CV
FAHAD ALQAHTANI
SummaryFAHAD professional electrical engineer more than 32 years of different companies also with different disciplines and a lot of projects as construction and electrical and Infrastructure start with Saudi electrical company since 1982 till 2008 thru that Period handle a lot of responsibility for designing and planning and construction also leading of different group and work to solve a lot of Technical of issues with design and construction, from Feb,2008 till now work with most ARAMCO project as consulting (electrical) with Mega project oil & gas such as Khurais project and Hawaiya project and wasit project and shodguam project, currently with king Abdul-Aziz cultural world center in Dhahran.I have Work with the committee for the development of jobs needed Saudi by the labor market, a member of the technical colleges with the labor office in Saudi Arabia.Registered as GES+ projects (approved from SAPMOD).
ObjectivesThru more than 32 those years of experiences I am build good relation with team or location or projects I was part of it, due to the objective for build good relation that mean you will be close each other , To overcome all obstacles To achieve the desired goal, the main reason to achieve that, you should Listen to them and keep good relation with them, to be a good leader for team or your project.
EducationDIPLOMA,ELECTRICAL ENGINEERElectrical and Power TransmissionRiyadh technology collage
Experience 1Electrical engineer FROM DEC,1982 TILL FEB,2008Starting with operation Dev. In Abqaiq to cover all abqaiq and villages to operate system & distribution 13.8KV to feed all customers.•To work with E&C to upgrade system in Abqaiq area from over headline 13.8 KV to underground system. To work with SARAMCO (PDD) as SEC Rep. to finalize the connecting interfaces point between SARAMCO system and SEC net work.•Work with the committee for the development of jobs needed Saudi by the labor market, a member of the technical colleges with the labor office in Saudi Arabia.•Supervise the training of staff and the creation of new entrants to the Saudi Electricity Company.•Work with team to supervision and upgrade all systems in the capital city (Riyadh) 13.8kv & 33kv, 132kv
Experience 2Senior construction sepicilste FROM FEB,2008 TILL APR,2012KHURIAS PROJECT: (SAPMT) Work with infrastructure Div. at Khurais mega project. Handling the residential and industrial (RIC) as Sit Superintendent(Electrical) Evaluate Technical Offers and review documents and drawings provided by vendor. Review Technical Query sheets for clarification. Coordinate with QC& PID and CSD for any technical issues.• Pre-commissioning& commissioning. Coordinate with SEC for interfaces with SARAMCO for 115KV source, for RIC main S/S. Work for the close out of project. Work for the dismantling of old GOSPs in Khurias.KAUST (THUWAL) PROJECT:• Supervision of activities for the residential of KAUST as Site Superintendent (Electrical).HAWIYAH PROJECT: Work for the close out of the project for the remaining activates. Work on the dismantling for all the contractors Area.SOUTHERN AREA (SHUDGUAM) Work to replace and upgrade old Motors at SHUDGUAM PLANT.Project Experience in this Position: SMPCAD
Experience 3 FROM MAY,2012 TILL NOV,2015
WASIT PROJECTS DEPT / EARLY WORK & PROG COORD PROJECTS DIV. (•Construction supervision.•Study the designing and solve any issues with QC&PID and CSD•Pre-commissioning& commissioning.•Work with contractors to close all punch list Items, to singe the final MCC.• Work with proponent and other related to solve any issues at the site.•Work with suppliers and manufacturers to expedite the delivery of materials to the site. •Study the new designing of project, and revision of IFC, •Work on the red line Drawing, and as built Drawing.•Work to finalize the (SPDP) (NMR603) with all manufacturers.•Solve all logistics issues at the site. Work on closeout of projectWASIT PROJECTS DEPT / PROJECT CONTROL & SUPPORT DIV:• Work for the proposal of Solar Lighting system for the main road to -Wasit Gas Plant (17.5KM)•Work To solve intersection between new bridge to our gas plant, with high way and the existing 115 KV overhead line with SEC. ISF)
Experience 4 FROM NOV,2015 till now
Senior construction specialistCurrently work with ARAMCO team (PMT) as consultant of construction cover all electrical activates with king Abdul-Aziz cultural world center
Personal InformationO Birthday :1961/12/16O Location: Saudi ArabiaO Email: [email protected] Email: [email protected] https://sa.linkedin.com/in/fahad-alqahtani-
22068979O Cell phone :0547809796O Cell phone :0505933845