Toby Elwin PMP, SCA SCA = Special Change Agent Scope or: How to Manage Projects for Organization Success Change Management as a Project Promise

Scope or: How to Manage Projects for Organization Success

Embed Size (px)

DESCRIPTION

Organizations rely on projects to remain competitive. Projects are the way organizations deliver and realize their executive strategies. The ability to deliver a project is the ability to compete. Scope kills projects and projects that are not delivered kill organizations.

Citation preview

Page 1: Scope or: How to Manage Projects for Organization Success

Toby Elwin PMP, SCA!

SCA = Special Change Agent !

Scope or: How to Manage Projects for Organization

Success Change Management as a Project Promise

Page 2: Scope or: How to Manage Projects for Organization Success

$!

The Project Challenge!Scope, Plan, Manage, and Measure!Change Business Case!

Outline!

$

3!

Page 3: Scope or: How to Manage Projects for Organization Success

$ $!

•  Realities of change •  PMBOK 4.0 •  People, Process,

Technology

1.  The Project Challenge!

2.  Scope, Plan, Manage, and Measure!

3.  Change Business Case!

4!

Page 4: Scope or: How to Manage Projects for Organization Success

$ $!

The Project Challenge!

•  Resistance and inadequate sponsorship are common reasons that projects fail to deliver desired results!

•  Leaders underestimate how hard it is to drive people from a known comfort zone – no matter how desirable the future seems!

•  Whether the starting point is a crisis or an opportunity, the challenge remains that a project changes the way employees, customers, and investors perceive, experience, or cope with the project change!

•  Even if the future reality is clear and compelling and better than today, the project also has to be framed as necessary or even inevitable!

•  Realities of change!

•  PMBOK 4.0!

•  People, Process, Technology!

5!

Page 5: Scope or: How to Manage Projects for Organization Success

$ $!

The Project Challenge!

•  Project Management identifies requirements to address various needs, concerns, and expectations of the stakeholders as the project is planned and carried out.  !

•  Project management balances organization and project constraints included, but not limited to:  scope, quality, schedule, budget, resources, and risk.!

•  The latest version of Project Management Institute’s PMBOK 4.0 indexes the following words:!§  project 6,030 times, !§  process 1,845, !§  change 760, !§  results 234, and !§  people 49 times -- a people to process

ratio of 1:123? !

•  Realities of change!

•  PMBOK 4.0 – The Project Management Book of Knowledge, �The Project Management Institute!

•  People, Process, Technology!

6!

Page 6: Scope or: How to Manage Projects for Organization Success

$ $!

The Project Challenge - People rely on frameworks to make sense of their world�! •  Change disrupts patterns and transition

presents confusion, both create desire to revert to what is known!

•  Scope presents a map and the compass bearings for change. To manage change, you first need to manage scope.!

•  A project may make all the business sense in the world, but people are emotional and emotions impact decision-making!

•  Projects present interpretation along 3 spectrums:!

1.  personal case vs. business case!2.  emotional vs. rational!3.  qualitative vs. quantitative!

•  It takes people to deliver a project, execute a process, manage change, and deliver results, a dramatic shift from a 1:178 people to process ratio!

•  Realities of change!

•  PMBOK 4.0!

•  People, Process, Technology!

7!

Page 7: Scope or: How to Manage Projects for Organization Success

$ $!

The Project Challenge – Organizations should only choose projects that deliver to their executive strategy!

% of Firms

36%

41%

43%

44%

44%

46%

54%

65%

72%

82%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90%

IT Perspective not Integrated

Silos/No Horizontal Process View

No Organizational Change Plan

Scope Expansion / Uncertainty

Business Case not Compelling

Inadequate Sponsorship

Unrealistic Expectations

Poor Project Management

Resistance by Employees

Project Team Lacked Skills

Source: Deloitte CIO Survey

Survey asked for top reasons, results are greater than 100%,!

Projects fail at an alarming rate!•  74% of all projects fail, come in

over budget or run past the original deadline!

•  90% of major IT project initiatives fail to be completed on time and on budget!

•  A survey by KPMG, an international consulting firm, finds globally that 56% of IT projects fail is underestimating the scale of the problem!

•  Certus, the UK IT director forum, believes that the failure rate of IT projects is closer to 90%.!

8!

Page 8: Scope or: How to Manage Projects for Organization Success

$ $!

1.  The Project Challenge!

2.  Scope, Plan, Manage, and�Measure!

Scope needs to be carefully defined and "managed as different people have different"needs, it is crucial to understand the impact"a project may have and to understand"the voice of the customer at all levels!

3.  Change Business Case!

•  Projects should all be evaluated with the same criteria capital expenditures are planned and with the same comparison:!

•  Net present value!•  Discounted cash flow!•  Internal rate of return, etc..!

•  Projects in the planning phase that present quantitative data and clear goals decrease the perception that they are pet projects driven by personality, not business!

•  The project should be measured against initial baselines goals for trend analysis and gap analysis !

•  Create dialogue around a project supported by a business case rationale with quantitative support, not a project that is a personality driven with emotional or qualitative criteria!

Scope, Plan, Manage, and Measure – Project transparency relies on clear, communicated goals and clear expectations �!

9!

Page 9: Scope or: How to Manage Projects for Organization Success

$ $!

The following tools identify, assess, quantify, and qualify project scope:!•  Organizational Process Assets!•  Enterprise Environment Factors!•  Change Readiness!•  Impact Analysis!•  Stakeholder Analysis!•  Communication Plan!•  Risk Register!

1.  The Project Challenge!

2.  Scope, Plan, Manage, and Measure!

3.  Change Business Case!

Scope, Plan, Manage, and Measure – Defining and managing scope throughout the project is a project’s key success factor!

10!

Page 10: Scope or: How to Manage Projects for Organization Success

$ $!

Scope, plan, manage, and measure - The proper assessment of organization culture and project stakeholders will provide the most accurate project scope!

1.  Look at past project key success factors!

2.  Identify pitfalls!3.  Find power brokers!4.  Look for tools already

accepted and leverage their familiarity!

5.  Acknowledge organization accomplishment!

!

