TW@ESI 18 th September 2016 Hope all of you had a good weekend The following is a record of what was done during the past week and a forecast of the next week.....

TW@ESI 18th September 2016

Embed Size (px)

Citation preview

Page 1: TW@ESI 18th September 2016

TW@ESI18th September 2016

Hope all of you had a good weekend

The following is a record of what was done during the past week and a forecast of the next week.....

Page 2: TW@ESI 18th September 2016

A General Note before we start- Some General Notes•During the past week me and Trevor were at a industrial iOT conference in Verona... It was extremely interesting and I urge all to read the ideas I have been posting on this group chat•Two weeks I gave you last years company objectives and their status- I would like some of your feedback to compile ESI’s objectives for next year- I ask all to stop and reflect about these objectives•Clifton is on a SAVANT training course this week in the UK – We wish him luck and success on this course

Page 3: TW@ESI 18th September 2016

A General Note before we start-On 30th September , I am starting a campaign on close out project meetings (I have invited the concerned people to this meeting) – I need everyone to give their input for these meetings- we will start by the projects •16_011 University of Malta Intruder alarm for the Gateway Building•16_017 BMIT Controlled access through fire door at SCM •12_027_Parliament Intruder alarm system

Page 4: TW@ESI 18th September 2016

A General Note before we start- New premisesThe new premises.... The offices are looking really nice and Crisp now!! Thanks to all for you efforts.. It is now up to all of us to take care of our new offices and respect the huge investment done by our director. A bit more to do including list below- lets make an effort and conclude:a) Air Conditioning controls with JACEb) Automation system integrated with lighting and

the other systems installed

Page 5: TW@ESI 18th September 2016

Projects and deadlines• 15_044_Hilton_Restaurant_Kitchen_AHU and

15_034_Hilton_Calorifier_Monitoring. We are targeting to complete in the next weeks

• 15_008 - Aurobindo PH02 BMS- We need to make a big effort to close off what is pending – especially the KNX interface

• 12_027- Parliament – we have handed over the Intruder- prosit CCI/JPO and SAI... We need to now update Maxpro, integrate ProWatch and conclude all documentation

• 14_069- Q019 AS410 – we are currently working on requests for information from the client

• 14_069- Q021_TF4- We are working on the panel design to allow us to go to panel construction now

Page 6: TW@ESI 18th September 2016

Projects and deadlines• 13_070- SCM Lagoona Plant room We need to conclude all pending

installation works – we will also try to finish the programming but commissioning will be on hold till the client asks us to continue

• 15_038_new_HA_Ovt and 15_026_Apap Residence are two home automation projects scheduled for Q1 2017 – we have nearly completed panel design and it is now down to panel build (for Apap we are working on the second DDC/Lighting panel)

• 16_023_GGY- is another home automation project which is on a much faster track- the lighting will have to be commissioned in September 2016- we have fixed the panel on site and will now terminate and commission it

• 14_083_Intercontinental – We have started works to start up the plant and start commissioning here- software development has also now advanced on this project. We will also start design work on the second Pool Panel

Page 7: TW@ESI 18th September 2016

DesignLast week• Completed City Gate As Built updates• Nestle LCP panel drawing draughting• Intruder Panels templates draughting for CCI (still to conclude &

Distribute)• Concluded Exercise re: Panel Quoting• OVT – Prepared labels etc for Panel Build startup• OTM – SAS000768• Nestle – new small Lighting Panel LCP (prepared Points list & Panel

Design sketches for NFH draughting)• Nestle – compiled & released Panel Material• Sliema Graham Apts - compiled & released Panel Material• Met CCi re: Intruder Panels templates, sketched for NFH draughting

Page 8: TW@ESI 18th September 2016

DesignNext Week:• Intruder Panels templates (conclude & Distribute)• Intercontinental Pool Panel – Draughting of

P&IDs, Panel Design• SCM Lagoon – check source of info for Mode 4c

for SAA• Intercontinental Pool Panel – (prepare Points List,

P&IDs, Panel Design sketches for NFH drafting)• OTM – Q021 5DP02-EXT – Start Panel Design

Page 9: TW@ESI 18th September 2016

InstallationThis past week: • Maintenance works at offices• Completed plant room DAC installation at parliament• Terminated Lighting and Intruder panel at GGY• Assisted SAi at SCM CCTV Next week: • Start terminating some field devices at GGY• OTM, preparation for panel modification• Assisting Claudio at Aurobindo• Fix irrigation valves at offices• Fix additional frames at offices

Page 10: TW@ESI 18th September 2016

Panel BuildThe following is our plan for a busy Panel build

Target panel build Completion Date

Ovt Residence Portomaso One DDC panel 28-Sep-16Nestle Showroom Small wall mounted panel 4-Oct-16Intercontinental HVAC Panel Wall mounted panel 12-Oct-16OTM Additions 2 door panel floor mounted 25-Oct-16FM Env Control Panels 1 panel 28-Oct-16RSM DALI 4 lighting control panels 11-Nov-16Graham Sliema Apts Blk 4 DDC panels and 4 DAC panels 23-Nov-16

Project name

Page 11: TW@ESI 18th September 2016

Mater DeiThe team at Mater Dei is going through some though changes with the

resignation of Simon Florian and most recently of Michael Abdilla.

The whole team at MDH have to dig deep and work as a team until we find the required replacements for these team members. If any of you out there know of people who can join the MDH team as technicians/electricians, we presently have two vacancies to fill- please give them my contacts so that they may apply!!

Page 12: TW@ESI 18th September 2016

Development and Commissioning• Parliament project - NEXT IS TO TACKLE SNAGS ON

PARLIAMENT so as to close off the whole job • The last issues on the DAC for SCM PH2- IT IS NOW A

PRORITY AND WE NEED TO GET COMPLETION CERTIFICATION

• 12_043_Life Sciences – we need to call for an inspection of snags to close everything down- we also need to start scripting on the tenant building module

• SCM PH2 needs also some attention on the tagging purchase order for the BMS- CVA is to work on this

• The Bosch HSDK interface is well advanced and we have documented and we should shortly be expecting to go overseas to commission

Page 13: TW@ESI 18th September 2016

Development and Commissioning• OTM on going works and some large orders

(AS410 upgrade and TF4 )• Aurobindo We are very nearly done here and

expect to conclude shortly. • 14_081_Siggiewi School- Lets move on

concluding issues related to Data acquisition and analysis.... We need good data to prove our systems- CCI has done a plan- stick to it- I need feedback from CCI as to where we are on this

• 13_031_CCA- still issues with values on ILPS!!

Page 14: TW@ESI 18th September 2016

Sales and Business DevelopmentWe have been working on a quote for Actavis ,

offer for Oil Tanking Malta (supply only of field devices) and an offer for RSM offices - security

Page 15: TW@ESI 18th September 2016

Team ESI• I urge you all to follow this blog and keep up to date with

what is happening at ESI • I await all your feedback on all the ESI discussions –

without this feedback – this group will not be alive and fruitful- so take time off from your busy agendas, read what we have and participate and comment

• Please urge and assist all you colleagues to have a linkedin profile and join this discussion group

• Share your thoughts and participate actively on this blog- make this YOUR blog- your comments on this blog are always welcome and eagerly awaited for

Page 16: TW@ESI 18th September 2016

Team ESI

• Lets all work to get the work done on time, on budget and to the required quality

• We need to communicate, pull the rope in the same direction to make our projects a success and profitable