Page 1: NGI-Permit to Work

NGINGI Training Center

WelcomeWelcomesafety coursesafety course

Page 2: NGI-Permit to Work

PermitPermit : The formal written and authorising document: : The formal written and authorising document:

• approved by management, approved by management,

• describing the work to be carried ondescribing the work to be carried on

• identifying the potential hazards or interacting identifying the potential hazards or interacting activities that can take placeactivities that can take place

• specifying the requirement, precautions requested to specifying the requirement, precautions requested to work in safe conditionwork in safe condition

PermitPermit : The formal written and authorising document: : The formal written and authorising document:

• approved by management, approved by management,

• describing the work to be carried ondescribing the work to be carried on

• identifying the potential hazards or interacting identifying the potential hazards or interacting activities that can take placeactivities that can take place

• specifying the requirement, precautions requested to specifying the requirement, precautions requested to work in safe conditionwork in safe condition

DefinitionDefinitionDefinitionDefinition

Page 3: NGI-Permit to Work

PurposePurposePurposePurpose

To ensure:To ensure:

All work activities, hazards and precautions are All work activities, hazards and precautions are defined prior to the execution of the workdefined prior to the execution of the workproper planning and consideration proper planning and consideration communication between installation management, communication between installation management, supervisors and operators and those who carry out the supervisors and operators and those who carry out the work.work.Monitoring and auditing to ensure safe system of Monitoring and auditing to ensure safe system of works.works.

To ensure:To ensure:

All work activities, hazards and precautions are All work activities, hazards and precautions are defined prior to the execution of the workdefined prior to the execution of the workproper planning and consideration proper planning and consideration communication between installation management, communication between installation management, supervisors and operators and those who carry out the supervisors and operators and those who carry out the work.work.Monitoring and auditing to ensure safe system of Monitoring and auditing to ensure safe system of works.works.

Page 4: NGI-Permit to Work

Permit isPermit is Written-Legal Written-Legal Document defining a Safe Document defining a Safe System of Work.System of Work.

Remember :Remember :This is a This is a legal documentlegal document..

When you sign it,When you sign it,you can be held responsibleyou can be held responsible

if something goes wrongif something goes wrong

Page 5: NGI-Permit to Work

Mis-conception that the PTW system should control Mis-conception that the PTW system should control allall of of the work carried out at a facility can lead to an overload of the work carried out at a facility can lead to an overload of the PTW system, which prevents proper attention given to the PTW system, which prevents proper attention given to activities with a higher hazard potential.activities with a higher hazard potential.

1.1. PTW is appropriate to non-routine activities which may PTW is appropriate to non-routine activities which may require some form of Job Safety Analysis prior to work require some form of Job Safety Analysis prior to work commencing.commencing.

2.2. PTW is required for Maintenance work carried out by plant PTW is required for Maintenance work carried out by plant operators.operators.

3.3. Use a PTW when two or more groups of people (different Use a PTW when two or more groups of people (different trades), need to co-ordinate their activities to ensure that trades), need to co-ordinate their activities to ensure that their work is completed safely. their work is completed safely.

What work What work requiresrequires Permit? Permit?

Page 6: NGI-Permit to Work

RoutineRoutine Maintenance and production plant Maintenance and production plant operations; all carried out in accordance with site operations; all carried out in accordance with site approved proceduresapproved procedures

Where this is identified on fixed lists approved by Where this is identified on fixed lists approved by TIJD Commissioning ManagerTIJD Commissioning Manager

If it is carried out in an area specified on an If it is carried out in an area specified on an installation layout drawing, approved by TIJD installation layout drawing, approved by TIJD Commissioning ManagerCommissioning Manager

Visual inspection of areas (except in confined Visual inspection of areas (except in confined spaces). spaces).

Work Work NotNot require require a Permit a Permit

Page 7: NGI-Permit to Work

Types of Types of MainMain Permit Permit Types of Types of MainMain Permit Permit

Hot Work: spark / ignition potential

Hot Work: spark / ignition potential

Naked Flame: Welding, Burning,

Grinding etc.

Naked Flame: Welding, Burning,

Grinding etc.

Cold Work: no spark / ignition potential

Cold Work: no spark / ignition potential

Page 8: NGI-Permit to Work

Any work involving equipment giving rise to a Any work involving equipment giving rise to a DefiniteDefinite source of ignition, such as: source of ignition, such as:

use of equipment for oxy-acetylene burning,use of equipment for oxy-acetylene burning,

gas welding, electric-arc welding,gas welding, electric-arc welding,

propane torch heating and burning,propane torch heating and burning,

grinding or use of a hot-air gun.grinding or use of a hot-air gun.

