Upload
anurag-chatterjee
View
220
Download
1
Embed Size (px)
Citation preview
ARCHITECTURE PORTFOLiO BY ANURAG CHATTERJEE
INDEX
INDEX
FIRST YEAR PROJECTS
SECOND YEAR PROJECTa. RESIDENTIAL CLUB HOUSE
THIRD YEAR PROJECTSa. COMMERCIAL COMPLEX
b. HORTICULTURE CENTRE
FOURTH YEAR PROJECTa. MUSEUM
FIFTH YEAR DESIGN DISSERTATIONa. CENTRAL JAIL (CORRECTION CENTER)
....................
....................
....................
....................
....................
....................
Pg 1 - Pg 2
Pg 3
Pg 4 - Pg 8
Pg 9 - Pg 11
Pg 12 - Pg 18
Pg 19 - Pg 26
COLLEGE COMPETITIONa. SOCIAL SPACE FOR STUDENTS .................... Pg 27 - Pg 29
" I just don't want to make buildings, I wantto build the future "
PROFESSIONAL PROJECTa. UNIVERSAL HIGH SCHOOL AURANGABADAR. MANOJ VIJAN & ASSOCIATES 02, SAMBHAV DARSHAN, PLOT NO: 42, SECTOR 28, VASHI, NAVI MUMBAI 400703 PH NO. +91 2227668807
.................... Pg 30
1st YEAR
AIM: TO DESIGN A COMBINATION OF FLATPLATFORMS AND STEPS USING THERMOCOL
CONCEPT: CAVE ARCHITECTURE
AIM: TO CREATE FLATSPACES OF DIFFERENT LEVELSAND COVER THEM WITHTEXTURES
CONCEPT: RUSTICARCHITECTURE
MATERIALS USED ARE PINS,MATCH STICKS, HAYSTRAW, SAWDUST
AIM: TO MAKE ASCULPTURE USINGMODELLING CLAY
CONCEPT: THE NEWBORN HAND
MATERIALS RED COLOREDPLASTICINE CLAY
AIM: TO CREATE A 3DCOMPOSITION OUT OFUSED BOXES AND PAINTTHEM WITH A COLORSCHEME
HERE THE COLOR SCHEMEUSED IS SHADES OFYELLOW AS MAJORITY,SHADES OF BROWN ASINTERMEDIATE ANDSHADES OF BLACK ASMINORITY
1st YEAR
GRAPHICS DESIGN: SURFACEDEVELOPMENT
2nd YEAR
AIM: TO DESIGN A CLUB HOUSE FOR A RESIDENTIAL COMPLEX ON A PLOT OF 180M X90M OF WHICH ONLY HALF THE PLOT WAS TO BE USED
DESIGN CONCEPT: THEHUMAN EYE IS ONE OF THE MOSTCOMPLEX PARTS OF THE HUMANBODY. SO I TRIED TO CAPTURE ITSBEAUTY AND TURN IT INTOARCHITECTURE IN THIS PROJECT.
CONCEPT
ANALYSIS
GRAPHICAL REPRESENTATION
SITE PLAN
FIRST FLOOR PLANGROUND FLOOR PLAN
ANALYSIS
N S
W
E
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
WEST ELEVATION
3rd YEAR
COMMERCIAL COMPLEX AT GHATKOPAR ,MUMBAILOCATIONTHE SITE FOR MY PROJECT IS LOCATED INGHATKOPAR A COMMERCIAL HUB IN MUMBAI.THE SITE IS SURROUNDED BY OTHER COMMERCIALTOWERS, ALL OF THEM HAVE A RECTANGULAR ORSQUARE SHAPE.
CONCEPTUALSKETCHING AND 3DTHIS PROJECT IS NOT ENTIRELY BASED ON A CONCEPTBUT IS A MIXTURE OF INSPIRATION, EXPERIMENT OF ASIMPLE SHAPE BASED ON THE STUDY OF THESURROUNDING AND THEN HOW THE FUNCTIONAFFECTS THE DESIGN AND CHANGES MADE TO BESTSUIT THE FUNCTION. AS ALL THE OTHER STRUCTURESIN THIS AREA ARE SQUARE OR RECTANGULAR, I ALSODECIDED TO USE THE SAME FORM BUT IN A DIFFERENTWAY.
