Cushing Village Belmont, MA Welcome to Cushing Village PLANNING BOARD PRESENTATION Feb 28, 2012 1

First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Embed Size (px)

DESCRIPTION

Cushing Village is Smith Legacy Partners Series LLC's proposal to transform Belmont, Massachusetts' Cushing Square with a major compact, mixed-use retail/residential village development.

Citation preview

Page 1: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Welcome to Cushing Village

PLANNING BOARD PRESENTATION Feb 28, 2012

1

Page 2: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Existing parcel data

Lot area: +/- 2-Acres

Frontage: 980-LF

Grade change: 26-FT

26-FT

2

Page 3: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Existing context

533 Belmont St +/- 44’ h

125 Trapelo Rd +/- 62’/74’ h

Common St Commercial Bldgs

Winters hardware/Belmont Savings

3

Page 4: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Three Separate Buildings

Site Concept

Three Separate Buildings

1. Reduce the massing

2. Allow free-flow of circulation

3. Provide opportunity for varied design

4

Page 5: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Main Vehicular

route

Vehicular Circulation

Site Concept

Horned Rd Access closed except for emergency

5

Page 6: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Ramp Access to underground

parking

Car Circulation

Site Concept

6

Page 7: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Main Vehicular

route

Parking & Loading

Parking at grade: 96 Spaces

Site Concept

Direct Access to Municipal Lot

Covered Loading Dock

7

Page 8: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Pedestrian Routes

Pedestrian

Site Concept

8

Page 9: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Plantings

Landscaping

Densely planted walkway

Planting and planter beds throughout

Plantings between buildings and property line

Interface w/Trapelo/ Common Road changes

9

Page 10: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Planters Benches & Seating areas

Site Amenities

Landscaping

Bike parking racks

156 – spaces total

10

Page 11: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Landscaping

Good-Neighbor fence Board fencing with Trellis topper

Fencing and Screening

11

Page 12: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

BUILDING ONE

TheWinslow

BUILDING TWO

The Pomona BUILDING THREE

The Hyland

Building Design

Three Separate Buildings

1. To create visual interest

2. To respond to different residential needs

3. To provide a high sense of identity

Three different designs:

12

Page 13: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

BUILDING ONE

Winslow

Building Design

Three Separate Buildings

TRAPELO RD VIEW

THE WINSLOW – WILLISTON VIEW

13

Retail - 10,600-SF Apartments-28

Page 14: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

BUILDING TWO

Pomona

Building Design

Three Separate Buildings

TRAPELO RD VIEW COMMON ST VIEW

14

Retail - 21,600-SF Apartments -66

Page 15: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

BUILDING THREE

Hyland

Building Design

Three Separate Buildings

COMMON ST VIEW BELMONT ST VIEW

15

Apartments - 48 Fitness – 3,600-sf

Page 16: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Ground Floor: Commercial

Retail

Retail food store Starbucks

Restaurant

Fitness club

Parking

Building Interiors

16

Page 17: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Typical Residential Level

Building Interiors

Apartments – All one and two bedrooms

Many units have balconies or bays

Each building had is own entry

Each building has direct access to parking garage

17

Page 18: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Street View

Trapelo Rd Streetscape

Winters hardware Common St The Pomona The Winslow Williston Rd

18

Page 19: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Street View

Belmont St Horne Rd Trapelo Rd

Common St Streetscape

19

Page 20: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Craft and Detailing BUILDING ONE

The Winslow

Arts and Crafts Style

Brick, Shingles, Clapboard, Wood Details,

Traditional Windows, Metal Roof

Decorative detailing

Traditional Window Styles

Wood details on porch

‘Cylinder’ Room w/decorative brick

20 Decorative brick work

Brackets and metal roof

Page 21: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

BUILDING TWO

The Pomona

Decorative entries

Rustic stone base Metal trimmed bay window On stone tile face

Clock tower with murals

Decorative window

Recessed balconies

Craft and Detailing

Naturalistic Detailing

Stone and Stucco

Decorative Metal Work

Juliet balcony ‘Twig” balusters

Decorative Metal Work 21

Page 22: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

BUILDING THREE

The Hyland

Decorative cornices

Cast stone detailing and Juliet balcony

Cast stone entry arch Brick and steel trellis

Decorative façade pattern

Decorative Cornices

Craft and Detailing

Hillside Village:

Brick, Stucco, Decorative Metalwork

22

Page 23: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Street View

View from Belmont and Common 23

Page 24: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Street View

View at Trapelo Rd

24

Page 25: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Key Points to Note

1. Project Size

2. Parking

3. Traffic

4. Residential Setbacks

5. Building Height

6. Community Benefits

25

Page 26: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

26

• With each proposal for Cushing Village the building overall area has decreased.

• The total residential area has decreased.

• There are fewer large units and more one-bedrooms.

• Commercial use is on ground floor only.

Key Points to Note

1. Project Size

Page 27: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

2012 Proposed FAR 2.05

2010 FAR 2.37

zoning Allowable FAR 3.0

27

1. Project Size

Key Points to Note

Page 28: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

1. Project Size

Allowable

by Zoning

Total Area (SF)

257,500

FAR 3.00

1-Bedrm units

2-Bedrm units

3-Bedrm units

Residential units

Total Bedrooms

Total Residential

Area

2008

225,000

2.6

50

85

15

150

265

180,000

2010

203,000

2.37

40

80

3

123

209

145,410

2012

178,604

2.05

82

60

0

142

202

141,346

28

Key Points to Note

Page 29: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

• Parking provided completely meets the By-Law requirement.

• Cushing Village is not seeking a reduction in parking required.

• Parking provided anticipates highest intensity use, such as a quality restaurant.

