Page 1: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan
Page 2: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

Page 3: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

Predictive Costing with BetterVuPlan for future cost and capacity levels with ABC using Anaplan

Page 4: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

Mitch MaxPartner

Page 5: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

App HubActivity Based Costing

Predictive Labor ModelingWorkforce Capacity Planning

for InsuranceAgile Planning

Focused on Financial and Operational Planning using Anaplan

Based in Toronto and New YorkSpecializing in Financial Services, Healthcare, Manufacturing / Distribution20+ years’ experience in ABC and Capacity ModellingGrowing team of dedicated Anaplan expertsLibrary of advanced apps on Anaplan’s App Hub

Page 6: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

Agenda

The Value of ABC Predictive Costing

Examples – Using the BetterVu App

Page 7: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

The Value of Activity-Based Costing

Proven Methods, New Tools

Page 8: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Traditional ABC Use Cases

Product / Service Unit Costing

Profitability by Customer,

Product, Channel

AllocationsCapacity Analysis

What does it cost to do … for ...?

Which are my most / worst

profitable customers?

What can I do?

How do I assign common costs to

products, departments or

Lines of Business?

Do I have the right number of staff to current

and planned demand?

Page 9: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Customer Profitability

90% of profit from

20% of customers

Top Customer

Bottom Customer

Page 10: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Product Profitability

Page 11: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Capacity Analysis

Requires Time-Based ABC

Page 12: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

ABC Methodologies

Page 13: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Why the bad rap?Perfection Bias

Big / Costly / Lengthy projects

Black Box: distrust of broad allocation methods

Lack of Integration

Lack of transparency / action

Page 14: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Key Drivers of SuccessImmediacy

Transparency

Connectivity

Customization

Speed of Deployment

Page 15: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

Integrated ABC

Extending ABC into Predictive Analytics

Page 16: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Predictive ABC Use Cases

Cost Forecasting Workforce Planning

Strategic PlanningPricing

Volume Projection /

Trends

Driver-Based Analysis

Page 17: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

1. Plan Capacity First

2. Plan other resources based on other drivers/methods

3. Forecast costs based on resource needs

Page 18: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

The Core: Workforce Capacity Planning

Business Volumes

ServiceVolumes

Time Standards

Required Capacity

Current Staffing

Team Changes

Staffing Changes

Available Capacity

Optimize

Modify Consumption

Rates

Modify Productivity

Rates

Requires Time-Based ABC

Page 19: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Add Resources as gap closes

Capacity First

Page 20: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

#AnaplanHub16

Moving Forward

BetterVu’s ABC App as the core of a Predictive Costing Platform

Page 21: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Integrated ABC Platform

Page 22: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Impact of Product Changes

ActualsForecast Yr 1

Forecast Yr 2

% o

f Vol

by

Type

Cost per Loan by Type

Page 23: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

LifecycleForecasting

Cost per Loan by type of loan $

Account Activity by Age of Loan from inception

# Ca

lls p

er m

onth

per

loan

(showing different loan types)

Page 24: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Summary

ABC Analytics Provide Value

Consumption Modelsaid understanding and

support capacity modelling

ABC App provides the framework

Value in Forecasting is from Integration

Page 25: Predictive Costing: Plan for future cost and capacity levels with ABC using Anaplan

Q A