London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Temporary Jumbo Stud Partition to Segregate Boxing and Fencing
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Clients Brief Build a huge temporary Jumbo Stud Partition wall for the London 2012 Olympic Games in the ExCel Exhibition Centre, Docklands London to segregate the Fencing from the Boxing.
The Partition to be 88m long x 10.2m (approx 900m2) high which required a 1 hour fire rating and painting with 2 x coats of white emulsion paint in only 7 days!!
The owners of the ExCel Exhibition Centre said we were NOT to make any holes in the exhibition halls what so ever which engaged the PJS Solutions technical expertise.
In addition the partition had to come down as if it had never been there in 4 days.
Solution PJS Solution’s “F60S” Partition System
System details on PJS Solutions website: “Click this link”
The Completed Partition This wall built and painted in 7 days, in the picture you can see the Fencing being set up for the London 2012 Olympic Games
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Planning / Preparation PJS Solutions technical team carried out the structural calculations for this partition design along with providing details of securing the partition at the base and head without making any holes in the building
Base Fixing Solution
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Head Fixing Solution
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Services Detailing / Solution
Services Detailing / Solution (Cont’d)
Services Detailing / Solution (Cont’d)
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Structural Calculations
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Programme & Method of Working
Programme & Method of Working (Cont’d)
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Starting Works
Material deliveries on the first day:
• 1 x lorry load of 200mm wide metal stud “C” sections & 204mm deep channel.
• 1 x 26 tonne articulated lorry load of 12.5mm Fermacell board.
• 1 x articulated lorry load of RS45 75mm Knauf Rock Universal Slab.
Stage 2 of Works
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Stage 3 of Works
Stage 4 of Works
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Stage 5 of Works
Stage 6 of Works
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Stage 7 of Works
Stage 8 of Works
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Build Sequence: 1. First morning James of PJS Solutions received the deliveries and inducted 14 x PJS Solution
operatives
2. The 204mm x 70mm floor channels (10m lengths) were locked into specially designed metal floor shoes which in turn were placed into the 92 wheel slots in the run of the partition.
3. The head of the partition was specially designed to fit around the existing “sliding Excel panel wall” head section incorporating machined timbers which slotted either side. The partition head channel was fixed up through into the timbers.
4. The 200mm by 10.200m long 70mm deep studs were hoisted into the partition one at a time and fixed at the top for H&S reasons.
5. 12.5mm square edge Fermacell boards were laser leveled in and screw fixed to the metal studs using Fermacell joint stick on all board perimeters.
6. RS45 75mm Knauf Rock Universal Slab was installed in the void.
7. Once the Fermacell boarding had been completed Fermacell fine Surface treatment was applied to the Fermacell boards ready for decoration.
8. To apply the 2 x coats of emulsion we used 2 industrial paint sprayers.
Removing the Wall
In September just after the Paralympics games were over we were given 4 days to take the wall down and recycled every last piece.
1,200 pieces of insulation.
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
6.5 tonnes of steel
26 tonnes of Fermacell recycled by Arrow Gypsum Recycling,
PJS Solutions left the Exhibition Halls as we found them; spotless.
London 2012 Olympic Games
PJS Solutions Limited Tel: 01425 472748 Unit 22, Sandleheath Industrial Estate Fax: 0872 331 5137
Fordingbridge, Hampshire. SP6 1PA E-Mail: [email protected]
Company No. 06262981 Website: www.pjssolutions.co.uk
High Bay Industrial Walling Solutions up to 26m high
Overall the project experience was very good and PJS Solutions are proud to be part of the London 2012 Olympics Build.