Overview

• Create Web interface to LCC Calculator for savings from Intelligent Building Systems Integration

• RS Means to create benchmark data from internal and external resources

• Annual Dollar savings from integration– Characteristics of high, medium, low integration– Phase I study

• Market Analysis and Intelligence

Page 3: Iibc Ahr Bit Jan242006

Functionality

• INPUTS– Building type– Size of Building – Location– Integration level

Page 4: Iibc Ahr Bit Jan242006

Issues to be evaluated

• Operational costs

• Labor costs

• Repair

• Maintenance

• Initial construction

• Regulatory Issues

Page 5: Iibc Ahr Bit Jan242006

Types of Integration

• Security

• Lighting

• HVAC

• Occupancy Sensors

• Elevators

Page 6: Iibc Ahr Bit Jan242006

Benchmarking Requirements

• Data gathering

• Analysis

• Comparative Data sets

• Mapping

• Input from Manufacturers

Page 7: Iibc Ahr Bit Jan242006

Life Cycle Cost Results

• Annual Energy Savings

• R&M Savings

• Direct Labor

• 20 year comparison

Page 8: Iibc Ahr Bit Jan242006

Activities

• Data Input from manufactures

• Workgroup to define parameters

• Develop working prototype

Page 9: Iibc Ahr Bit Jan242006

Phase I – IB Integration Evaluation

• Definitions– High, Medium and Low

• LCC Issues

• Roadblocks

• Current Level of Integration

• Benefits of Integration implementation

Page 10: Iibc Ahr Bit Jan242006

Preliminary Findings

Type of integration Buildings 50K-100K SF

Buildings 100K-600K SF

Buildings over 1 million SF

Full Integration: Costs install $ 2.672 $ 2.982 $ 2.662

Savings Energy (P/A) 2%, 10 yrs5

$(3.41) $(6.38) $ (4.17)

Maintenance (P/A) 5%, 10 yrs6 $ 0.62 $ 3.173 $ 1.933

Net Total Present Day Cost $ (0.12) $ (0.23) $ 0.42 Partial Integration: Costs install (present) $ 3.14 $ 3.20 $ 2.861

Savings Energy (P/A) 2%, 10 yrs5

$ (3.23) $(6.11) $ (4.58)

Maintenance (P/A) 5%, 10 yrs6 $ 1.85

$ 3.17 $ 1.93

Net Total Present Day Cost $ 1.76 $ 0.26 $ 0.21 Non-integrated Costs install $ 0 $ 0 $ 0 Savings Energy $ 0 $ 0 $ 0 Maintenance (P/A) 5%, 10 yrs6 $ 11.354 $ 6.334 $ 3.864

Net Total Present Day Cost $ 11.35 $ 6.33 $ 3.86 Net Savings Full Integration7

$ 11.47 $ 6.56 $ 3.44 Net Savings Partial Integration7

$ 9.71 $ 6.07 $ 3.65

Page 11: Iibc Ahr Bit Jan242006

BIQ Building Intelligence Quotient

BIQ Consortium

David Katz, MBA – Project Manager

[email protected]

Page 12: Iibc Ahr Bit Jan242006

Building Intelligence, Reality and Perception

REALITY•cost savings•functional enhancements

(comfort, security, flexibility, reliability)

•Increased productivity

PERCEPTION• expensive• complex – hard to

implement• a luxury

• not “mainstream”

POSITIVE RETURN ON INVESTMENT

• LACK OF AWARENESS

• FEAR OF THE UNKNOWN

Page 13: Iibc Ahr Bit Jan242006

Objectives of the BIQ Tool

Promote building intelligence integration and products by:

• demonstrating the added value they can bring to a property

• demystifying implementation of building intelligence

EMPHASIZE: POSITIVE RETURN ON INVESTMENT

INCREASE AWARENESS

DISPEL FEAR OF THE UNKNOWN

Page 14: Iibc Ahr Bit Jan242006

Rating and Certification

(demonstrates the added value)

Upgrade Design and

Implementation Guidance

(demystifies implementation)

+

BIQ - an online tool

Page 15: Iibc Ahr Bit Jan242006

BIQ concept is based on:

• Technology Roadmap for Intelligent Buildings• CABA’s Best Practices Guide for Evaluating

Intelligent Building Technologies IS2002-28• Green Globes Rating Assessment Protocol that

is used for:– Integrated design of new buildings– Improving existing buildings (BOMA Go

Green)– Facility fit-up (Commercial Interiors)– Emergency management of buildings

Page 16: Iibc Ahr Bit Jan242006

Why online?

• Interactive• Makes it possible to change inputs at the

click of a mouse• Generates scores and reports effortlessly• Makes it easy to store and compare data

about various properties • Allows for multiple users• Puts product information at your fingertips

Page 17: Iibc Ahr Bit Jan242006

How can BIQ promote building intelligence ?

