14th Australian Tunnelling Conference Tim Parker | Project Director City & Southwest | Sydney Metro

Tim Parker - Transport for NSW

Embed Size (px)

Citation preview

Page 1: Tim Parker - Transport for NSW

14th Australian Tunnelling Conference

Tim Parker | Project Director City & Southwest | Sydney Metro

Page 2: Tim Parker - Transport for NSW

Overview

1. Introduction and Context

2. Sydney Metro Overview

3. Northwest update

4. City & Southwest tunnelling

5. Q&A

Page 3: Tim Parker - Transport for NSW

More than 65 km

31 metro railway stations

Two stages

Northwest 15 km new twin

tunnel

City & Southwest 16 km new

twin tunnel

Page 4: Tim Parker - Transport for NSW

Sydney Metro Benefits

Page 5: Tim Parker - Transport for NSW

Customer Experience

Page 6: Tim Parker - Transport for NSW

Sydney Metro

Stage 1 – 36km

Open first half of 2019

8 new stations; 5 upgraded

4,000 car spaces

Page 7: Tim Parker - Transport for NSW

Cudgegong

Tunnels & Station Civil (TSC)

Design & construct Driven tunnels, station excavation,

ground support

Surface/Viaduct Civil (SVC)

Epping Bella Vista Cudgegong

Epping Bella Vista Chatswood

Design & construct Surface civil infrastructure (including viaduct), Bella

Vista to Cudgegong

Epping to Chatswood Rail Link (ECRL) existing infrastructure interface

Operations, Trains & Systems (OTS) PPP Partially privately financed (with substantial State contribution)

Deliver railway systems (new and upgraded), trains, stations & precincts Operate services & stations, maintain all assets

Early Civil Works by TfNSW

Chatswood

Epping to Chatswood Rail Link (ECRL) enabling works by TfNSW

Integration Activities by TfNSW

Sydney Metro Northwest delivery

Page 8: Tim Parker - Transport for NSW

Sydney Metro Northwest

Industry participants – sectors and countries

Page 9: Tim Parker - Transport for NSW

Tunnelling (TSC)

Page 10: Tim Parker - Transport for NSW

Tunnelling

More than 2.5 million tonnes of rock excavated

100% crushed rock recycled

98,184 concrete segments

Page 11: Tim Parker - Transport for NSW

98,184 concrete segments

16,290 waterproof rings

More than 3,600 tonnes of cement

18 months, 635,000 working hours

Tunnelling (TSC) – Pre-cast Facility

Site was demobilised as of March 2016

Page 12: Tim Parker - Transport for NSW

State of the art launch gantries

from Dubai

Gantries to lift segments into

place – enabling main arterial

roads to remain open during

construction

121 piers

1,200 segments

124 spans

Skytrain - SVC

Page 13: Tim Parker - Transport for NSW
Page 14: Tim Parker - Transport for NSW

Sydney Metro: City & Southwest

Chatswood to Sydenham EIS exhibition Q2

2016

Start construction 2017

Start major contract procurement Q3- Q4 2016

Sydenham to Bankstown EIS exhibition 2017

First TBM 2018

Operations 2024

Page 15: Tim Parker - Transport for NSW

Metro Alignment Design - Theoretical

Stations equally spaced

Slight vertical between each station

Tunnels are in parallel

Straight alignment – no curves

If curves – long radius

Page 16: Tim Parker - Transport for NSW

Metro Alignment Design - Reality

Natural constraints

– Geotechnical condition

– Land levels

Station locations

– Customer based

– Land availability

Page 17: Tim Parker - Transport for NSW

Natural Constraints

Geotechnical Investigation

Harbour Crossing

Other tunnels

Page 18: Tim Parker - Transport for NSW

Ground Investigation CBD

Stage 1

– 26 Land boreholes

– 22 Marine boreholes

– 30 Cone Penetration Testing (CPT)

Stage 2

City

– 29 Boreholes

– 13 CPT

– 10 test pits

Southwest

– 128 investigation holes

Page 19: Tim Parker - Transport for NSW

Ground Investigation Harbor

Planned

• Geophysics

• Diamond coring + Standard Penetration Test (SPT)

• In-situ stress testing

Additional

• CPT testing

• Denison Sediment sampling

• Upper sediment testing

• Further Geophysics

• Seismic

• Borehole tomography

• Resistivity

Page 20: Tim Parker - Transport for NSW

Natural Constraints

Page 21: Tim Parker - Transport for NSW

Geology

Page 22: Tim Parker - Transport for NSW

Underground Constraints

Other tunnels

Maximum gradients

Underground stations – Passenger focused

Utilities

Rock anchors

Page 23: Tim Parker - Transport for NSW

Artist’s impression of Martin Place Interchange

Page 24: Tim Parker - Transport for NSW
Page 25: Tim Parker - Transport for NSW

Harbour Crossing Alignment

Option 1 – Rock TBM

Deep sediments

Option 2 – Soft ground TBM

Option 3 – Shallow IMT

Page 26: Tim Parker - Transport for NSW

Harbour Crossing Alignment

Page 27: Tim Parker - Transport for NSW

Metro Alignment Design Reality

Page 28: Tim Parker - Transport for NSW

Metro Alignment Design Reality

Page 29: Tim Parker - Transport for NSW

Contracting strategy – City & Southwest

Page 30: Tim Parker - Transport for NSW

Reference

Tunnelling

Strategy

Page 31: Tim Parker - Transport for NSW

Harbour – Ground Treatment

Page 32: Tim Parker - Transport for NSW

TSE Procurement Strategy

• Progressive Industry Engagement

• Early Release of Design and Investigation Results

• Expression of Interest to respond to Technical Aspects

• Intensive Interactive Tender Process

Page 33: Tim Parker - Transport for NSW

TSE

Currently out to tender

Two consortia shortlisted and invited to tender

– The John Holland CPB Ghella Joint Venture, made up of John

Holland Pty Ltd, CPB Contractors Pty Ltd and Ghella Pty Ltd

&

– The Ferrovial, Acciona Ltd and BAM Joint Venture, made up of

Ferrovial Agroman (Australia) Pty Ltd, Acciona Infrastructure

Australia Pty Ltd and BAM International Australia Pty Ltd

Tender closes at the end of the year

Tender will be awarded in mid 2017

Page 34: Tim Parker - Transport for NSW

Thank you