What is a What is a Hot (Naked Flame)Hot (Naked Flame) Work Work??

Page 9: NGI-Permit to Work

Any work involving, or giving rise to, a Any work involving, or giving rise to, a PotentialPotential source of ignition, such as:source of ignition, such as:Grit-blasting Grit-blasting

Work on non-intrinsically safe equipmentWork on non-intrinsically safe equipment

Using non-certified electrical equipment not Using non-certified electrical equipment not controlled by an Electrical Permit (e.g. Avometer, controlled by an Electrical Permit (e.g. Avometer, power tools etc)power tools etc)

Spray paintingSpray painting

Use of Camera with flash Use of Camera with flash

What is a What is a HotHot Work Work??

Page 10: NGI-Permit to Work

What is a What is a ColdCold Work Work??Cold Work-Cold Work- Any task, or the use of any tool or equipment that will Any task, or the use of any tool or equipment that will

notnot produce a source of ignition. Such as: produce a source of ignition. Such as:

use of tools for erection, dismantling and cleaning, which use of tools for erection, dismantling and cleaning, which are not liable to produce sparks,are not liable to produce sparks,Pressure testing of plant and equipmentPressure testing of plant and equipmentDisconnection or opening up of any closed pipeline or Disconnection or opening up of any closed pipeline or vesselvesselSpading and de-spading of hydrocarbon lineSpading and de-spading of hydrocarbon lineChemical cleaningChemical cleaningHandling of hazardous substances, e.g. radioactive Handling of hazardous substances, e.g. radioactive source, toxic / corrosive chemicals, asbestos, etcsource, toxic / corrosive chemicals, asbestos, etc

Page 11: NGI-Permit to Work

ValiditValidityy

Hot Work, Naked Flame and Cold Work Main Permits, all have same validity period.

Hot Work, Naked Flame and Cold Work Main Permits, all have same validity period.

7 Consequent SHIFTS or 7 Days

Maximum!

Page 12: NGI-Permit to Work

PTW ProcedurePTW ProcedureINITIATION / PREPARATION OF PERMIT

TO WORK

LIST OF EXTERNAL REQUIREMENTS SUCH AS: SAFETY EQUIPMENT, STATUS

OF PLANT, NEED FOR COMPLEMENTARY PERMITS ETC.

PERMIT AUTHORISATION, ISSUE AND ACCEPTANCE FOR WORK TO START

REVALIDATION AT THE START OF EACH SHIFT

PERMIT CANCELLATION ON COMPLETION OF WORK

Page 13: NGI-Permit to Work

Safety Authority

Installation Authority (Area Commissioning Manager)

Task Supervisor

PermitPermit is Signed by is Signed by Responsible PersonnelResponsible Personnel

Permit Controller

Area Authority

Page 14: NGI-Permit to Work

PTW Procedure Definitions and DutiesPTW Procedure Definitions and Duties PTW Procedure

DefinitionDuties

ResponsiblePerson

Task SupervisorInitiates permits.Defines scope of work.

Person responsible for the work

Safety AuthorityDefines safety requirements.Monitors working practices.

Area HSE Manager

Installation AuthorityAuthorises work go-ahead.Defines plant status for work.

Area Commissioning Manager

Area AuthorityArranges any required isolations.Approves work go ahead.

Commissioning Shift Supervisor

Permit Controller

Checking of permits before issue.Administration of PTW Procedure.Logging / Filing of cancelled and/or suspended permits.Ensures no conflict of work between different area

authorities.

Permit Controller

Authorised Gas Tester Performs all required gas testing.Senior HSE SVCommissioning SV

Senior Panel OperatorPerforms inhibits and enables on Fire and Gas and ESD

systems.Senior Panel Operator

Page 15: NGI-Permit to Work

PTW Signatory DefinitionPTW Signatory DefinitionTask Supervisor

1. Initiates Permit ( signs box 1 )

2. Defines the scope of work

3. Accepts Permit ( signs box 8 )

4. Ensuring that all work described on Main Permits and Complementary Permits is completed, or left in a safe and tidy condition if not completed

5. Hands back Permit at end of shift and revalid for next shift ( signs box 8 )

6. Ensures closure of Permit at end of task ( signs box 9 )

Page 16: NGI-Permit to Work

TIJD

Modification of support (need grinding)

8

X

Mr. Akbari30 July 2006

Unit 122 Electrical Heater EH-101

X

X

Page 17: NGI-Permit to Work

To all Task SupervisorsWhen you send someone to the Permit Office to have a permit signed,please ensure:

1. They understand what the permit is requesting. The Permit Authority may have questions about the job description or location.