• Municipal parking is directly below the current location with direct elevator access to the street

• In addition to the Municipal Lot, there is plentiful commercial parking that will benefit businesses in the Square

2. Parking

• In comparison to the 2010 design, we have added about 25 more on-grade spaces.

Key Points to Note

29

Page 30: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Parking Below Grade

181 Spaces

DEDICATED

RESIDENTIAL LOT

MUNICIPAL LOT

(50 SPACES) DIRECT ACCESS

TO

STREET LEVEL

Parking At Street Grade

96 spaces

STRUCTURED

PARKING

DIRECT ACCESS

TO MUNICIPAL

PARKING

RES ACCESS

TO WINSLOW

DIRECT

ACCESS TO

POMONA

DIRECT

ACCESS TO

HYLAND

2. Parking

Key Points to Note

Total Parking Spaces 277

30

Page 31: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Commercial - Ground floor retail One space / 550-SF 55

Commercial – 120 seats Starbucks and Restaurant

Equivalent requirement for retail only would be 7,000-SF X 1/550-SF = 13

spaces

One Space /4 seats 30

Parking Requirement for Cushing Village 227

Municipal Lot Relocation – Per agreement with BOS 50

Total Parking Requirement 277

Potential Reductions per CSOD By-laws that an Applicant may be

entitled to:

Project Location within 250-ft of Municipal Garage 20% reduction (55)

Within 200-ft of Public Transportation 10% reduction (28)

NET REQUIREMENT Potential Reduction of 83 Spaces 194

Parking – What is required (per CSOD)? By-Law Required

Residential One space / unit 142

2. Parking Compliance

Key Points to Note

31

Page 32: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

• Cut-through traffic on Horne and Williston Roads will be eliminated.

• Even under peak hour times, traffic delay is not expected to exceed a few seconds more.

• Smart Growth redevelopment encourages walking, bicycles, and the T.

• Development of mixed-use communities discourages the use of automobiles.

Key Points to Note

3. Traffic

• Cushing Village will have minimal impact on traffic patterns in the area.

32

Page 33: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

33

Project – related increases in Delay at peak hour No Build versus Build

3. Traffic

Key Points to Note

Negligible

Page 34: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

• The buildings meet all the setback requirements.

• All the higher parts of the buildings are massed toward the commercial streets.

• The first floor setbacks are from 20-ft to 40ft and average about 30-ft

• The upper levels either step back as they rise or are set back 30-ft to 50-ft.

Key Points to Note

4. Residential Setbacks

34

Page 35: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

35

BUILDING ONE

TheWinslow

BUILDING TWO

The Pomona BUILDING THREE

The Hyland

4. Building Setbacks

Key Points to Note

First floor set back 20’-0” to 55’-6”

Page 36: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

36

BUILDING ONE

TheWinslow

BUILDING TWO

The Pomona BUILDING THREE

The Hyland

4. Building Setbacks

Second floor setback 20’-0” to 59’-6”

Key Points to Note

Page 37: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

• All the buildings are under 48-ft and four stories or less.

• The two-story grade difference in the site contours means that there has to be some stepping to accommodate the site.

• The Hyland site alone accounts for 15-ft of the site grade. We comply with the height requirement by stepping each side of the building (Common and Belmont).

Key Points to Note

5. Building height

37

Page 38: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Cushing Village Belmont, MA

BUILDING THREE

Hyland @BELMONT ST

+/-43.0’ 4-stories

+/-46.5’ 4-stories

BUILDING THREE

Hyland @COMMON ST

Average grade @Belmont St

Average grade @Common St

Submerged Level

48’Allowable

48’Allowable

38

5. Building Height

Key Points to Note

Page 39: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

• There are large one time cash benefits to the Town before construction begins.

• There are long term direct net benefits from real estate and excise taxes (after subtracting for education costs).

• There are huge multiplier effects of bringing in new economic activity from a mixed-use development.

Key Points to Note

• New permanent jobs will be created.

6. Community Benefits

39

Page 40: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

One-Time Municipal Revenue Municipal Parking Lot Purchase $ 850,000 Permitting Fees $ 400,000 _____________________________________________ Total $1,250,000

One-Time Municipal Revenues

Based upon total project costs of $50M ($40M Construction Costs & $10M Soft Costs) and $13.35/$1,000 tax rate

Annual Municipal Revenues

Annual Revenues Less Schooling Costs Property Taxes $ 670,000/year* Excise Taxes $ 40,000/year Less Schooling Costs ( $120,000/year) _____________________________________________ Total $ 590,000/year

$40M Projected Hard Costs In discussions with Belmont firms to consider for a significant portion of the budget

Estimated 227 Jobs to Be Created During Construction (~2 Yrs.)

Construction Project

40

6. Community Benefits

Key Points to Note

Page 41: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

Proposal summary

• Is a Mixed-Use brownfield redevelopment, which will bring added vitality to Cushing Square.

• Will bring significant economic benefit to Belmont.

• Greatly increases parking for commercial uses.

• Conforms to the Zoning By-Law.

• Has been designed to create a rich and varied architectural character.

Cushing Village

41

Page 42: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

42

Stay informed and engaged through interactive outreach…

Second Life Virtual Model

E-mail Newsletters

Blog/RSS Feed Twitter - @CushingVillage

Website – www.cushingvillage.com

Electronic Newsletter Signup being passed around the room

Page 43: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

43

Experience our vision for Cushing Village first-hand… in Cushing Virtual

Page 44: First Cushing Planning Board Hearing, Belmont, MA - Feb. 28, 2012

Cushing Village Belmont, MA

44

Learn more and get involved through community events…

Community Outreach Reception

Next Event to Launch Cushing Virtual (Our 3D Interactive Version of Cushing Square)