Upload
adnet-communications
View
1.112
Download
0
Embed Size (px)
Citation preview
CORPORATE PRESENTATION DECEMBER 2011 IPT TSX-V
CAUTIONARY DISCLAIMER
Except for historical information, this presentation may contain forward-looking statements. These
statements involve known and unknown risks, uncertainties, and other factors that may cause the
Company’s actual results, levels of activity, performance or achievements to be materially different from any
future results, levels of activity, performance or achievement expressed or implied by these forward-looking
statements.
The factors that could cause actual results to differ materially include, but are not limited to, the following:
general economic conditions; changes in financial markets; the impact of exchange rates; political
conditions and developments in countries in which the Company operates; changes in the supply, demand
and pricing of the metal commodities which the Company mines or hopes to find and successfully mine;
changes in regulatory requirements impacting the Company’s operations; the ability to properly and
efficiently staff the Company’s operations; the sufficiency of current working capital and the estimated cost
and availability of funding for the continued exploration and development of the Company’s exploration
properties.
This list is not exhaustive and these and other factors should be considered carefully, and readers should
not place undue reliance on the Company’s forward-looking statements. As a result of the foregoing and
other factors, no assurance can be given as to any such future results, levels of activity or achievements
and neither the Company nor any other person assumes responsibility for the accuracy and completeness
of these forward-looking statements.
George Gorzynski, P.Eng., a Qualified Person under the meaning of Canadian National Instrument 43-101,is
responsible for the technical information in this presentation.
2
PROJECT LOCATION
• Two Adjacent Mineral Districts: The 423 sq km Royal Mines of
Zacualpan & 200 sq km Mamatla Silver Districts are located in the
southern portion of the Mexican Silver Belt
3
PROJECT OVERVIEW
• 100% owned
623 km2 districts
• District production
began 1527
• 1975-2009 over
34 million Silver
equivalent ounces
produced
• 2,000+ old mine
workings in GIS
database
(July 2011)
4
SUMMARY OF EXISTING OPERATIONS Excellent
Mining
Environment
Existing Facilities
Proven Track
Record
• Modern power grid
• Paved highway access
• Abundant water supply
• Trained work force
• Three mines feed a central 500 tpd processing plant: currently at 427 tpd
• Have 200 tpd pilot plant for Capire mine expansion
• Took ownership in 2006 and been profitable annually ever since
• Silver production increased from cash flow by 209% from 2007-2010 with
low cost production (avg. $60 per tonne)
• Revenue per production tonne sold increased by 37% while direct costs
per tonne marginally increased by 15% (fiscal years 2008-2010)
5
• No environmental issues
• No security issues
• 3 hour drive from Mexico City
9 Months Ended
Sept 30th 2011 Dec 31st 2010 Dec 31st 2009 Dec 31st 2008
Silver Production (oz) 663,853 750,259* 823,571 645,668
Lead (t) 589 734 969 813
Zinc (t) 1000 1,212 1,098 1,053
Revenue per production tonne sold $207.70 $123.25 $109.51 $89.89
Direct cost per tonne produced $75.52 $63.29 $60.39 $54.80
*Silver production was marginally down 9% because the Company revised cut-off grades and mined
more medium grade ore because of high Silver prices during the fiscal year.