2. They understand and speak English. Most Permit Authorities speak only English and they may want to communicate with the person you send

3. Please print clearly all information on job description, location and equipment requirements with CAPITAL LETTERS, If the writing is not clear, the permit will be rejected and you have to start all over again

Page 18: NGI-Permit to Work

PTW Procedure PTW Procedure TIMETABLE

New permit applications have to be at the Permit Office beforebefore 12:0012:00 on the day beforeday before work is required to start.

At 06:3006:30 the following day your permit shall be ready for collection from the Permit Office.

If a permit requires revalidation for night shift working then it must be at the Permit Office by 16:3016:30

Dayshift permits must be at the Permit Office by 17:0017:00 or they shall not be revalidated for the following day.

Page 19: NGI-Permit to Work

Safety AuthoritySafety Authority

1. Details additional PPE required, plus any other safety precautions to be taken, including gas tests

2. periodic checks at work sites, to ensure compliance with conditions and safe working practices specified in Main Permits and Complementary Permits.

( signs box 2 )

PTW Signatory DefinitionPTW Signatory Definition

Page 20: NGI-Permit to Work

X

Eshghi XXXXXXXX 30 July 2006 1730 h

X

X

X

X

Page 21: NGI-Permit to Work

Nominated Area Safety Authorities1. C4A / C4B Area Safety Manager

Mr. Sanoobari

2. C5/C6 and ETU Area Safety Manager

Mr. Eshghi

PTW Signatory DefinitionPTW Signatory Definition

Page 22: NGI-Permit to Work

Gas test should be written at the back side of white copyGas test should be written at the back side of white copy

Page 23: NGI-Permit to Work

PTW Signatory DefinitionPTW Signatory Definition

Installation Authorities

1. Evaluation of intended work2. Ensuring proper authorisation, issue and

cancellation of all Main Permits in their areas3. Planning, coordinating and authorising all Hot

Work (Naked Flame) Permits (not more than ONE Naked flame permit per designated area.

Page 24: NGI-Permit to Work

Nominated Installation Authorities1. C4A / C4B Area Commissioning Manager

Mr.

2. C5/C6 and ETU Area Commissioning Manager

Mr.

PTW Signatory DefinitionPTW Signatory Definition

( signs box 3 )

Page 25: NGI-Permit to Work

PTW Signatory DefinitionPTW Signatory DefinitionArea Authorities

1. Arranging for any required Electrical or Process / Mechanical Isolations.

2. Delegating the issue and cancellation Complementary Permits

3. Periodic checks of work sites are performed to ensure compliance with conditions specified in Main Permits and any Complementary Permits.

Page 26: NGI-Permit to Work

Nominated Area Authorities

C4A / C4B Areas Commissioning Shift Supervisors

Mr.

2. C5/C6 and ETU Commissioning Shift Supervisors

Mr.

( completes box 3,4,5,6 & 9)

PTW Signatory DefinitionPTW Signatory Definition

Page 27: NGI-Permit to Work

FirstFirst

ThenThen

Page 28: NGI-Permit to Work

SECTION 3To All Area AuthoritiesArea Authorities :

• When you sign in box 3, you are signing that the requirements to carry out work safely have been done. If you have not physically checked these requirements, DODO NOT SIGN !NOT SIGN ! If someone is hurt or killed due to improper compliance with requirements, you may be held responsible. This could mean criminal charges are filed against you.

• Do not sign as the Installation AuthorityInstallation Authority unless you have written permission / instruction to do so formalized

delegation of authority).

Page 29: NGI-Permit to Work

FirstFirst

ThenThen

Page 30: NGI-Permit to Work

Complementary Permits to be attached by Complementary Permits to be attached by originator and must be confirmed by Area originator and must be confirmed by Area Authority Authority

Page 31: NGI-Permit to Work

Area Authority allows final authorization and Area Authority allows final authorization and Permit Controller will check all Items(1-6), then Permit Controller will check all Items(1-6), then sign and issue the permitsign and issue the permit

Page 32: NGI-Permit to Work

Permit must be handover at the start of Permit must be handover at the start of each shift and shall be hand back at the each shift and shall be hand back at the end of the shiftend of the shift

Page 33: NGI-Permit to Work

DISTRIBUTION

• Copy 1, kept at the work site, on display, for duration of activity

• Copy 2, with Safety Authority form checking of continuous compliance

• Copy 3, in Permit Office

• Copy 4, with Area Authority for checking of continuous compliance

Page 34: NGI-Permit to Work

At the end of the job the work area must be At the end of the job the work area must be left in safe position and permit should be left in safe position and permit should be cancelledcancelled