ENVOc
INSPIRATION:FALLING WATERS BYFRANK LLOYDWRIGHT
FINAL STRUCTUREAN ATTEMPT FOR ENERGYEFFICIENCYIN THIS PROJECT I ALSO TRIED TOEXPERIMENT WITH SOME GREENCONCEPTS BY PAYING ATTENTION TOTHE BUILDING COOLING BY USINGTWO METHODS.
1.USING VERTICAL VEGETATEDCOMPLEX WALLS (VCW) ON THEBUILDING.
2. BY USING A FLOOR PIPECOOLING SYSTEM FOR THEINTERNAL COOLING.THAT IS WHY I HAVE NAMED THISBUILDING AS "ENVO (ENVIRONMENT)COMMERCIAL CENTRE" OR IN SHORTENVO.c
generator room
shop
shop
shop
shop
shop
shop
reception
waiting lounge
1
1
1
1
1
ticket counter
to parking
3.7m wide road
3.7m wide road -0.2
- 0.2
0.8
0.2 0.2
0.4
0.2
0.4
0.6
0.8 0.6
watchmancabin
watchmancabin
lift duct
lift duct lift duct
lift duct lift duct
lift duct lift duct
road
ramp 0.2
lift duct lift duct
AHU12 sqm
-0.2
electrical sub-station
3rd YEAR
BUILDING COOLING CONCEPT
INSTEAD OF DIRECTLY COOLING THE BUILDING WITH THE HELP OF COLD AIR I HAVE PROPOSED THE USE OF COLD WATER FOR WHICHCHILLING TOWERS HAVE BEEN PROVIDED .THE COLD WATER CAN BE PASSED THROUGH THE PIPES UNDER THE FLOORING WITH THEHELP OF PUMPS AND CIRCULATED THROUGH OUT THE BUILDING. COOLING OF AIR DIRECTLY FROM AIR CONDITIONERS IS NOTGRADUAL AND AIR REMAINS COLD FOR LESS AMOUNT OF TIME . HOWEVER WATER REMAINS COLD FOR MORE AMOUNT OF TIME THUSKEEPING THE AIR IN CONTACT WITH THE FLOOR, ALSO COLD FOR MORE AMOUNT OF TIME BECAUSE OF WHICH THE CHILLING TOWERSNEED TO FUNCTION LESS NUMBER OF TIMES AND DURATION THAN DIRECT AIR CONDITIONERS.
CONCRETE FLOOR SLAB
20MM SCREEDON SLAB
INSULATION TO PREVENTHEAT CONDUCTION TOLOWER FLOOR
LAYING OF PIPES SCREED ON PIPES FINISHED FLOOR
GROUND FLOOR PLAN
ENVOc
NORTH WEST ELEVATION NORTH EAST ELEVATION SOUTH EAST ELEVATION
SOUTH WEST ELEVATION
sump
to level 1 parking
22 23 24 25 26 27 28
29 30 31 32 33 34 35 36 37 38 39 40 41 42
43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60
8.8M
8.4M
AHU
metre room
to level 2 parking
to ground level
C
C'
1 2 3 4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21
8.4M
2.8M 6M1.426M
10.2M
AHU
road road
3rd YEAR
ENVOc
shop
shop
4.7
shop
3.7m wide road
3.7m wide road
watchmancabin
watchmancabin
to parking
ramp
lift duct lift duct
open to ground floor
open to ground floor
open to ground floor
open to ground floor
LIFT LIFT
LIFT LIFT
road
restaurant
veg meals
cold store
dry store
kitchen fornon vegmeal
cold store
dry storepantry andwashing
generator room
3.7m wide road
3.7m wide road
watchmancabin
watchmancabin
8.4 8.4 8.4
8.4
8.4
9.4
9.4
9.4
9.4
9.4
9.4 to parking
ramp
lift duct lift duct lift duct lift duct
lift duct lift duct
lift duct lift duct
AHU12 sqm
terrace garden
terrace garden
terrace garden
pantry andwashing
service lift
road
LEVEL 2 BASEMENT PARKING PLAN LEVEL 1 BASEMENT PARKING PLAN
SECOND FLOOR PLAN
FIRST FLOOR PLAN
-8.4 -4.2
3rd YEAR
ENVOc
gym multipurpose hall100 sq m
complexmanagementoffice
snacks counter
stage
greenroom
greenroom
storeroom
12.9