1. Provides a baseline assessment of an existing building

2. Helps to articulate the targets for a high performance building

3. Provides a gap analysis between the baseline building and the high performance version

4. Provides step-by-step guidance on how to get there

Base building profile

High performance intelligent building targets

Gap analysis Building intelligence design guidance

Page 18: Iibc Ahr Bit Jan242006

Discussion Points

• CABA $/ BIQ, Annual License & Sponsorship?

• “Fixed assessment” or “Needs-based” assessment?• How to integrate “technology product solutions”?

• Technical Steering Committee Membership?• User Group Establishment?

• BIQ Verification and Certification Process ?

BIQ Consortium

David Katz, MBA – Project Manager

[email protected]

Page 19: Iibc Ahr Bit Jan242006

Intelligent Building Road Map(IBRP)

Guy Millaire

CABA Technical Director

Page 20: Iibc Ahr Bit Jan242006

Intelligent Buildings Roadmap(IBRM)

"The CABA Technology Roadmap for Intelligent Buildings is a well researched and written document that I promote as recommended reading for our people as well as architects, engineers and owners. It presents a solid portrait of the state of our industry and a clear vision of where we are headed." Terry Hoffmann, Johnson Controls (www.caba.org/trm)

• Technology Roadmap for Intelligent Buildings re-write.

Page 21: Iibc Ahr Bit Jan242006

Intelligent Buildings Roadmap(IBRM)

• Technology Roadmap for Intelligent Buildings (TRM) was written in 2002 and needs updating.

• Property of Federal Government and, unless involved in rewrite, TRM can only be used as reference to produce the IBRM.

• TRM focused on commercial, institutional and high-rise residential buildings and provided an in-depth examination of intelligent buildings technologies.

Page 22: Iibc Ahr Bit Jan242006

Intelligent Buildings RoadmapProject Plan Requirements

• Task Force for project scope definition.• Steering Cttee to contribute to & oversee the content of the report.• Sponsor(s) to fund the project:

– Governments, Research or Training Institutes.– Private enterprises.

• Contractor to conduct the research and produce the report.• IBRM project is projected to secure 10 contributors @$15K US = $150K.• Panduit Corp., CABA Board Member, already committed their share to

fund the project.

Page 23: Iibc Ahr Bit Jan242006

Intelligent Buildings RoadmapTimeTable (2006-07)

• Task Force to assist in IBRM scope def., Jan 31, 06.• Funding solution in place by Feb 28, 06.• Task Force to become IBRM Steering Cttee, Mar 10, 06• RFP to marketplace, Mar 15, 06.• Contractor selection, Apr 30, 06.• Industry input at CABA Intelligent Building Summit, June 26-26, 06.• Draft report, Sep 30, 06.• Final report approval, Nov 30, 06.• Publishing and distribution, Feb, 07.

Page 24: Iibc Ahr Bit Jan242006

Intelligent Buildings Roadmap(IBRM)

Questions:

Page 25: Iibc Ahr Bit Jan242006

Intelligent Building Demo

Demo Building NRC/IRC M20

Tom Lohner, VP TENG Solutions Inc.

Page 26: Iibc Ahr Bit Jan242006

Intelligent Building Demo (Project Concept)

• Show that an intelligent building can contribute to objectives of Kyoto Accord.

• Monitor the before and after bldg performance to establish a reference to quantify the savings.

• Provide the Government and Industry with a model to use in their efforts to improve building efficiency.

• Publish the findings for use as applied research reference for new construction.

Page 27: Iibc Ahr Bit Jan242006

Intelligent Building Demo (Project Update)

• TENG Solutions was contracted to conduct an analysis of the National Research Council/Institute for Research in Construction (NRC/IRC) Bldg M20.

• Report tabled and approved, Sep, 2005.• Some of the report recommendations will be

implemented in future NRC/IRC building retrofits.• NRC/IRC M20 retrofit project presently on hold

pending funding.

• Focus is now on Bldg M59, utilizing a unique private-sector energy services company (ESCo).

Page 28: Iibc Ahr Bit Jan242006

Intelligent Building Demo Project(Opened for Proposal)

• Public and private organizations are invited to take part in this project and offer an on-going retrofit initiative to serve as a model of intelligent buildings.

• CABA would continue to monitor, publish findings and inform the industry at large.

• CABA would also use its marketing position to promote the efforts being made towards intelligent buildings.

• More information: http://caba.infopop.cc/6/ubb.x

Page 29: Iibc Ahr Bit Jan242006

Intelligent Building Demo Project

Questions.

Suggestions.

Recommendations.