Project NameData Center Cooling UnitChange-Out
Project Location
Atlanta, Georgia
Project TeamOwner: GlobalBeverage ProviderContractor: McKenney’s, Inc.
Mission Critical
Specializations
Markets
Energy Management
Pipe Shop Prefab
Sheet Metal Shop Prefab
McKenney’s installed multiple replacement air cooling units at a large Atlanta data center that remained operational during the course of the project.
The ChallengeMcKenney’s had to install one new air cooling unit per day at a data center that handles global accounts and has no tolerance for downtime. Detailed provisions were necessary to shut down and remove old units—and install new ones—without disrupting cooling in the massive server room.
The SolutionThe McKenney’s team carefully planned each step, working long hours to stage installation in sequence so operating units would remainonline while each one was being replaced. The structure of the raised floors were modified to supported the unit transfers; removingeach old unit and stabilizing the floor for the next new unit. McKenney’s also rerouted the ductwork without shutting down the servers.
The content of this document is not intended as an endorsement.
The ResultsAll units were operational on schedule with no data center downtime. For another more complicated data center—where space is even more restricted—the customer has requested that the same McKenney’s team perform the work.