•  Organizational Process Assets (Knowledge Management)!

•  Enterprise Environment Factors (Culture)!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

11!

Page 11: Scope or: How to Manage Projects for Organization Success

$ $!

There is a natural productivity dip as you, the team, and the organization manage their role and the uncertainty of change. ��!

12!

�I can�t act any more with all this uncertainty�

Time

!  �What�s this?� !  �Our company is

taking a big step�

�This is not something I want to be a part of�

�I�ll do what is necessary to survive�

�I think I can figure out how to live with it�

!  �It is the right thing to do�

!  �We will succeed�

Early awareness

Denial and uncertainty

Paralysis

Departure

Withdrawal

Adaptation

Commitment

Productivity Baseline

Organization Momentum

!  �To what extent will it affect me?�

!  �How can I get all this done?� !  �Does this make sense?�

Fear and resistance

!  �Same job, less money!�

!  �I don�t trust those guys!�

!  �Maybe, I should learn more about it� !  �The train is leaving, I better get on� !  �It�s difficult, but we can do it�

Testing and acceptance

RESISTANCE

DENIAL

EXPLORATION

COMMITMENT

Page 12: Scope or: How to Manage Projects for Organization Success

$ $!

Change is managed transition, it is important to manage the project and operations at or above the productivity baseline - competence will bring confidence!

Factors that will sabotage productivity!1. Low level of collaboration / difficulties in meeting objectives!

§  Limited buy-in and support!§  Lack of employee motivation !§  Increasing resistance to transformation and change!§  Lack of alignment across key stakeholders and

business leaders!§  Potential conflicts due to lingering non-addressed

issues and differences!

2. Operational obstacles and delays!§  Lack of alignment of business and critical support

functions!§  Difficulties and misunderstandings in

communication due to unclear objectives, varying expectations and competing business priorities!

§  Eroding trust and loss of good people !§  Loss of productivity !

3. Loss of leadership credibility !

§  Lack of accountability or empowerment with the teams!

§  Early results not sustained!§  Difficulties on implementing the transformation

initiatives!!

13!

�I can�t act any more with all this uncertainty�

Time

!  �What�s this?� !  �Our company is

taking a big step�

�This is not something I want to be a part of�

�I�ll do what is necessary to survive�

�I think I can figure out how to live with it�

!  �It is the right thing to do�

!  �We will succeed�

Early awareness

Denial and uncertainty

Paralysis

Departure

Withdrawal

Adaptation

Commitment

Productivity Baseline

Organization Momentum

!  �To what extent will it affect me?�

!  �How can I get all this done?� !  �Does this make sense?�

Fear and resistance

!  �Same job, less money!�

!  �I don�t trust those guys!�

!  �Maybe, I should learn more about it� !  �The train is leaving, I better get on� !  �It�s difficult, but we can do it�

Testing and acceptance

RESISTANCE

DENIAL

EXPLORATION

COMMITMENT

Page 13: Scope or: How to Manage Projects for Organization Success

$ $!

An organization’s culture and leadership style review provides and a look at tradition areas of concern, to avoid, or success factors, to replicate.��!

The Competing Values Framework:!!

1.  Identifies 4 types of organizational culture:!•  Ad Hoc, !•  Clan, !•  Hierarchy, and !•  Market!

2.  Evaluates organizations by values of leadership, effectiveness, organizational theory, and Total Quality Management programs!

3.  Categorizes organizations by degree of:!•  Internal focus and

integration!•  Flexibility and discretion!•  External Focus and

differentiation!•  Stability and control!

14!

Page 14: Scope or: How to Manage Projects for Organization Success

$ $!

Sample Competing Values Plotted!

CEO / Executive Team!

Founder / Executive Team!

CFO / Executive Team!

Director of Marketing!

15!

Page 15: Scope or: How to Manage Projects for Organization Success

$ $!

1.  The Project Challenge!

2.  Scope, Plan, Manage, and Measure!

3.  Change Business Case!

Scope, Plan, Manage, and Measure – Defining and managing scope throughout the project is a project’s key success factor!

16!

•  Organizational Process Assets

•  Enterprise Environment Factors

•  Change Readiness •  Impact Analysis •  Stakeholder Analysis •  Communication Plan •  Risk Register

Page 16: Scope or: How to Manage Projects for Organization Success

$ $!

Plan, manage, and measure!

1.  Look at past project key success factors!

2.  Identify pitfalls!3.  Find power brokers!4.  Look for tools already

accepted and leverage their familiarity!

5.  Acknowledge organization accomplishment!

!

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

17!

Page 17: Scope or: How to Manage Projects for Organization Success

$ $!

1.  Assess the level of readiness!2.  Measure the gap between the

current level of readiness and the needed level for each stakeholder group!

3.  Prioritize where intervention is required!

4.  Identify key issues for each stakeholder group!

5.  Begin to develop tactical recommendations to bridge gap in readiness levels and address key issues!

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

Plan, manage, and measure!

18!

Page 18: Scope or: How to Manage Projects for Organization Success

$ $!

Change readiness survey sample (1 of 2)! Strongly

Agree Agree

Neither Agree nor Disagree

Disagree Strongly Disagree

1. I understand why [insert company name] will implement [any example: technology, etc…].

2. I believe that [INSERT COMPANY NAME] must implement [any example: technology, etc...].

3. The goals of the [any example: technology, etc...] program have been clearly communicated to me.

4. I have communicated the goals of the [any example: technology, etc...] program to my team or colleagues.

5. I believe that the long-term benefits of [any example: technology, etc...] outweigh any short-term disruption to standard operating procedures.

6. I believe [INSERT COMPANY NAME] senior management effectively communicate the vision for [INSERT COMPANY NAME]

7. I believe [INSERT COMPANY NAME] senior management effectively communicate the vision for [INSERT COMPANY NAME]

8. I believe that the [any example: technology, etc...] is a necessary component to achieve the [INSERT COMPANY NAME] vision.

9. I believe we have the people and process currently in place to achieve the vision of the organization.

19!

Page 19: Scope or: How to Manage Projects for Organization Success

$ $!

