawings• AHJ additional
requirements• Calculation sheets• Data sheets• User Manual• Maintenance Manual
Inspection
• Occupancy classification
• Protected area• Discharge area• System demand• Flow at most
remote sprinkler
• Flow at system riser
Inspection
• Location and quantity of equipments
• Pipe size and routing
• Sprinkler obstructions– Pattern
development obstruction
– Water distribution obstruction
Inspection
Sprinkler obstructions• Pattern development• Water distribution
Sprinkler obstruction
Sprinkler obstruction
Sprinkler obstruction
Hydrostatic test• 200 psi (13.8
bar) without loss for 2 hours
• Test pressure shall be read from a gauge located at the low elevation point of the system
Air test (Preaction)
• 40 psi (2.8 bar) with less than 1-1/2 psi (0.1 bar) in 24 hours
Operational test• Open Inspector’s test
connection• Alarm expected
within 5 minutesPreaction• Activate alarm device• Open Inspector’s test
connection• Water discharge
expected within 1 minute
Operational test
• Open main drain valve and leave open until pressure stabilized
• Close and open each control valves under system water pressure
• Open and flow test all pressure reducing valve
Water Spray System
• Open nozzle• Normally empty pipe
Water Spray Nozzle
• Predetermined pattern• Sensitive to wind draft
Required Information
• As-Built drawings• AHJ additional
requirements• Calculation sheets• Data sheets• User Manual• Maintenance Manual
Inspection
• Protected hazard• Design density• Protected area• System demand
Inspection
• Location and quantity of equipments
• Nozzle pattern and location
• Pipe size and routing
Hydrostatic test
• 200 psi (13.8 bar) without loss for 2 hours
• Test pressure shall be read from a gauge located at the low elevation point of the system
Operational test
• Test system actuation as per manufacturer’s manual
• Discharge test (Automatic, Manual, Emergency)
Clean Agent System
• Carbon Dioxide• Inert Gases• Synthetic Gases
Clean Agent System
• Normally empty pipe• 10 seconds – 60
seconds discharge• Require Automatic
detection and control
Carbon Dioxide
• Stored in liquid or superheated gas state
• No pressure gauge• Quantity check only by
weighing• Flow in two phases• Very low temperature
discharge• Nominal 60 seconds
discharge
Inert Gas
• Stored in high pressure compressed gas state
• Pressure gauge represent gas quantity
• Flow in gas state• Nominal 60 seconds
discharge
Synthetic Gas
• Stored in liquid state under Nitrogen propellant
• Pressure gauge represent propellant quantity
• Weighing or liquid level measuring for agent quantity
• Discharge within 10 seconds to prevent decomposition products
Required Information
• As-Built drawings• AHJ additional
requirements• Calculation sheets• Data sheets• User Manual• Maintenance Manual
Inspection
• Protected hazard
• Design concentration
• Protected volume
• System demand
• Discharge duration
• Operation sequence
Inspection• Location and
quantity of equipments
• Cylinder fills• Propellant pressure
level (if available)• Cylinders are secured
as per the design• Nozzle pattern and
location• Pipe size and routing• Protected area
dimensions
Inspection• Location of control panel• Location of field devices• Location of interface
control panel• Location of field devices• Wiring gauge and
conduit size• Dedicated power source• Standby power source or
integral battery
Inspection
Carbon Dioxide• Lock out valve MUST be
provided in each protected volume
• NO Abort switch
Inert and Synthetic Gas• Maintenance lockout
switch shall be provided• Abort switch shall be
provided
Hydrostatic test
Carbon dioxide• Not required
Inert or Synthetic Gas• 40 psi (2.7 bar) with no
more than 20% for 10 minute
Discharge test (Carbon Dioxide)
• Oxygen sensor with data logger
• Less than 10% Oxygen concentration
• 10 minute retention time
Room integrity test• Maximum
protected height
• Retention period
Operational test
• Notify all concerning parties
• Disarm the system
Operational test• Alarm device and
alarm response• Automatic actuation
sequence• Abort function• Manual actuation• Emergency
actuation• Main/Reserve
changeover• Supervisory devices• Interface
verifications
Operational test
Trouble supervision• Initiating circuits• Indication
circuits• Release circuits• Main power
supply• Standby power
supply