12.9 12.7 12.5 12.3 12.1 11.9 11.7 11.5 11.3 11.1 10.9 10.7
10.7
10.7
10.7
10.7
10.7
11.3
12.9
12.9
12.9 12.9
lift duct lift duct
lift duct lift duct
lift duct lift duct
AHU12 sqm
lift duct lift duct
service lift
gent's toilet
urinal
lady's toilet
gent's toilet lady's toilet
urinalStorage
H.toilet
H.toilet lobby
coachingclass 30students
coachingclass 30students
coaching classadministrative office
coachingclass staff room
director's cabin
library
16.4
16.4
16.4
lift duct lift duct lift duct lift duct
lift duct lift duct
AHU
Auditorium(double height)
gent's toilet lady's toilet
urinalStorage
H.toilet
THIRD FLOOR PLAN
FOURTH FLOOR PLANconference room
office office
office
20 people
conference room
18 people
19.9refuge area
19.9
lift duct lift duct
lift ductlift duct
AHU12 sqm
gent's toilet lady's toilet
urinalStorage
H.toilet
FIFTH FLOOR PLAN
officeoffice
office office
office
23.4 23.4
lift duct lift duct
lift duct lift duct
AHU12 sqm
office
office
office
26.9
26.9
lift duct lift duct
lift duct lift duct
AHU12 sqm
gent's toilet lady's toilet
urinalStorage
H.toilet
office office
office
office
office
30.4
30.4
lift duct lift duct
lift duct lift duct
AHU12 sqm
gent's toilet lady's toilet
urinalStorage
H.toilet
office office
office
office
33.9 33.9
conference room
20 people
lift duct lift duct
lift duct lift duct
AHU12 sqmAHU12 sqm
gent's toilet lady's toilet
urinalStorage
H.toilet
SIXTH FLOOR PLAN
SEVENTH FLOOR PLAN
NINTH FLOOR PLAN
office
officeoffice
office
37.4
37.4
37.4
lift duct lift duct
lift duct lift duct
AHU12 sqm
gent's toilet lady's toilet
urinalStorage
H.toilet
TENTH FLOOR PLANEIGHTH FLOOR PLAN
3rd YEAR
ENVOc
lift machine room
lift machine room
water tank 1m abovethe ground 4m depth
40.9
40.9
37.4
lift duct lift duct
solar panels
chilling tower 3.6m dia3m ht
road
TERRACE FLOOR PLAN
1. OFFICE AREAS IN THE BUILDING AREDENOTED BY
2. THE PASSAGES IN THE BUILDING AREDENOTED BY
3. THE SHOPS ARE DENOTED BY
4. THE BASEMENT PARKING AREAS AREDENOTED BY
5. THE RESTAURANT AREA ISDENOTED BY
? FOR THE CANTILEVERS HIDDEN BEAM SYSTEM HAS BEENPROPOSED.
SECTION BB'
SECTION AA'
A A'
B
B'
PHOTOGRAPHS OF MODEL
3rd YEAR
HORTICULTURE CENTRE AIMTHE AIM OF THIS PROJECT WAS TO CREATEA HORTICULTURE CENTER WHICHINCLUDED A COMMERCIAL AREA ALONGWITH RESEARCH CENTERS TOGETHER WITHSTUDY AND ACCOMMODATION FACILITIESFOR PROSPECTIVE STUDENTS ANDWORKERS.
LOCATIONTHE SITE GIVEN TO US ISLOCATED IN A TOWNNAMED SHIRDHON AT NAVIMUMBAI, MAHARASHTRA,INDIA.
SITETHE SITE GIVEN TO US IS APTFOR THIS PROJECT WITH ARIVER AT THE SOUTH EAST,FLAT GROUNDS AT THECENTRE AND CONTOURSTOWARDS THE NORTHWEST
CONCEPTBEING A HORTICULTURE CENTER I HAD DECIDED TO GIVE THE STRUCTURESA RUSTIC LOOK AND CREATE LEVELS AND SPACES FOR COMMERCIAL FLORALDISPLAYS. ALONG WITH THAT I HAVE TRIED TO USE THE CONTOURS ANDAT THE SAME TIME I HAVE TRIED TO DESIGN THE LAB ( WHITE STRUCTURE) INSUCH A WAY SO AS TO MAKE IT BLEND WITH THE REMAINING STRUCTURES.