GUADALUPE 500 TPD
PROCESSING PLANT
6
• Continuing upgrades to optimize 500 tpd capacity
GROWTH STRATEGY
1. GUADALUPE MINING &
PROCESSING CENTRE • Main production area
2. CAPIRE MINING & PROCESSING
CENTRE • Next development project
• New open pit mine
3. HUATECOSCO GOLD & SILVER
EXPLORATION PROJECT • Expand on gold mineralization targets
4. SOUTHEAST EXPLORATION
PROJECT • Early stage exploration
7
Become a Multi-million Ounce Silver Producer With Multiple Production Centres
1
4 3
2
1. GUADALUPE MINE &
PROCESSING CENTRE
CHIVO MINE
• Flagship mine
SAN RAMON MINE
• High grade
epithermal silver
vein with recent
discovery of large
stockwork zone
NOCHE BUENA MINE
• Newest addition to
production profile,
commenced in April
2010
8
Three mines feed the 500 tpd Guadalupe Processing Plant
CHIVO MINE
• Chivo is IMPACT Silver’s flagship producing mine
• Discovered in late 2005, commenced production in November 2007
• Rapid mine development: production within 24 months
• High grade epithermal Silver vein with by-product Lead & Zinc
• Main producing mine
9
CHIVO MINE
Drilling Highlights
Drill Hole Est. TW (m) Ag (g/t) Ag (oz/t) Au (g/t) Zn (%) Pb (%)
Z08-13 1.9 3,902 114 1.34 3.96 2.16
Including 0.6 11,463 334 3.46 10.25 5.02
Z08-25 3.2 865 25 0.41 3.73 3.90
Including 1.6 1,765 51 0.81 6.42 7.56
Z08-11 3.2 793 23 0.21 4.23 3.27
Including 1.1 1,792 52 0.46 8.73 7.25
Scoop Tram hauling
ore from Chivo Mine CHIVO MINE
Drilling Highlights
Drill Hole Est. TW (m) Ag (g/t) Ag (oz/t) Au (g/t) Zn (%) Pb (%)
Z08-13 1.9 3,902 114 1.34 3.96 2.16
Including 0.6 11,463 334 3.46 10.25 5.02
Z08-25 3.2 865 25 0.41 3.73 3.90
Including 1.6 1,765 51 0.81 6.42 7.56
Z08-11 3.2 793 23 0.21 4.23 3.27
Including 1.1 1,792 52 0.46 8.73 7.25
SAN RAMON MINE
• San Ramon is located 1.3 km south of Chivo Mine
• High grade epithermal silver vein with historic grades of 5,000 g/t silver
in upper levels
• Restarted mining at San Ramon in 2008
• Expansion of production now starting based on discovery of 20m wide
stockwork zone on Level 5
10
San Ramon Mine Portal
NOCHE BUENA MINE
• Discovery hole drilled
in December 2008
• Initial production achieved in
March 2010
• Rapid development: production
within 15 months
• Open for expansion will goal to
become main producer
11
NOCHE BUENA SILVER ZONE
Drilling Highlights
Drill Hole True Width (m) Ag (g/t) Au (g/t)
Z09-43 3.2 1,078 0.5
Including 0.9 2,460 0.9
Z09-39 3.8 497 0.1
Z09-39 3.7 499 0.1
Including 2.9 618 0.1
Z09-27 4.0 368 0.3
Z09-20 4.6 280 0.3
Z09-12 4.0 319 2.0
Noche Buena Mine Portal
2. THE NEXT MINING DISTRICT -
CAPIRE VMS SUBDISTRICT
• Pilot Plant operations
planned for early 2012.
• Initial target ~300K oz
silver p.a.
• Development Plan for
full operating mine
targeting expanded
production pending
drilling program
results.
12
CAPIRE VMS SUBDISTRICT
• 100% owned;