Change readiness survey sample (2 of 2)!Current Culture

Authoritarian Self-governed Participatory Team-Oriented Democratic

Preferred Culture

1. Dominant Management Philosophy

Authoritarian Self-governed Participatory Team-Oriented Democratic

Current Culture Common Consistent Differentiated Divergent Disparate

Preferred Culture

2. Degree Processes are Standardized

Common Consistent Differentiated Divergent Disparate

Current Culture Individual Only Mostly

Individual Individual and Team

Mostly Team Team Only

Preferred Culture

3.

Reward Behaviors

Individual Only Mostly Individual

Individual and Team

Mostly Team Team Only

Current Culture Up or Out Adaptive

Performance Standard Performance

Subjective Performance

Job for Life

Preferred Culture

4.

Career Progression

Up or Out Adaptive

Performance Standard Performance

Subjective Performance

Job for Life

Current Culture Base

Compensation Base + Reward Balanced High Incentive All Incentive

Preferred Culture

5.

Method for Reward and Incentive

Base Compensation

Base + Reward Balanced High Incentive All Incentive

20!

Page 20: Scope or: How to Manage Projects for Organization Success

$ $!

Change readiness survey sample data

21!

Page 21: Scope or: How to Manage Projects for Organization Success

$ $!

Scope, plan, manage, and measure!

1.  Investigate the impact to internal and external stakeholders!

2.  Identify stakeholders!3.  Improve communication! !

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

22!

Page 22: Scope or: How to Manage Projects for Organization Success

$ $!

Understand Sponsor Goals &

Expectations!

Understand Strategic Context

& Intent!

Assess Internal Context - Stakeholders &

Technology!

Categorize Areas Of Impact!

Identify Impact Issues!

!

Prioritize Impacts!

!

Develop Impact Strategy!

!

!

Implement!!

Focus Groups - Interviews and conversations with key personnel - Drawing on past experiences and knowledge - Project team discussions !

The departments affected are identified (i.e., HR, Communications, CIS etc.). - Employee positions affected are then ascertained. - Following, classification of the impact issue is by business area !

Frequency (i.e. how often) - Criticality (extent to which the impact threatens project success) - Complexity - Time Involved - Number of Business Areas Impacted - Position Impacted - Difficulty of Implementation !

After prioritizing the impacts, highest priorities are addressed first. The focus is to address and minimize negative results of change and typically done during team meetings to ensure that the strategy will incorporate a diverse perspective. Those issues with high degrees of impact are addressed first and given more time, energy and focus. !

After impact strategy development, the strategy is reviewed with the project sponsor. Findings should be factored into the project scope and project constraints.!!

Impact strategy development!

Source: Deloitte Consulting!

23!

Page 23: Scope or: How to Manage Projects for Organization Success

$ $!

Introduction of templates and legend to review templates!

Template name and full view!

Template section drilldown!

Template �Section enlarged!

24!

Page 24: Scope or: How to Manage Projects for Organization Success

$ $!

Impact analysis sample template 1!

•  All managers and leaders are message champions !•  Communicate consistently across and within

stakeholder groups!•  Tailor communication to the interests of each

audience!•  Use proven delivery methods that have been

successful in the past, while taking advantage of innovative new processes !

•  Involve stakeholders in program decision making!•  Actively solicit, listen and respond to customer

feedback !

Communication Principles!

•  Increase awareness of how the program helps the organization meet its mission challenges today and will help in the future!

•  Prepare users for changes!•  Educate stakeholders about the method of

delivering capabilities!•  Involve stakeholders in planning for changes in

people, process and technology; get their feedback on the process; and gain !

•  their buy-in!•  Inform external oversight bodies and gain their

support!•  Share the project’s progress and celebrate its

successes!

Communication Objectives!

25!

Page 25: Scope or: How to Manage Projects for Organization Success

$ $!

Impact analysis sample template 1 of 3!

26!

Page 26: Scope or: How to Manage Projects for Organization Success

$ $!

Impact analysis sample template 2 of 3!

27!

Page 27: Scope or: How to Manage Projects for Organization Success

$ $!

Impact analysis sample template 3 of 3!

28!

Page 28: Scope or: How to Manage Projects for Organization Success

$ $!

1.  Identify potential advocates and critics of the change!

2.  Eliminate resistance to change!

3.  Create a team atmosphere !4.  Establish a level of trust!5.  Create a sense of

ownership for participants involved in the change!

6.  Raise the level of communication effectiveness!

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

Plan, manage, and measure!

29!

Page 29: Scope or: How to Manage Projects for Organization Success

$ $!

Stakeholder assessment sample 1 of 3 !Name or Group Role

Motivation, Drivers, Expectations of Exchange

When does this stakeholder need to be involved in the

change effort?

Stakeholder Management Activities

Who Delivers When due Status

- 0 + ++

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

- 0 + ++

4 3 6 3

Stakeholder Analysis

Predisposition

Disposition sum•  All managers and leaders are message champions !•  Communicate consistently across and within

stakeholder groups!•  Tailor communication to the interests of each

audience!•  Use proven delivery methods that have been

successful in the past, while taking advantage of innovative new processes !

•  Involve stakeholders in program decision making!•  Actively solicit, listen and respond to customer

feedback !

Communication Principles!

•  Increase awareness of how the program helps the organization meet its mission challenges today and will help in the future!

•  Prepare users for changes!•  Educate stakeholders about the method of

delivering capabilities!•  Involve stakeholders in planning for changes in

people, process and technology; get their feedback on the process; and gain !

•  their buy-in!•  Inform external oversight bodies and gain their

support!•  Share the project’s progress and celebrate its

successes!

Communication Objectives!

30!

Page 30: Scope or: How to Manage Projects for Organization Success

$ $!

Stakeholder assessment sample 2 of 3!

Name or Group RoleMotivation, Drivers, Expectations of

Exchange

When does this stakeholder need to be involved in the

change effort?

Stakeholder Management Activities

Who Delivers When due Status

- 0 + ++

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

- 0 + ++

4 3 6 3

Stakeholder Analysis

Predisposition

Disposition sum

Use this to make your sponsors and your team aware of the !

