Heuristic Test Strategy Model
(James Bach Model)
By Nadeeshani Aththanagoda
10/6/10
Heuristic Test Strategy Model
A set of patterns for designing a test strategy.
what to think about when creating tests.
self-directed learningfully conscious testing among
professional testers.
10/6/10
What is it? resources, constraints, and other
forces
things that intend to
test
rules, values, and
sources
10/6/10
Con’t……Project Environment - Resources,
constraints, and other forces in the project that enable us to test
Product Elements- Things that intend to test
Quality Criteria- Rules, values, and sources that allow you as a tester to determine if the product has problems.
Test Techniques- Strategies for creating tests.
Perceived Quality- The result of testing
10/6/10
Heuristic Test Strategy Model categories
General Test TechniquesProject EnvironmentProduct ElementsQuality criteria categories
◦ Operational criteria◦ Development criteria
10/6/10
General Test Techniques1. Function Testing2. Domain Testing3. Stress Testing4. Flow Testing5. Scenario Testing6. Claims Testing7. User Testing8. Risk Testing9. Automatic Testing
10/6/10
1.Functional TestingTest what it can do Identify things that the product
can do Determine how you’d know if a
function was capable of working Test each function, one at a
time See that each function does
what it’s supposed to do and not what it isn’t supposed to do
10/6/10
2.Domain TestingDivide and conquer the data Look for any data processed by
the product Look at outputs as well as inputs Decide which particular data to
test with Consider combinations of data
worth testing together
10/6/10
3.Stress TestingOverwhelm the product Look for sub-systems and
functions that are vulnerable to being overloaded or “broken”.
Select or generate challenging data, or resource constraint conditions to test with: e.g.,
large or complex data structures, high loads, long test runs, many test cases, low memory conditions.
10/6/10
4.Flow TestingDo one thing after another Define test procedures or high
level cases that incorporate multiple activities connected end-to-end.
Don’t reset the system between tests.
Vary timing and sequencing, and try parallel threads.
10/6/10
5.Scenario Testing Test to a compelling story Begin by thinking about
everything going on around the product.
Design tests that involve meaningful and complex interactions with the product.
A good scenario test is a compelling story of how someone who matters might do something that matters with the product.
10/6/10
6.Clams TestingVerify every claim Identify reference materials that
include claims about the product (implicit or explicit).
Analyze individual claims, and clarify vague claims.
Verify that each claim about the product is true.
If you’re testing from an explicit specification, expect it and the product to be brought into alignment.
10/6/10
7.User Testing Involve the users Identify categories and roles of
users. Determine what each category
of user will do (use cases), how they will do it, and what they value.
Get real user data, or bring real users in to test.
Otherwise, systematically simulate a user
Powerful user testing is that which involves a variety of users and user roles, not just one.
10/6/10
8.Risk TestingImagine a problem, then look for it. What kinds of problems could
the product have? Which kinds matter most? How would you detect them if
they were there? Make a list of interesting
problems and design tests specifically to reveal them.
10/6/10
9.Automatic TestingRun a million different tests Look for opportunities to
automatically generate a lot of tests.
Develop an automated, high speed evaluation mechanism.
Write a program to generate, execute, and evaluate the tests.
10/6/10
Project Environment1. Customers2. Information3. Developer Relations4. Test Team5. Equipment & Tools6. Schedule7. Test terms8. Deliverables
10/6/10
Project EnvironmentCustomers-Anyone who is a client of the
test project. Information-Information about the
product or project that is needed for testing. Developer Relations-How you get
along with the programmers. Test Team-Anyone who will perform or
support testing.
10/6/10
Project EnvironmentEquipment & Tools -Hardware,
software, or documents required to testing Schedule-The sequence, duration, and
synchronization of project events‰ Test Items-The product to be tested
‰ Deliverables-The observable products of the test project
10/6/10
Product Elements1. Structure2. Function3. Data4. Platform5. Operations.6. Time.
10/6/10
Product ElementsStructure -Everything that comprises the
physical product. Function-Everything that the product
doesData- Everything that the product
processesPlatform-Everything on which the product
dependsOperations-How the product will be used.
Time-Any relationship between the product and time
10/6/10
Quality criteria categoriesA quality criterion is some requirement that defines what the product should be. By looking thinking about different kinds of criteria,
• Operational criteria• Development criteria
10/6/10
Operational criteria1. Capability2. Usability. 3. Security4. Scalability. 5. Performance6. Installability7. Compatibility.
10/6/10
Operational criteria
Capability-Can it perform the required functions?
Reliability-Will it work well and resist failure in all required situations?
Usability- How easy is it for a real user to use the product?
Security-How well is the product protected against unauthorized use or intrusion?
10/6/10
Operational criteriaScalability-How well does the
deployment of the product scale up or down? Performance-How speedy and
responsive is it? Installability-How easily can it be
installed onto its target platform(s)? Compatibility-How well does it work
with external components & configurations?
10/6/10
Development criteria1. Supportability.2. Testability.3. Maintainability4. Portability5. Localizability
10/6/10
Development criteriaSupportability-How economical will it
be to provide support to users of the product?
Testability-How effectively can the product be tested?
Maintainability-How economical is it to build, fix or enhance the product?
Portability-How economical will it be to port or reuse the technology elsewhere?
Localizability-How economical will it be to adapt the product for other places?
10/6/10
36 Letters……………..FDSFSCURA-general test
techniquesCIDTESTD-project environmentSFDPOT-product elementsCUUSSPICSTMPL-quality criteria
10/6/10
References