200 km2 District
• NI 43-101 Mineral
Resource Estimate
on Capire Project
• Northeast quadrant
hosts gold and
silver veins
• Southeast quadrant
hosts veins and
VMS deposits
• Numerous drill
ready targets
13 Refer to Slide 4: Property Holdings Map.
NI 43-101 RESOURCE ESTIMATE
• 10,000m drilling program: 3,000m expansion and site preparation
drilling now begun
• Capire Deposit mineralization expanded to the north and southeast
zones
14
Metal Content for Capire + Aurora 1
Ag (oz) Au (oz) Cu (lbs) Pb (lbs) Zn (lbs)
Measured 3,529,969 14,146 3,389,275 18,234,678 46,140,820
Indicated 3,694,066 16,300 3,693,733 19,029,800 49,522,173
Measured & Indicated
7,224,035 30,446 7,083,007 37,264,478 95,662,993
Inferred 435,959 1,919 475,594 2,260,089 5,823,490
Summary Table Classified Mineral Resources – Measured + Indicated and Separate Inferred
Domain Classification Tonnes Ag (g/t) Au (g/t) Cu (%) Pb (%) Zn (%)
Capire Measured + Indicated 3,104,944 46.46 0.19 0.06 0.33 0.93
Aurora 1 Measured + Indicated 1,807,302 44.50 0.199 0.07 0.36 0.80
Grand Total Measured + Indicated 4,912,246 45.74 0.193 0.06 0.34 0.88
Grand Total Total Inferred 371,066 36.54 0.161 0.06 0.28 0.71
CAPIRE MINE DEVELOPMENT
PROJECT
DEVELOPMENT PLANS
• 2011: Mine planning/permitting, and 200 TPD Pilot Plant construction
• 2012: Initial estimated Silver production of 300,000 ounces and growing
Inhouse feasibility for expanded plant sizing
3D model of planned
Capire open pit
Area of Phase 2 drill
program
Area of defined NI43-101 Resources
Open for expansion
Open for expansion
3D SURFACE MODEL
Open for expansion
Proposed Tailings Facility
Planned Processing
Plant Site
3. HUATECOSCO GOLD & SILVER
PROJECT
• Carlos Pacheco was the first gold-copper target to be drilled
• Gold-Copper mineralization found in deeper parts of Silver vein system
• Drill program focused on more targets: Huatecosco Area
16
DRILLING HIGHLIGHTS
CARLOS PACHECO
Drill Hole True Width
(m)
Au
(g/t)
Ag
(g/t)
Cu
(%)
Zinc
(%)
Z08-68 2.9 19.6 68 0.29 0.11
Including 1.0 49.7 59 0.31 0.14
Z08-65 2.1 11.3 18 -- --
Including 1.2 18.8 24 -- --
HUATECOSCO
Z11-20 9.48 3.97 48.7 N/A 2.62
Including 4.24 6.96 84.3 N/A 5.11
Z11-17 4.74 3.44 117.6 N/A 0.81
EXPLORATION PROCESS
• Targets are generated by mapping and sampling of old workings
• Greatly expanded program of exploration drilling for 2011
17
Identify and
Map Old
Mines and
Workings
Phase 1 & 2
Drilling
Mine
Planning,
Permitting
and
Construction
Surface and
Underground
Sampling,
Detailed
Mapping
Production
More than
2,000
Mapped
250+
Prospects
•Golondrinas
•Huatecosco
•Pilarica
•Cruz Blanca
•Chivo
•San Ramon
•Noche
Buena
•Capire
•Santa Lucia
First Drill Hole to Production
12 – 24 Months
5 STAGE DEVELOPMENT PROCESS
ZACATECAS OPTION
Production
• 200 tpd processing plant and
10 mineral concessions optioned
to Defiance Silver Corp. (DEF.V)
for major shareholder position
and cash
• Historical production in district of
over 1 billion oz of Silver
Exploration
• Nueva Granada Mine
o Old mine dumps returned
100-400g/t silver
• Cristian Mine
o Samples from surface dumps
returned 310g/t Ag, 24% Pb, 8%
Zn
• San Pascual Mine
o Samples from surface dump
returned 875 g/t Ag
• Defiance Silver recently announced
nearby, near term production
acquisition
18
PROVEN LEADERSHIP
Frederick W. Davidson (CA) President, CEO & Director
Held senior management positions with Erickson Gold Mines Ltd. and TOTAL Energold Corp. Part of the
management team that took both the Erickson and Mt. Skukum Gold mines from discovery to production.
Currently President of Energold Drilling Corp. (EGD: TSX-V).
George A. Gorzynski (P.Eng) VP Exploration & Director
Director of Tirex Resources Ltd., Rupert Resources Ltd. and Consolidated Spire Ventures Ltd.
H. Walter Sellmer (P.Geo) Director
Held senior management positions with Amax Exploration, Canamax Resources and TOTAL Energold Corp.
Victor A. Tanaka (P.Geo) Director
Held senior positions with Teck Cominco, Asamera, Freeport McMoran, Aber Resources, Major General
Resources and Canarc. Participated in the discovery of Polaris and Sunrise Mines.