Plot these individually on a 4 X 4 matrix (see slide 24)!

31!

Page 31: Scope or: How to Manage Projects for Organization Success

$ $!

Stakeholder assessment sample 3 of 3!

Name or Group RoleMotivation, Drivers, Expectations of

Exchange

When does this stakeholder need to be involved in the

change effort?

Stakeholder Management Activities

Who Delivers When due Status

- 0 + ++

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

- 0 + ++

4 3 6 3

Stakeholder Analysis

Predisposition

Disposition sum

32!

Page 32: Scope or: How to Manage Projects for Organization Success

$ $!

Stakeholder management visual plot!

o ++

- +

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o ++

- +

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o++

-+

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o ++

- +

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o++

-+

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your

o++

-+

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o++

-+

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o++

-+

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

o++

-+

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

Name or Group RoleMotivation, Drivers, Expectations of

Exchange

When does this stakeholder need to be involved in the

change effort?

Stakeholder Management Activities

Who Delivers When due Status

- 0 + ++

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

- 0 + ++

4 3 6 3

Stakeholder Analysis

Predisposition

Disposition sum

o ++

- +

Support

Influence

OA

Commissioner

OTIS SMEs

SCRIBE SMEs DMS Food Systems SME's

Division Section Leads

Derek Allen (DISC)

DISC

Michael Nail

Bob Haness Joe Caifero

Patti Foster

Melanie White

33!

Page 33: Scope or: How to Manage Projects for Organization Success

$ $!

1.  Without good information, people make it up!

2.  Lack of information breeds uncertainty…and anxiety!

3.  Anxiety interferes with focus and productivity!

4.  People work harder for organizations they feel a part of!

5.  Communication stimulates new ways of thinking!

6.  Communication is about ensuring the right messages are conveyed to the right stakeholders through the right mechanisms in real time.!

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

Plan, manage, and measure!

34!

Page 34: Scope or: How to Manage Projects for Organization Success

$ $!

Communication will increase business’ understanding, ownership and acceptance of the change

•  What is the transformation about?!

•  Why is there a need for it?!

•  What major changes will occur?!

•  How will my organization be different?!

•  What does it mean to end users?!

•  What is the timeline for significant events? !

•  How will the changes impact me and job?!

•  What are my new roles and responsibilities?!

•  How can I influence the changes?!

•  What new functionalities will be provided?!

•  How will the current processes change?!

•  How will the progress be measured and reported?!

•  Where do I go to find more information? !

•  How does the change/process/technology work?!

•  How will the changes help me?!

•  What are my new responsibilities? !

•  What support will I have after training?!

•  Who are the primary points of contact!

•  Who can answer my questions? !

•  How will the changes be implemented?!

•  Who can I call if I have problems?!

•  When will the changes be implemented? !

•  How are the customers adapting throughout the transition process?!

•  What communications channels are working/not working?!

•  What kind of concerns do the customers have?!

•  What are the lessons learned? !

Awareness! Understanding/ Involvement!

Training/ Acceptance!

Implementation/ Transition! Follow up!

35!

Page 35: Scope or: How to Manage Projects for Organization Success

$ $!

Communications plan sample 1!Messaging

Project Team WorkstreamName of

Communication Event

Audience Category

Audience Description

Delivery Channel

Project Phase

Frequency Target Date(s)Communication Objectives

(Commitment Curve)Key Messages Content Developer

Content Reviewer & Approver

Key Communicators

Additional Notes

Status Status NotesLocation of

Communication Documents

General Information Timing Communication Roles Communication Status

•  All managers and leaders are message champions !•  Communicate consistently across and within

stakeholder groups!•  Tailor communication to the interests of each

audience!•  Use proven delivery methods that have been

successful in the past, while taking advantage of innovative new processes !

•  Involve stakeholders in program decision making!•  Actively solicit, listen and respond to customer

feedback !

Communication Principles!

•  Increase awareness of how the program helps the organization meet its mission challenges today and will help in the future!

•  Prepare users for changes!•  Educate stakeholders about the method of

delivering capabilities!•  Involve stakeholders in planning for changes in

people, process and technology; get their feedback on the process; and gain !

•  their buy-in!•  Inform external oversight bodies and gain their

support!•  Share the project’s progress and celebrate its

successes!

Communication Objectives!

36!

Page 36: Scope or: How to Manage Projects for Organization Success

$ $!

Communications plan sample 1 of 4!

Messaging

Project Team WorkstreamName of

Communication Event

Audience Category

Audience Description

Delivery Channel

Project Phase

Frequency Target Date(s)Communication Objectives

(Commitment Curve)Key Messages Content Developer

Content Reviewer & Approver

Key Communicators

Additional Notes

Status Status NotesLocation of

Communication Documents

General Information Timing Communication Roles Communication Status

37!

Page 37: Scope or: How to Manage Projects for Organization Success

$ $!

Messaging

Project Team WorkstreamName of

Communication Event

Audience Category

Audience Description

Delivery Channel

Project Phase

Frequency Target Date(s)Communication Objectives

(Commitment Curve)Key Messages Content Developer

Content Reviewer & Approver

Key Communicators

Additional Notes

Status Status NotesLocation of

Communication Documents

General Information Timing Communication Roles Communication Status

Communications plan sample 2 of 4!

38!

Page 38: Scope or: How to Manage Projects for Organization Success

$ $!

Messaging

Project Team WorkstreamName of

Communication Event

Audience Category

Audience Description

Delivery Channel

Project Phase

Frequency Target Date(s)Communication Objectives

(Commitment Curve)Key Messages Content Developer

Content Reviewer & Approver

Key Communicators

Additional Notes

Status Status NotesLocation of

Communication Documents

General Information Timing Communication Roles Communication Status

Communications plan sample 3 of 4!

39!

Page 39: Scope or: How to Manage Projects for Organization Success

$ $!

Messaging

Project Team WorkstreamName of

Communication Event

Audience Category

Audience Description

Delivery Channel

Project Phase

Frequency Target Date(s)Communication Objectives

(Commitment Curve)Key Messages Content Developer

Content Reviewer & Approver

Key Communicators

Additional Notes

Status Status NotesLocation of

Communication Documents

General Information Timing Communication Roles Communication Status

Communications plan sample 4 of 4!

