The Hazardous Waste Generator Improvements Rule Proposal Analysis of the provisions and what they mean for you.

The Hazardous Waste Generator Improvements Rule Proposal

Embed Size (px)

Citation preview

Page 1: The Hazardous Waste Generator Improvements Rule Proposal

The Hazardous Waste

Generator Improvements Rule Proposal

Analysis of the provisions and what they mean for you.

Page 2: The Hazardous Waste Generator Improvements Rule Proposal

Meet Your Moderator

James Ciccone

Page 3: The Hazardous Waste Generator Improvements Rule Proposal

During this Webinar

All lines will be muted.

Communicate via the questions tab in your

webinar panel.

Unanswered questions will be responded to after

the webinar.

Webinar recording and slides will be emailed to

you tomorrow.

Page 4: The Hazardous Waste Generator Improvements Rule Proposal

Meet Your Presenter

Geraldine “Gigi”

DambrevilleEnvironmental Health and Safety

Consultant,

Triumvirate Environmental Inc.

Page 5: The Hazardous Waste Generator Improvements Rule Proposal

RCRA Overview

Current Issues

Proposed Rule Overview

7 Major Components

Wrap Up/Q&A

Rule Process & Schedule

Agenda

Page 6: The Hazardous Waste Generator Improvements Rule Proposal

How Concerned

Are You About

the Proposed

Regulation?

Poll Question

Page 7: The Hazardous Waste Generator Improvements Rule Proposal

The Resource Conservation and

Recovery Act of 1976:

Originally conceived as a law

addressing municipal trash

disposal, Subtitle C of RCRA

was included to give the U.S.

Environmental Protection

Agency (EPA) the authority to

regulate hazardous waste. This

includes the generation,

transportation, treatment,

storage, and disposal of

hazardous waste.

RCRA and Generators

Page 8: The Hazardous Waste Generator Improvements Rule Proposal

HSWA continued where RCRA, Subtitle C left off,

including: adding mandates for the regulation of small

quantity generators, restrictions on land disposal of

hazardous waste, regulation of underground storage tanks

(USTs), and corrective action provisions to prevent RCRA

facilities from becoming Superfund sites.

The Hazardous and Solid Waste

Amendments of 1984:

HSWA and Generators

Page 9: The Hazardous Waste Generator Improvements Rule Proposal

History of the Rule

• Hazardous Waste Generator Program

evaluation – April 2004

• Hazardous Waste Determination Program

evaluation – 2013

• Hazardous Waste Generator Proposed Rule

– 2015

Page 10: The Hazardous Waste Generator Improvements Rule Proposal

40 CFR Parts 260, 261,

263, 264 mainly

Federal register notice

September 25th, 2015

Comment period ended

December 24th,2015

Proposed

Regulations

Page 11: The Hazardous Waste Generator Improvements Rule Proposal

Generators

Transporters

Treatment, Storage and Disposal Facilities (TSDFs)

• Part 261- Waste Identification

• Part 262- Generator Requirements

• Part 263- Transporter Requirements

• Part 264- 265- TSDF Requirements

• Part 266- Recycling

• Part 268- Land Disposal Restrictions

• Part 270- TSDF Permitting

• Part 271- State RCRA Programs

40 CFR Parts: 260-281

Who’s Covered Under State &

Federal RCRA Regulations?

Page 12: The Hazardous Waste Generator Improvements Rule Proposal

The amount and type of hazardous waste generated in a given calendar month will

determine your “generator status”.

Large Quantity Generators (LQGs)

Small Quantity Generators (SQG)

Conditionally Exempt Small Quantity Generators (CESQGs)

Generator Status

Page 13: The Hazardous Waste Generator Improvements Rule Proposal

RCRA Overview

Current Issues

Proposed Rule Overview

7 Major Components

Wrap Up/Q&A

Rule Process & Schedule

Agenda

Page 14: The Hazardous Waste Generator Improvements Rule Proposal

Issue #1Regulations

are Confusing

Page 15: The Hazardous Waste Generator Improvements Rule Proposal

Issue #2Lack of Flexibility for Operators of

Facility with Different Generator

Status

Page 16: The Hazardous Waste Generator Improvements Rule Proposal

Issue #3Lengthy Contingency Plan Requirements &

Lack of Recordkeeping Requirements

Page 17: The Hazardous Waste Generator Improvements Rule Proposal

Issue #4Mismanagement

of Waste from

Generators

Page 18: The Hazardous Waste Generator Improvements Rule Proposal

RCRA Overview

Current Issues

Proposed Rule Overview

7 Major Components

Wrap Up/Q&A

Rule Process & Schedule

Agenda

Page 19: The Hazardous Waste Generator Improvements Rule Proposal

• Goals of the Proposed Rule

• Where Will the New

Regulations Live?

Proposed Rule

Overview

Page 20: The Hazardous Waste Generator Improvements Rule Proposal

Goals of the

Proposed Rule1. Reorganize the regulations to make them more user friendly and

enable improved compliance

2. Provide greater flexibility for hazardous waste generators to

manage waste in a cost-effective manner

3. Strengthen environmental protection by addressing identified gaps

in the regulations

4. Clarify certain components of the hazardous waste generator

program to address ambiguities and foster improved compliance

Page 21: The Hazardous Waste Generator Improvements Rule Proposal

40 CFR Part 260 – Standards for

the classification of hazardous

wastes generators and specific

Types of Hazardous Waste

Management Facilities

Part 262 – Management

Standards for Hazardous Waste

Where Will the

Regulations Live?