Page 35: NGI-Permit to Work

Issued with HotHot / ColdCold Work Permit, depending on ongoing work

Issued with HotHot / ColdCold Work Permit, depending on ongoing work

Complementary PermitsComplementary PermitsComplementary PermitsComplementary Permits

Page 36: NGI-Permit to Work

Type of Complementary PTWType of Complementary PTW

1. Entry to Confined Spaces2. Radiography3. Excavation4. Process / Mechanical Isolation5. HV Electrical Isolation 6. LV Electrical Isolation7. Sanction for Test8. Limitation of Access

Page 37: NGI-Permit to Work

Radiography and Confined Radiography and Confined Space Entry Space Entry

Complementary Permits areComplementary Permits arevalid for valid for one shift only!one shift only!

New Permit required each New Permit required each day day

Radiography and Confined Radiography and Confined Space Entry Space Entry

Complementary Permits areComplementary Permits arevalid for valid for one shift only!one shift only!

New Permit required each New Permit required each day day

Page 38: NGI-Permit to Work

Process / Mechanical IsolationProcess / Mechanical Isolation

This Complementary Permit is required to This Complementary Permit is required to withdraw equipment from service by withdraw equipment from service by physical isolation, usually by valve. physical isolation, usually by valve.

Isolation Certificate:Isolation Certificate:

Combines in one document record Combines in one document record of all isolation required for a task to of all isolation required for a task to be carried out safely. The control be carried out safely. The control and use of isolation certificate are and use of isolation certificate are described in `the permit to work described in `the permit to work procedureprocedure..

Page 39: NGI-Permit to Work

Are Valid as far as the Are Valid as far as the isolation is implemented isolation is implemented without limit of duration.without limit of duration.

Are Valid as far as the Are Valid as far as the isolation is implemented isolation is implemented without limit of duration.without limit of duration.

ISOLATION CERTIFICATEISOLATION CERTIFICATE

Page 40: NGI-Permit to Work

ISOLATION CERTIFICATEISOLATION CERTIFICATE

Certificates are Not Certificates are Not Permits!! Permits!!

They are Added to They are Added to Permit to Confirm Permit to Confirm

Isolation status of an Isolation status of an EquipmentEquipment

Certificates are Not Certificates are Not Permits!! Permits!!

They are Added to They are Added to Permit to Confirm Permit to Confirm

Isolation status of an Isolation status of an EquipmentEquipment

Page 41: NGI-Permit to Work

High Voltage Electrical IsolationHigh Voltage Electrical Isolation

This Complementary Permit is required for all This Complementary Permit is required for all isolation work on electrical systems or isolation work on electrical systems or equipment where the voltage exceeds the equipment where the voltage exceeds the following limits:following limits:

1000 volts AC or 1500 volts DC between 1000 volts AC or 1500 volts DC between conductors.conductors.

600 volts AC or 900 volts DC between 600 volts AC or 900 volts DC between conductors and earth.conductors and earth.

Any situation except above condition will be Any situation except above condition will be covered under covered under Low Voltage Electrical IsolationLow Voltage Electrical Isolation PermitPermit

Page 42: NGI-Permit to Work

Sanction for TestSanction for Test

This Complementary Permit is required to test This Complementary Permit is required to test individual or multi-discipline items of individual or multi-discipline items of

equipment. It allows for temporary removal equipment. It allows for temporary removal of safety isolations and the provision of of safety isolations and the provision of

temporary actions to override or remove temporary actions to override or remove equipment to carry out such tests.equipment to carry out such tests.

Page 43: NGI-Permit to Work

Limitation of AccessLimitation of Access

This Complementary Permit is required to This Complementary Permit is required to work in any area close to live electrical work in any area close to live electrical systems or equipment. A Limitation of systems or equipment. A Limitation of

Access Permit is not required where the Access Permit is not required where the work to be performed is already covered by work to be performed is already covered by any of the other Main Permits. All Limitation any of the other Main Permits. All Limitation

of Access permits shall be authorised by of Access permits shall be authorised by electrical authorised personselectrical authorised persons

Page 44: NGI-Permit to Work

PTW is all aboutPTW is all aboutPlanning the tasksPlanning the tasks

Responsibilities (Responsibilities (Authorisation SupervisionAuthorisation Supervision))

Understanding jobsUnderstanding jobs

Hazards and Control MeasuresHazards and Control Measures

CommunicationCommunication

BriefingBriefing

ImplementationImplementation

VerificationVerification

Page 45: NGI-Permit to Work