40!

Page 40: Scope or: How to Manage Projects for Organization Success

$ $!

Communications plan sample 2�!

Frequency Activity Purpose Prepare Participate or Review

Weekly Conduct Project Team (DT) Meeting Planning session for DT MT MT, DT

WeeklyDevelop meeting minutes Verify/develop project/archive old news,

new news, and actionsCommunication Lead ---

WeeklyDevelop Advisory Team (AT) talking points Provide relevant project activity summary

and information requests for AT members to discuss with Sponsors

Communication Lead MT

WeeklyUpdate project plan Update project plan with work performed

and any changes to tasksCommunication Lead MT

1st and 3rd

Tuesdays of every

month (TBD)

Conduct AT MeetingUpdate AT on project progress, obtain input, identify and resolve issues

Communication Lead, MT AT, MT, DT

Bi-weekly Develop Client Status ReportUpdate Project Leadership on project progress and identify issues/risks

Communication Lead MT

Bi-weekly Deliver Client Status Report --- --- MT

WeeklyConduct Client Status Meeting (Project Leadership)

Update Project Leadership on project progress, obtain input, identify and resolve issues

MT Project Leadership, MT

Weekly Collect AT information and follow-on actions Based on AT input, coordinate suggestions or communications

Communications Lead Communications Lead

Bi-weeklyCollect client feedback, information, follow-on actions

Output of bi-weekly client meeting Communications Lead Communications Lead

Bi-weeklyDevelop project team next-step (for following week) action reports

From bi-weekly client meeting update or modify based on client meeting

MT MT, Communications Lead

WeeklyDevelop project team next-step (for following week) action reports

Create team action reports MT MT, Communications Lead

WeeklyCollect status progress reports from team leads Collect information from team leads to

harmonize project modifications and develop team communication

Communications Lead Communications Lead

WeeklyUpdate client status report Boutelle calls Gaddy to give project update Communications Lead Communications Lead to

provide talking points; Sponsor, AT

WeeklyAT and Sponsor touch point Goldstein calls Ford to give project update Communications Lead Communications Lead to

provide talking points; AT

WeeklyProject Leadership touch point Richardson catches up with Argodale and

BontaCommunications Lead Communications Lead to

provide talking points; AT lead calls Sponsor

WeeklyDebrief/document client feedback or action steps from client meeting

Verify/develop project/archive old news, new news, and actions

Communications Lead MT, Communications Lead

WeeklyFollow-on actions from client meeting Verify/develop project/archive old news,

new news, and actionsCommunications Lead MT, Communications Lead

WeeklyDevelop meeting agenda Coordinate communication from the week

and develop Monday's agendaCommunications Lead MT, Communications Lead

MONTHLY

2nd Tuesday of each month - April 11, May 9, June 13, July 11 (TBD)

Executive Briefing Summary briefings for Sponsors and Project Leadership to present status and gather feedback

MT, Communications Lead Sponsors, Project Leadership, MT

GROUPS

Advisory Team (AT)

Management Team

Project Team (DT)

Sponsors

Project Leadership

MONDAY

WEDNESDAY

THURSDAY

FRIDAY

TUESDAY

Project Management Team Communications

41!

Page 41: Scope or: How to Manage Projects for Organization Success

$ $!

Plan, manage, and measure!

1.  Decide how you will identify and manage risk !

2.  Determine ratings, escalation, and resolution!

3.  Identify risk stakeholder impact!

4.  Understand probability!5.  Do not use this as a checklist!

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Assessment!•  Communications!•  Risk Register!

42!

Page 42: Scope or: How to Manage Projects for Organization Success

$ $!

Risk register !Functional

GroupRisk Category Risk ID System ID Risk Event Potential Impact Occurrence Probability Impact Rating Risk Response Strategy Description

This is the functional team name, i.e., R&D,

Accounting & Controlling, Sales and

Marketing.

Operational - risk is directly related to the project or program’s scope and

scheduleTechnical - risk impacts the deal /

contractOther - all inclusive. Not covered by

the above.

User defined number.

User defined number. May or may not be

used.

A discrete occurrence that may affect the project for better or

worse. Risk is thought to have negative impact. Briefly describe

what the risk looks like.

Brief statement describing what would happen if the

risk event triggered.What would the adverse

effect(s) look like?

High - It is probably going to happen.Medium - There is a 50 / 50 chance of it happening.

Low - Little to no likelihood it will happen.

Your assessment of the event’s adverse effects (i.e., scope, schedule, budget, etc.) if the risk

event triggers.Three choices:

High - Severe project effect(s).Medium - Moderate project effect(s).

Low - Limited project effect.

There are four risk response options:Avoid

TransferMitigateAccept

Describe what your plan is in the event the risk triggers. What are you going to do in

relationship to your risk response (i.e., avoid, transfer, mitigate, or accept).

MSC Operational MSC-1 Customs issues (import/export) Shipping delays Low High MitigatePrepare and validate customs documents prior to Day 1

MSC Technical MSC-2 Not able to issue POsNo direct materials for production

Low Low Mitigate Manual work-around

MSC Operational MSC-3 Incorrect customer paymentsPayments to Client X instead of Acquirer X

High Medium Avoid / TransferIT working on a solution. Accounting working on a reconciliation process

MSC Operational MSC-4Cannot clear all in-transits before Day 1

Inventory in-transit on Day 1 High Medium Transfer Accounting responsibility

MSC Operational MSC-5 Do not complete PI before 12/30Inventory adjustments posted in next fiscal year

Medium Low AcceptAccounting will make necessary reconciliation entries

MSC Technical MSC-6 Not able to ship product No shipping Low High Mitigate System testing

MSC Operational MSC-7Failed labor negotiations at Location D St.

