Presentation by Andreas Krenn, Energiwerkstatt at Winterwind 2012, session 5a. "Intelligent load control for heated wind measurement sensors"
Citation preview
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Intelligent load control for heated wind measurement sensors
A. Krenn1, H. Winkelmeier1, F. Lachinger1
1Energiewerkstatt, Friedburg, Austria
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Wind Energy
• Wind Measurement
• Project Development
• Planning & Implementation
• Training and Education
• Research & Demonstration
Company Profile
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
01 Wind Energy in Austria
02 Test Rig Schareck / Großglockner
03 Wind Measurement Brenner
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Wind Energy in Austria State 31.12.2011
• 650 Wind turbines • 1.084 MW installed power • 2,39 TWh electricity generation per year • 3,6 % of Austrian electricity demand
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
• 10 •
• 4
• • • •
• 5 • • • • • • • • 3 • • •
• •
• • •
• 7 • •
• • • •
• 4 • 4
•
• • • •
•
• • • 7 •
•
• • •
• • •
• • •
•
• •
3
•
• 3
• • • • • •
• 3
• •
•
4
V med 6,5 – 7,0 m/s
V med 6,0 - 7,5 m/s
V med 5,5 – 6,5 m/s
V med 5,5 - 6,0 m/s
Wind conditions in Austria
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Specific wind energy production in Austria Specific wind energy production in different regions of Austria
750 84
3
863
812 90
0
907
798
410 50
1
460 499 60
2
525
47561
4 686 73
5
639 74
5
660
665
910 10
42
990
861 96
1
915 10
10
0
200
400
600
800
1000
1200
2003 2004 2005 2006 2007 2008 2009
[kW
h/m²]
Eastern Region (106 WT) Northern Region (14 WT) Pre-Alpine Region (23 WT) Alps (13 WT)
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
01 Wind Energy in Austria
02 Test Rig Schareck / Großglockner
03 Wind Measurement Brenner
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Test Rig Schareck
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Measurement setup
Producer Type Operating mode Power [W]
NRG Ice Free 3 Heated cup anemometer 96 W
Vaisala WAA252 Heated cup anemometer 72 W
Thies A. 2D Heated 2D Ultrasonic 310 W
Thies A. 2D Compact Heated 2D Ultrasonic compact 250 W
Thies A. Classic Unheated cup anemometer -‐-‐-‐-‐-‐
Thies A. Classic Wind vane 25 W
Galltek P63-‐12 Combined Thermo-‐/Hygrosensor -‐-‐-‐-‐-‐
Mobotix M12 Dual Night Webcam with infrared spotlight -‐-‐-‐-‐-‐
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Data evaluation
Comparison of five different scenarios rsp. icing periods: • Actual meteorological icing periods based on webcam evaluations
• Actual instrumental icing periods based on webcam evaluations
• Estimated icing periods according to synoptic considerations • Estimated icing periods according to comparison of heated and
unheated anemometers
• Estimated icing periods according to standard algorithms of heated wind measurement sensors
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Resulting Energy Demand
Scenario Solution regarding heating control Used settings Energy Consumption
1 Standard sensor algorithm ≤ 2°C 100%
2 Comparison heated/unheated sensor ∆vmed > 2 m/s 29%
3 Relative humidity und temperature ≥ 90%; ≤ 1°C 55%
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Considerations regarding heating demand
• Theoretically, heating of wind measurement sensors is only necessary during meteorological icing periods
• In case of external power supply units – Which energy consumption do we have? – How much energy is available? – Which data availability do I want to achieve?
• Importance of an advanced load control management
• Possible approaches: – Info from webcam, difference betw. heated and unh. sensor not available – Synoptic considerations (equivalent to meteorological icing)
• Overestimation of icing periods, but still ~ 50% saving of energy
– In future - ice detector: current obstacles (350 W heating demand, costs)
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
01 Wind Energy in Austria
02 Test Rig Schareck / Großglockner
03 Wind Measurement Brenner
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Wind farm Brenner • 2.100 – 2.200m above sea level • 600 W/m2 at hub height (estimated)
• 40 days per year icing (estimated)
• 19 Wind turbines approved (LTW70 – 2.0 MW)
Wind Farm Brenner
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Windmessung Steinjoch - 50 m
LIDAR 01 - Steinjoch
LIDAR 02 - Kreuzjoch
LIDAR 03 - Sattelberg
Measurement concept
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Wind measurement mast Steinjoch
Energiewerkstatt offered: 50m Mast with heated ultrasonic anemometer
External power supply system; 97% data availability
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Power demand Ultrasonic: 250 W (periodically) Power demand LIDAR: 40 W (100 W) (continuously) Technical specification: PV generator: 4 x 180 W Wind generator: 2,40 m diameter / 900 W Fuel cell: 300 W (as backup) Hydrogen store: 6 bottles à 50 litres Battery storage: 600 Ah / c100 Data storage: Ammonit Meteo 32 Dimensions: 1.10 / 2.20 / 1.80 Operat. control: EMS Energy
management system
External power supply system
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Controlling of the system • Load management: Managing the
power demand of the sensors according to the actual conditions
• Production management: Intelligent interplay of the components
• Thermal management: Intelligent provision of the required thermal conditions (for battery pack and fuel cell)
• Provision of a remote control system, which allows permanent control and a remote changing of the settings
Energy management system
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Experience from first months
Extreme conditions • Mean wind speed: 12 m/s in 23 m height • Wind gusts (10min mean): > 30 m/s • Ice accretion: Up to 8 cm (all-round)
Evaluation of 1 ½ months • Surplus of ~30% • No demand for FC (only self consumption) • Data availability of ~97%
Intelligent load control for heated wind measurement sensors
Winterwind 2012, Skellefteå/SE
Intelligent load control for heated wind measurement sensors
Thanks for your attention!