Richard J. Mazur (P. Geo, MBA) Director
Holds senior positions in Alto Ventures Ltd. and Forum Uranium Corp.
Peter Tredger (P. Eng, MBA) Director
Vice President of Thompson Creek Metals Company Inc. and held senior management positions at Glencairn
Gold Corp. and Wheaton River Mineral Ltd.
Jean-Pierre Boutin (MBA) Director
President and Money Manager in a private equity firm in Greenwich, Connecticut, former Treasurer of Xerox
Corporation, Emerging Markets.
19
BOARD OF DIRECTORS
PROFITABILITY
20
($C
DN
)
Year
Capital Expenditure Use Efficiency ($CDN)*
Total funds raised since start of
operations in January, 2006
Property payments, plant & equipment,
and exploration expenditures
Cash in the bank
$28 Million $38 Million $34 Million
**Estimated projection based on in house estimates
$(5,000,000)
$-
$5,000,000
$10,000,000
$15,000,000
$20,000,000
$25,000,000
$30,000,000
2006 2007 2008 2009 2010 2011
Revenue
Net Earnings
Operating Cash Flow
CORPORATE SUMMARY
• Recent share price: $1.75
• Market capitalization: $120 million
• Shares Outstanding: 69 Million (72 Million Fully Diluted)
• Long-Term Debt: Nil
• Energold Drilling (EGD: TSX.V) owns 6.87 Million shares
• Institutions hold 30% of shares outstanding
• Listings: TSX.V:IPT / Frankfurt: IKL / ISIN: CA45257A1021
21
Year Ended (‘000,000s $CDN except EPS)
9 Months Ended
Sept 30th 2011
Dec 31st
2010
Dec 31st
2009
Dec 31st
2008
Revenue $19.4 $16.7 $12.2 $8.9
Net Earnings $6.9 $3.4 $1.6 $.66
Cash Flow from Operations $9.1 $5.6 $4.4 $1.7
Cash & Cash Equivalents $32.6 $18.7 $5.3 $5.4
EPS $0.11 $0.07 $0.02 $0.01
SHARE PRICE PERFORMANCE – 1 YEAR
LONG TERM GROWTH STRATEGY
1. GUADALUPE MINING &
PROCESSING CENTRE • Now operating; fed by 3 mines ~ 1 million oz.
silver eq. p.a.
• Exploration on potential new mine targets
2. CAPIRE MINING & PROCESSING
CENTRE • Pilot Plant operations planned for early 2012.
• Initial target ~300K oz silver p.a.
• Development Plan for full operating mine to
targeting expanded production pending drilling
program results
3. NOCHE BUENA MINING &
PROCESSING CENTRE • First mine began production in April 2010; at
present ore sent to Guadalupe plant
• Exploring gold as well as silver potential here
4. SOUTHEAST MINING &
PROCESSING CENTRE • Future exploration - many historic mine
workings.
23
Become a Multi-million Ounce Silver Producer With Multiple Production Centres
1
4
3
2
PLANS FOR 2011
• Ramp up Zacualpan production to 500 tpd with expanded production
from Noche Buena Mine and San Ramon (COMPLETED)
• Place Capire Mine into production initially on a 200 tpd pilot plant basis
• Recent $15 million financing will allow accelerated growth through
expanded exploration and potential acquisitions
• Continue implementing long term vision of multiple processing plants
throughout the districts each fed by multiple mines
24
For more information please contact us via
Phone:604-681-0172
Email: [email protected]
PLANS FOR 2011
• Ramp up Zacualpan production to 500 tpd with expanded production
from Noche Buena Mine and San Ramon (COMPLETED)
• Commence construction at the Capire Mine prior to putting into
production in early 2012 on an initial 200 tpd pilot plant basis
• Recent $15 million financing will allow accelerated growth through
expanded exploration and potential acquisitions
• Expand exploration at Huatecosco Project and Oscar Project
• Continue implementing long term vision of multiple processing plants
throughout the districts each fed by multiple mines