5
INCHEON TECHNOPARK NET ZERO CITIES CONFERENCE, 2013 Location : Incheon Metropolitan City 2.8million 30km west of Seoul & 20minutes from Incheon International Airport Incheon Int’l Airport Incheon Seaport

Incheon technopark wontack suh-3 minute icn power point template for all

Embed Size (px)

Citation preview

Page 1: Incheon technopark wontack suh-3 minute icn power point template for all

INCHEON TECHNOPARKNET ZERO CITIES CONFERENCE, 2013

Location : Incheon Metropolitan City 2.8million 30km west of Seoul & 20minutes from Incheon International Airport

Incheon Int’l Airport Incheon Seaport

Page 2: Incheon technopark wontack suh-3 minute icn power point template for all

INCHEON TECHNOPARKNET ZERO CITIES CONFERENCE, 2013

• Cleantech based on Mechatronics, Automobile and IT

• Focusing Areas are - Material Recycling, Rare Metal Care - Electric Car (Eco Mobility) - Bio Mass and Waste Treatment - Smart Grid (Electric Measurement and Electric Charging System • Number of cleantech companies in

the region : N/A • Number of cleantech employees in

the region : N/A Enterprises in Industrial Complex inCapital Region : 35,100

Page 3: Incheon technopark wontack suh-3 minute icn power point template for all

ENTER NAME OF CLUSTER HERENET ZERO CITIES CONFERENCE, 2013

KEY PROJECT FOR 2014

1. Incheon International Cleantech Conference

- 2nd Conference : April 2013 Focus on Cleantech, Participate from CCC(Denmark), Yixing (China) Thailand, Vietnam and Korea - 3rd Conference : April 2014 Focus on Cleantech, Plan to Invite ICN Members

2. Technology Matching Event and Tech Fair in cooperation with ICN Members

- July and September, 2014

International Collaboration

Domestic Collaboration

ITP connect to and from abroad in coroperation with 17Technoparks in Korea

Page 4: Incheon technopark wontack suh-3 minute icn power point template for all

APRIL 15, 2023PRESENTATION #X

Success StorySuccess Story

Performance Development Steps

Project Planning

IMT R&DFunding

InternationalGovernment Project

Promote Plant Exports

ParticipantsSongdo TP CompanyExperts

Incheon FirmSeoul Firm

Incheon FirmMalaysian Firm

Domestic and Overseas Firms

5M won 300M won 1.35B won 20B won

2010 2011 2012~13 2014

Project Name: Solid Bio-Fuel Production System Development Using Real Time Moisture Content Measurement and Control of Organic Waste

Period: July 1, 2010 ~ April 30, 2012

Accomplishment: Funded 300M won for IMT R&D project support in the 1st year.Jointly operated the project with Iwon Technology in Seoul in the 2nd year.Based on results, 1.35B won funding from the International R&D Project hosted by the Korean Institute of Energy Technology Evaluation and PlanningAchieved overseas technology cooperation promoting 20B won plant exports to Malaysia- Filed 2 patents and hired 1 employee during the project period

Page 5: Incheon technopark wontack suh-3 minute icn power point template for all

APRIL 15, 2023PRESENTATION #X

* 83 million tons/year FFB -> EPB -> 5,500Kcal/kg

FFB, Fresh Fruit Bunch -> 25% of EPB (Empty Fruit Bunch)