No union agreement for employees at Location D

Medium High MitigateEmployees work w/o a contract or under Client X contract via TSA

MSC Operational MSC-8Disruptions to "steady state" product flows

Backorders, late deliveries, etc. High Medium MitigateBuild inventory before Day 1. Stage shipments before Jan 2

MSC Technical MSC-9 EFD formatting or printing issuesNot able to ship, export, or import

Low Medium - could prevent shipping Mitigate Testing EFD's before Day 1

MSC Technical MSC-10Systems not ready for data transfers before Day 1

Delays in transferring orders and other data

Medium Medium -shipping/receiving delays Mitigate Prioritize order conversions if delays

MSC Operational / Technical MSC-11Last minute changes to country closing dates

Incorrect shipping settings Medium Medium Accept Be ready to react to any changes

Risk Assessment

•  All managers and leaders are message champions !•  Communicate consistently across and within

stakeholder groups!•  Tailor communication to the interests of each

audience!•  Use proven delivery methods that have been

successful in the past, while taking advantage of innovative new processes !

•  Involve stakeholders in program decision making!•  Actively solicit, listen and respond to customer

feedback !

Communication Principles!

•  Increase awareness of how the program helps the organization meet its mission challenges today and will help in the future!

•  Prepare users for changes!•  Educate stakeholders about the method of

delivering capabilities!•  Involve stakeholders in planning for changes in

people, process and technology; get their feedback on the process; and gain !

•  their buy-in!•  Inform external oversight bodies and gain their

support!•  Share the project’s progress and celebrate its

successes!

Communication Objectives!

43!

Page 43: Scope or: How to Manage Projects for Organization Success

$ $!

Functional Group

Risk Category Risk ID System ID Risk Event Potential Impact Occurrence Probability Impact Rating Risk Response Strategy Description

This is the functional team name, i.e., R&D,

Accounting & Controlling, Sales and

Marketing.

Operational - risk is directly related to the project or program’s scope and

scheduleTechnical - risk impacts the deal /

contractOther - all inclusive. Not covered by

the above.

User defined number.

User defined number. May or may not be

used.

A discrete occurrence that may affect the project for better or

worse. Risk is thought to have negative impact. Briefly describe

what the risk looks like.

Brief statement describing what would happen if the

risk event triggered.What would the adverse

effect(s) look like?

High - It is probably going to happen.Medium - There is a 50 / 50 chance of it happening.

Low - Little to no likelihood it will happen.

Your assessment of the event’s adverse effects (i.e., scope, schedule, budget, etc.) if the risk

event triggers.Three choices:

High - Severe project effect(s).Medium - Moderate project effect(s).

Low - Limited project effect.

There are four risk response options:Avoid

TransferMitigateAccept

Describe what your plan is in the event the risk triggers. What are you going to do in

relationship to your risk response (i.e., avoid, transfer, mitigate, or accept).

MSC Operational MSC-1 Customs issues (import/export) Shipping delays Low High MitigatePrepare and validate customs documents prior to Day 1

MSC Technical MSC-2 Not able to issue POsNo direct materials for production

Low Low Mitigate Manual work-around

MSC Operational MSC-3 Incorrect customer paymentsPayments to Client X instead of Acquirer X

High Medium Avoid / TransferIT working on a solution. Accounting working on a reconciliation process

MSC Operational MSC-4Cannot clear all in-transits before Day 1

Inventory in-transit on Day 1 High Medium Transfer Accounting responsibility

MSC Operational MSC-5 Do not complete PI before 12/30Inventory adjustments posted in next fiscal year

Medium Low AcceptAccounting will make necessary reconciliation entries

MSC Technical MSC-6 Not able to ship product No shipping Low High Mitigate System testing

MSC Operational MSC-7Failed labor negotiations at Location D St.

No union agreement for employees at Location D

Medium High MitigateEmployees work w/o a contract or under Client X contract via TSA

MSC Operational MSC-8Disruptions to "steady state" product flows

Backorders, late deliveries, etc. High Medium MitigateBuild inventory before Day 1. Stage shipments before Jan 2

MSC Technical MSC-9 EFD formatting or printing issuesNot able to ship, export, or import

Low Medium - could prevent shipping Mitigate Testing EFD's before Day 1

MSC Technical MSC-10Systems not ready for data transfers before Day 1

Delays in transferring orders and other data

Medium Medium -shipping/receiving delays Mitigate Prioritize order conversions if delays

MSC Operational / Technical MSC-11Last minute changes to country closing dates

Incorrect shipping settings Medium Medium Accept Be ready to react to any changes

Risk Assessment

Risk register 1 of 3!

44!

Page 44: Scope or: How to Manage Projects for Organization Success

$ $!

Functional Group

Risk Category Risk ID System ID Risk Event Potential Impact Occurrence Probability Impact Rating Risk Response Strategy Description

This is the functional team name, i.e., R&D,

Accounting & Controlling, Sales and

Marketing.

Operational - risk is directly related to the project or program’s scope and

scheduleTechnical - risk impacts the deal /

contractOther - all inclusive. Not covered by

the above.

User defined number.

User defined number. May or may not be

used.

A discrete occurrence that may affect the project for better or

worse. Risk is thought to have negative impact. Briefly describe

what the risk looks like.

Brief statement describing what would happen if the

risk event triggered.What would the adverse

effect(s) look like?

High - It is probably going to happen.Medium - There is a 50 / 50 chance of it happening.

Low - Little to no likelihood it will happen.

Your assessment of the event’s adverse effects (i.e., scope, schedule, budget, etc.) if the risk

event triggers.Three choices:

High - Severe project effect(s).Medium - Moderate project effect(s).

Low - Limited project effect.

There are four risk response options:Avoid

TransferMitigateAccept

Describe what your plan is in the event the risk triggers. What are you going to do in

relationship to your risk response (i.e., avoid, transfer, mitigate, or accept).

MSC Operational MSC-1 Customs issues (import/export) Shipping delays Low High MitigatePrepare and validate customs documents prior to Day 1

MSC Technical MSC-2 Not able to issue POsNo direct materials for production

Low Low Mitigate Manual work-around

MSC Operational MSC-3 Incorrect customer paymentsPayments to Client X instead of Acquirer X

High Medium Avoid / TransferIT working on a solution. Accounting working on a reconciliation process

MSC Operational MSC-4Cannot clear all in-transits before Day 1

Inventory in-transit on Day 1 High Medium Transfer Accounting responsibility

MSC Operational MSC-5 Do not complete PI before 12/30Inventory adjustments posted in next fiscal year

Medium Low AcceptAccounting will make necessary reconciliation entries

MSC Technical MSC-6 Not able to ship product No shipping Low High Mitigate System testing

MSC Operational MSC-7Failed labor negotiations at Location D St.

