76
Vision: Service That Will Free Your Mind

Restoration presentation

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Restoration presentation

Vision:Service That Will Free Your Mind

Page 2: Restoration presentation

Kirit KumarDirector

Approved Restorers

Page 3: Restoration presentation

A disaster can

strike any business

operation at any time

Page 4: Restoration presentation

Having a loss is bad news;

But what is worse is not knowing WHOcan assist in mitigating the loss.

Page 5: Restoration presentation

Approved RestorersApproved Restorers

Asia’s leading one-stop disaster Asia’s leading one-stop disaster recovery and business continuity recovery and business continuity

centrecentre

Page 6: Restoration presentation

Objective of restoration:Mitigate losses and reduce Mitigate losses and reduce downtime through downtime through economicaleconomical recovery.recovery.

Page 7: Restoration presentation

Certified by:

Page 8: Restoration presentation

Coverage Area

Page 9: Restoration presentation

Major Losses include…

ExplosionExplosion

AcidAcid

WaterWater

FireFireMaliciousMalicious

FloodFlood

StormStorm

SurgeSurge

LandLandSlideSlide

ImpactImpact

Page 10: Restoration presentation

Expertise and experience:

providing complete recovery services for almost any type of sector of the economy

CommercialCommercial IndustrialIndustrial

Page 11: Restoration presentation

Sectors include

– Electronics• IT• Telecommunication

– Plant & Machinery– Oil and Gas

Page 12: Restoration presentation

I.T. Platform

Page 13: Restoration presentation

Telecommunication

Page 14: Restoration presentation

Plant & Machinery

Page 15: Restoration presentation

Oil & Gas

Page 16: Restoration presentation

Definition of restoration

• To put contaminated equipment back to their pre-loss condition

Page 17: Restoration presentation

Difference

• Contaminated• Damaged – needs repairs / replacement

Page 18: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 19: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 20: Restoration presentation

Activities of restoration– Inspection for extent of contamination

Page 21: Restoration presentation

Activities of restoration– Inspection for extent of contamination

Page 22: Restoration presentation

Activities of restoration– Inspection for extent of contamination

Page 23: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 24: Restoration presentation

Activities of restoration– Detailed Itemization

Page 25: Restoration presentation

Activities of restoration– Detailed Itemization

Page 26: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 27: Restoration presentation

Activities of restoration– Technical reports

Page 28: Restoration presentation

Activities of restoration– Technical reports

Page 29: Restoration presentation

Activities of restoration– Technical reports

Page 30: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 31: Restoration presentation

Activities of restoration–Stabilization and preservation

• Removal of affected items to clean, dry area• Preservation• Treatment e.g. anti corrosion

Page 32: Restoration presentation

Stabilization

Page 33: Restoration presentation

Stabilization

Page 34: Restoration presentation

Activities of restoration– No stabilization – Cocoa factory

Page 35: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 36: Restoration presentation

Activities of restoration– Dehumidification

Page 37: Restoration presentation

Activities of restoration– Dehumidification

Page 38: Restoration presentation

Samsung - Dehumidification

Page 39: Restoration presentation

Medical - Dehumidification

Page 40: Restoration presentation

Activities of restoration– Decontamination

• Precision contaminants extraction • Cryogenics (Dry Ice Blasting)• Corrosion control

Page 41: Restoration presentation

Activities of restoration– Decontamination

• Precision contaminants extraction • Cryogenics (Dry Ice Blasting)• Corrosion Control

Page 42: Restoration presentation

Activities of restoration– Decontamination

• Precision Contaminants Extraction

Page 43: Restoration presentation

Activities of restoration- Decontamination

Precision Contaminants Extraction

Page 44: Restoration presentation

Electronics

Page 45: Restoration presentation

Telecommunication

Page 46: Restoration presentation

Telecommunication

Page 47: Restoration presentation

Medical equipment

Page 48: Restoration presentation

Activities of restoration– Decontamination

• Precision Contaminants Extraction

Page 49: Restoration presentation

Woodworking

Before

Page 50: Restoration presentation

Woodworking

• After - Video

Page 51: Restoration presentation

Activities of restoration– Decontamination

• Precision contaminants extraction • Cryogenics (Dry Ice Blasting)• Corrosion Control

Page 52: Restoration presentation

Activities of restoration• Cryogenics (Dry Ice Blasting)

Page 53: Restoration presentation

Activities of restoration• Cryogenics (Dry Ice Blasting)

Page 54: Restoration presentation

Activities of restoration• Cryogenics (Dry Ice Blasting)

– uses small rice size pellets – temperature of the dry ice -109.3°F or -78.5°C– "blasting" against the material to be removed, causes it to shrink and loose

adhesion from its sub surface– the dry ice to convert back into carbon dioxide gas at 800 times greater volume.– Removes paint, oil, grease, asphalt, tar, decals, soot, dirt, ink, resins, and

adhesives.

Page 55: Restoration presentation

Machinery

Page 56: Restoration presentation

Industrial Automation

Page 57: Restoration presentation

Industrial Automation

Page 58: Restoration presentation

Industrial Automation

Page 59: Restoration presentation

Activities of restoration– Decontamination

• Precision contaminants extraction • Cryogenics (Dry Ice Blasting)• Corrosion Control

Page 60: Restoration presentation

Activities of restoration• Corrosion Control

Page 61: Restoration presentation

Activities of restoration• Corrosion Control

Page 62: Restoration presentation

Activities of restoration• Corrosion Control

Page 63: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 64: Restoration presentation

Activities of restoration– Parts replacement and repair

Page 65: Restoration presentation

Activities of restoration– Parts replacement and repair

Page 66: Restoration presentation

Activities of restoration– Inspection for extent of contamination– Detailed Itemization– Technical reports– Stabilization and preservation– Dehumidification and decontamination– Parts replacement and repair (if any)– Testing and commissioning– Handover

Page 67: Restoration presentation

Activities of restoration– Testing and commissioning

Page 68: Restoration presentation

Activities of restoration– Testing and commissioning

Page 69: Restoration presentation

Not economical to restore

Page 70: Restoration presentation

Not economical to restore

Page 71: Restoration presentation

Not economical to restore

Page 72: Restoration presentation

Actual IndependentReliability Results

InfantMortalityPeriod

FailureRate

Useful Life Period Wear out Period

Operating Time (Component Age or Life)

Reduced life span if not decontaminated Designed life span

Extended life span if decontaminated

Decontamination action

Contamination event

Independent Study

Page 73: Restoration presentation

Summary Approved Restorers

1. We Offer Complete Restoration Solution2. First and Fast3. Economical Costs4. Full or Partial Functional Capacity5. Friendly and Trained Personnel

Page 74: Restoration presentation

Savings! Savings! Equipment Peril Replacement Restoration Saved

Ultrasound Fire 9,975 1,500 85 %

Residential Fire 30,000 9,000 70 %

Office Equipment Fire 68,000 15,000 78 %

Hotel Ballroom Water 80,000 20,000 75 %

Warehouse Stock Fire 750,000 80,000 89 %

Cellular Equipment Water 420,000 60,000 86 %

Chemical Plant Acid 500,000 65,000 87 %

Power Sub Station Fire 1,440,000 580,000 60 %

Medical Equipment Fire 980,000 150,000 85 %

CNC Machines Water 660,000 170,000 75 %

Currency: USD

Page 75: Restoration presentation
Page 76: Restoration presentation

Thank you very much.