Page 22: The Hazardous Waste Generator Improvements Rule Proposal

RCRA Overview

Current Issues

Proposed Rule Overview

7 Major Components

Wrap Up/Q&A

Rule Process & Schedule

Agenda

Page 23: The Hazardous Waste Generator Improvements Rule Proposal

1. Consolidation of CESQG Waste at LQG’s:

• CESQG’s and LQG’s must be under the control of the same

person

• CESQG to be called VSQG

• Eliminate RCRA permit requirement to accept CESQG’s waste

• Additional option for CESQG’s to manage their waste

• Increased training and documentation

• Potentially decrease generator cost

Proposal #1

Page 24: The Hazardous Waste Generator Improvements Rule Proposal

2. Episodic Generation for CESQG’s and SQG’s:

• Only allowed once a year

• Would not change current generator status

• Would not have to complete biennial requirement

• Notification of planned and unplanned events

• Labeling requirement for accumulation of episodic waste

• 45 days from initiation and completion of episodic event

Proposal #2

Page 25: The Hazardous Waste Generator Improvements Rule Proposal

3. Emergency Planning and Preparedness:

• Only applicable to LQG’s and SQG’s

• Require generators to make arrangements with local LEPC’s first

• If no local LEPC, generators to make arrangements with local Fire

Departments

• NEW LQG’s to submit executive summary to LEPC rather than full

Contingency plans

• Eliminating employee personal information in plans

Proposal #3

Page 26: The Hazardous Waste Generator Improvements Rule Proposal

4. Labeling changes:

• Applicable to SQG’s, LQG’s and Transporters

• Marking containers with Hazardous waste codes

• Make it easier for TSDF’s to identify content

• Relevant areas on site: SAA’s, CAA’s, transfer facilities

consolidating waste from different generators

• Labeling requirement for tanks, drip pads and containment buildings

• Recordkeeping requirements for tanks, drip pads, containment

building for 90 and 180 day storage

Proposal #4

Page 27: The Hazardous Waste Generator Improvements Rule Proposal

5. Reporting Requirements:

• Biennial reporting required only for LQG’s

• Reporting for all hazardous waste generated

during reporting year

• Not applicable to CESQG’s and SQG’s under

episodic rule

• Allow new source code for CESQG’s transferred

waste

Proposal #5

Page 28: The Hazardous Waste Generator Improvements Rule Proposal

6. Satellite Accumulation areas:

• Prohibiting incompatible waste to be mixed in the

same container

• Limited exception for keeping containers closed at

all times at SAA’s

• Modify labeling to include flexibility on hazard

category type

• Clarify the “three day” rule

Proposal #6

Page 29: The Hazardous Waste Generator Improvements Rule Proposal

Proposal #7

7. Closure:

• Require closure as landfill for when LQG’s

accumulating in containers fail to clean close

• Notification to EPA or authorized state 30 days

prior to closing an accumulation area or within 90

days after closure of unit or facility

Page 30: The Hazardous Waste Generator Improvements Rule Proposal

• Documenting hazardous waste determinations

• SQG re-notification

• Labeling

• Notification of closure

• Biennial reporting for the whole year

• Executive summary for contingency plan

More Stringent Rules

Page 31: The Hazardous Waste Generator Improvements Rule Proposal

• CESQG consolidation

• Episodic generation

• Waiver from 50-foot rule

Less Stringent Rules

Page 32: The Hazardous Waste Generator Improvements Rule Proposal

EPA Considers certain proposed provisions to be more

stringent than current regulations

• More stringent regulations – all states will be required to adopt

the final rule

• Less stringent regulations – states may but are not required to

adopt federal regulations

No final authorization on base State RCRA program

• Will be effective in these states on the effective date for the final

rule, even before the state adopts it

State Adoption

Page 33: The Hazardous Waste Generator Improvements Rule Proposal

RCRA Overview

Current Issues

Proposed Rule Overview

7 Major Components

Wrap Up/Q&A

Rule Process & Schedule

Agenda

Page 34: The Hazardous Waste Generator Improvements Rule Proposal

Publication of the final rule in

the CFR• Administrator has already signed the

proposed rule on 8/31/15

• This was published on 9/25/15; 80

FR58014

There was a 60 Day Comment

Period• That was extended to 12/24/15

• There have already been many

requests for extension

Review of Public Comment• After review the EPA will begin to finalize

the rule

Rule Process

& Schedule

Page 35: The Hazardous Waste Generator Improvements Rule Proposal

RCRA Overview

Current Issues

Proposed Rule Overview

7 Major Components

Wrap Up/Q&A

Rule Process & Schedule

Agenda

Page 36: The Hazardous Waste Generator Improvements Rule Proposal

Prepare yourself for drastic changes

Understand how you may be affected

Follow up for more information

What’s next?

Wrap Up

Page 37: The Hazardous Waste Generator Improvements Rule Proposal

QUESTIONS?

Page 38: The Hazardous Waste Generator Improvements Rule Proposal

Thank You For Attending!You Will Receive:

• A recording of this presentation and

a copy of this presentation

• A link to a short survey

• A gift to help ensure that your

hazardous waste program is fully

compliant

Geraldine “Gigi” Dambreville

[email protected]

www.Triumvirate.com