No union agreement for employees at Location D

Medium High MitigateEmployees work w/o a contract or under Client X contract via TSA

MSC Operational MSC-8Disruptions to "steady state" product flows

Backorders, late deliveries, etc. High Medium MitigateBuild inventory before Day 1. Stage shipments before Jan 2

MSC Technical MSC-9 EFD formatting or printing issuesNot able to ship, export, or import

Low Medium - could prevent shipping Mitigate Testing EFD's before Day 1

MSC Technical MSC-10Systems not ready for data transfers before Day 1

Delays in transferring orders and other data

Medium Medium -shipping/receiving delays Mitigate Prioritize order conversions if delays

MSC Operational / Technical MSC-11Last minute changes to country closing dates

Incorrect shipping settings Medium Medium Accept Be ready to react to any changes

Risk Assessment

Risk register 2 of 3!

45!

Page 45: Scope or: How to Manage Projects for Organization Success

$ $!

Functional Group

Risk Category Risk ID System ID Risk Event Potential Impact Occurrence Probability Impact Rating Risk Response Strategy Description

This is the functional team name, i.e., R&D,

Accounting & Controlling, Sales and

Marketing.

Operational - risk is directly related to the project or program’s scope and

scheduleTechnical - risk impacts the deal /

contractOther - all inclusive. Not covered by

the above.

User defined number.

User defined number. May or may not be

used.

A discrete occurrence that may affect the project for better or

worse. Risk is thought to have negative impact. Briefly describe

what the risk looks like.

Brief statement describing what would happen if the

risk event triggered.What would the adverse

effect(s) look like?

High - It is probably going to happen.Medium - There is a 50 / 50 chance of it happening.

Low - Little to no likelihood it will happen.

Your assessment of the event’s adverse effects (i.e., scope, schedule, budget, etc.) if the risk

event triggers.Three choices:

High - Severe project effect(s).Medium - Moderate project effect(s).

Low - Limited project effect.

There are four risk response options:Avoid

TransferMitigateAccept

Describe what your plan is in the event the risk triggers. What are you going to do in

relationship to your risk response (i.e., avoid, transfer, mitigate, or accept).

MSC Operational MSC-1 Customs issues (import/export) Shipping delays Low High MitigatePrepare and validate customs documents prior to Day 1

MSC Technical MSC-2 Not able to issue POsNo direct materials for production

Low Low Mitigate Manual work-around

MSC Operational MSC-3 Incorrect customer paymentsPayments to Client X instead of Acquirer X

High Medium Avoid / TransferIT working on a solution. Accounting working on a reconciliation process

MSC Operational MSC-4Cannot clear all in-transits before Day 1

Inventory in-transit on Day 1 High Medium Transfer Accounting responsibility

MSC Operational MSC-5 Do not complete PI before 12/30Inventory adjustments posted in next fiscal year

Medium Low AcceptAccounting will make necessary reconciliation entries

MSC Technical MSC-6 Not able to ship product No shipping Low High Mitigate System testing

MSC Operational MSC-7Failed labor negotiations at Location D St.

No union agreement for employees at Location D

Medium High MitigateEmployees work w/o a contract or under Client X contract via TSA

MSC Operational MSC-8Disruptions to "steady state" product flows

Backorders, late deliveries, etc. High Medium MitigateBuild inventory before Day 1. Stage shipments before Jan 2

MSC Technical MSC-9 EFD formatting or printing issuesNot able to ship, export, or import

Low Medium - could prevent shipping Mitigate Testing EFD's before Day 1

MSC Technical MSC-10Systems not ready for data transfers before Day 1

Delays in transferring orders and other data

Medium Medium -shipping/receiving delays Mitigate Prioritize order conversions if delays

MSC Operational / Technical MSC-11Last minute changes to country closing dates

Incorrect shipping settings Medium Medium Accept Be ready to react to any changes

Risk Assessment

Risk register 3 of 3!

46!

Page 46: Scope or: How to Manage Projects for Organization Success

$ $!

1  

Scope, Plan, Manage, and Measure!

New Scope!•  Stakeholder Assessment!•  Communications!•  Risk Register!

New Scope! •  Change Readiness!•  Impact Analysis!

New Scope! •  Organizational Process Assets!•  Enterprise Environment Factors!

Scope!

47!

Page 47: Scope or: How to Manage Projects for Organization Success

$ $!

•  Business case !•  Bait and switch!•  Triple constraint!•  Formulas!•  Project Human

Resource Management

48!

1.  The Project Challenge!

2.  Scope, Plan, Manage, and Measure!

3.  Change Business Case!

Page 48: Scope or: How to Manage Projects for Organization Success

$ $!

Change Business Case!

1.  The planning process!2.  Estimating resources!3.  Developing the budget!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!

49!

Page 49: Scope or: How to Manage Projects for Organization Success

$ $!

Change Business Case !

a)  WBS!b)  Activity sequence!c)  Network diagram!d)  Resource requirements!e)  Time and cost estimates!f)  Critical path dependencies!g)  Schedule development!h)  Budget development!

•  Business Case !1. The planning process!2. Estimating resources!3. Developing the budget!

•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!!

50!

Page 50: Scope or: How to Manage Projects for Organization Success

$ $!

Change Business Case !

•  When the planned resources are no longer available!

•  When the planned resources are removed!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!!

51!

Page 51: Scope or: How to Manage Projects for Organization Success

$ $!

Change Business Case !

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!Triple

Constraint!

Cost!

Customer Satisfaction!

52!

Page 52: Scope or: How to Manage Projects for Organization Success

$ $!

Change Business Case !

1.  Impact on project costs!2.  Impact on project duration!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!

53!

Page 53: Scope or: How to Manage Projects for Organization Success

$ $!

Change Business Case !

1.  Impact on project costs!Cost = (effort hours/staff productivity) * staff rate!

2.  Impact on project duration!Duration = (effort hours/staff production)/staff availability!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!

54!

Page 54: Scope or: How to Manage Projects for Organization Success

$ $!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!

1.  Impact on project costs"Cost = "(effort hours/staff productivity)"* staff rate!

2.  Impact on project duration�Duration = "(effort hours/staff productivity)"/staff availability!

!

•  Project Human Resource�Management!

!

Change Business Case - exercise!

As the project manager you rely on the work breakdown structure that was built by each subject matter expert to build your activity sequence, network diagram, resource requirements, time and cost estimates, critical path dependencies, schedule, and budget.!You have just been told the resource who built the estimate for the work breakdown structure is not available for the project. A replacement has been identified and will join the project.!You note that the replacement has a lower hourly rate than the original, however, the replacement has less experience (estimated at 40% less experience) and is only available 50% of the time. !Using the details below and the formulas to the left, how can you quantify the impact the replacement will have on the project cost and the project duration?!!

Original resource:!

Substitute resource!

Staff production or productivity !

1! .6 (.4 less effective than original)!

Staff rate ! $350! $170!

Effort! 40 (fulltime)! 50%!

55!

Page 55: Scope or: How to Manage Projects for Organization Success

$ $!

Project Human Resource Management •  Motivation •  Roles and responsibilities •  Team dynamics •  Milestones

56!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!

Project Human Resource Management!

Page 56: Scope or: How to Manage Projects for Organization Success

$ $!

Project Human Resource Management!

How does individual motivation affect estimated performance!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!•  Motivation!•  Roles and

responsibilities!•  Team dynamics!•  Milestones!

Triple Constraint!

Cost!

Scope!

Tim

e!Customer

Satisfaction!

Qu

alit

y!Risk!

57!

Page 57: Scope or: How to Manage Projects for Organization Success

$ $!

If you rely on people you need to rely on motivation!

Motivation 1. Intrinsic 2. External

Satisfaction 1. Achievement 2. Recognition 3. Work itself 4. Responsibility 5. Advancement 6. Growth

Triple Constraint!

Cost!

Scope!

Tim

e!

Customer Satisfaction!

Qu

alit

y!Risk!

58!

Page 58: Scope or: How to Manage Projects for Organization Success

$ $!

If you rely on people you need to rely on motivation!

Source: http://www.flickr.com/photos/creativetallis/3457121970/!

Motivation 1. Intrinsic 2. External

Satisfaction 1. Achievement 2. Recognition 3. Work itself 4. Responsibility 5. Advancement 6. Growth

59!

Page 59: Scope or: How to Manage Projects for Organization Success

$ $!

If you rely on people you need to rely on motivation!

Source: http://maaw.info/ArticleSummaries/ArtSumHerzberg6803.htm!

Factors that lead to extreme dissatisfaction! Factors that led to extreme satisfaction!

60!

Page 60: Scope or: How to Manage Projects for Organization Success

$ $!

If you rely on people you need to rely on motivation!

Triple Constraint!

Cost!

Scope!

Tim

e!

Customer Satisfaction!

Qu

alit

y!Risk!

61!

Page 61: Scope or: How to Manage Projects for Organization Success

$ $!

Project human resource management!

1.  Outline top skills and goals needed in the role!

a) Top 3 skills expected !b) Top 3 skills to develop!

2.  Establish a rating criteria and inputs used for the rating!

3.  Share assessment criteria with sponsor, prime, sub-prime for mutual evaluation!

62!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!•  Motivation!•  Roles and

responsibilities!•  Team dynamics!•  Milestones!

Page 62: Scope or: How to Manage Projects for Organization Success

$ $!

Project human resource management!

1.  At the kickoff let the team build the rules of engagement!

a) Communication expectations!b) Risk identification!c) Meeting protocol!d) Knowledge management!

2.  Skills register!3.  Project team�

(sub-contractor) HR rating!4.  Social media!

63!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!•  Motivation!•  Roles and

responsibilities!•  Team dynamics!•  Milestones!

Page 63: Scope or: How to Manage Projects for Organization Success

$ $!

Project human resource management!

1.  Identify milestones !2.  Identify key

accomplishments along the project lifecycle!

3.  Align milestones to human resource ratings!

4.  Identify and communicate new risk !

5.  Identify achievements and recognition!

6.  Archive!7.  Pause!

64!

•  Business Case !•  Bait and Switch!•  Triple Constraint!•  Formulas!•  Project Human Resource�

Management!•  Motivation!•  Roles and

responsibilities!•  Team dynamics!•  Milestones!

Page 64: Scope or: How to Manage Projects for Organization Success

$ $!

Why business initiatives fail: people!

1.  The Project Challenge!

2.  Scope, Plan, Manage, and Measure!

3.  Change Business Case!

65!

% of Firms

36%

41%

43%

44%

44%

46%

54%

65%

72%

82%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90%

IT Perspective not Integrated

Silos/No Horizontal Process View

No Organizational Change Plan

Scope Expansion / Uncertainty

Business Case not Compelling

Inadequate Sponsorship

Unrealistic Expectations

Poor Project Management

Resistance by Employees

Project Team Lacked Skills

Source: Deloitte CIO Survey % of Firms

36%

41%

43%

44%

44%

46%

54%

65%

72%

82%

0% 10% 20% 30% 40% 50% 60% 70% 80% 90%

IT Perspective not Integrated

Silos/No Horizontal Process View

No Organizational Change Plan

Scope Expansion / Uncertainty

Business Case not Compelling

Inadequate Sponsorship

Unrealistic Expectations

Poor Project Management

Resistance by Employees

Project Team Lacked Skills

Source: Deloitte CIO Survey

•  Organizational Process Assets!

•  Enterprise Environment Factors!

•  Change Readiness!•  Impact Analysis!•  Stakeholder Analysis!•  Communication Plan!•  Risk Register!

Page 65: Scope or: How to Manage Projects for Organization Success

•  Thoughts?!•  Questions?!•  Contact:!

www.TobyElwin.com!