SOUTH EAST ELEVATION
SOUTH WEST ELEVATION
3rd YEAR
SITE PLAN
SECTION AA'
PHOTOGRAPHSOF MODEL
3rd YEAR
SECTION BB'
SECTION CC'
SECTION DD'
AMPHITHEATRE
LAB
4th YEAR
REDEVELOPMENT OF RAJA DINKAR KELKAR MUSEUM AT PUNELOCATIONFOR THE MUSEUM A NEWSITE HAS BEEN ALLOCATEDAT BAVDHAN NEARMUMBAI, PUNE BYPASS. THESITE IS SLOPING FROM 6MAT THE SOUTHERN PARTTO 0M AT THE EASTERNPART.
CONCEPTUAL WORKINGIN ORDER TO UNDERSTAND HOW THE MEMBRANESTRUCTYURE WILL LOOK LIKE I MADE SKETCHES, AMODEL AND 3D IMAGES TO GET AN OVERVIEW OFTHE DESIGN
GREEN ROOF CONCEPTI ALSO DECIDED TO USE THE CONCEPTOF GREEN ROOFING ON THEMEMBRANE STRUCTURE . GREEN ROOFSOR LIVING ROOFS HAVE MANYADVANTAGES LIKE COOLING THESTRUCTURE AND ABSORBING RAINWATER ALONG WITH GIVING IT ANASTHETIC LOOK
N
S
WE
4th YEAR
N
S W
ESITE PLAN
4th YEAR
N
S W
EROOF PLAN
4th YEAR
A
B
C
D
ENLARGED PLAN OF GALLERIESAT GROUND FOOR
VIEW AT A
VIEW AT C VIEW AT D
VIEW AT B
PLAN OF DRIVE WAY AND PARKING
4th YEAR
PLAN OF CAFETERIA AT FIRSTFLOOR
PLAN OF BASE MENT STORAGE
4th YEAR
EAST ELEVATION
SOUTH ELEVATION
NORTH ELEVATION
WEST ELEVATION
WEST ELEVATION AT NIGHT
4th YEAR
SECTION AA'
SECTION BB'
PHOTOGRAPHS OF MODEL
5th YEAR
DESIGN DISSERTATION: CENTRAL JAIL (CORRECTION CENTRE)PRISONS IN INDIA ARE DONOT EXACTLY ACT AS A PLACE OF CONTEMP0LATION FOR MOST PRISONERS BECAUSE OF POORINFRASTRUCTURE AND PLANNING. MORE OVER ALL MOST ALL THE PRISONS BUILT IN INDIA ARE FROM THE PRE-INDEPENDENCE PERIOD.HENCE I WANTED TO MAKE A NEW PRISON WITH BETTER FACILITIES AND TO HAVE AN INFRASTRUCTURE COMPLETELY DIFFERENT THANEXISTING PRISONS
RESEARCHI HAD DONE EXTENSIVE RESEARCH ABOUTPRISONS AND ALSO HAD AN OPPORTUNITYTO MEET WITH THE JAILER AND SOMEINMATES FROM ALIPORE JAIL IN INDIA, WHOHAD COME OUT ON PAROLE TO GIVE ADANCE PERFORMANCE IN MUMBAI. THROUGHMY RESEARCH ALONG WITH VARIOUS DESIGNASPECTS I HAVE ALSO LEARNED THAT THEPRISONERS, IN MAXIMUM CASES HADCOMMITTED CRIME OUT OF NECESSITY ANDALMOST ALL OF THEM ARE READY TOCHANGE, IF GIVEN, A CONDUCIVEENVIRONMENT.
LOCATIONTHE SITE IS LOCATED AT MALSHEJGHAT ALONG THE NH-222HIGHWAY IN A VALLEY. THE MAINREASONS FOR THE SELECTION OFTHIS SITE ARE:? AS IT IS A CORRECTION CENTRE A SERENE PLACE AWAY FROM CITY IS NEEDED? SHOULD HAVE TERRAIN WHICH WILL MAKE IT IMPOSSIBLE FOR INMATES TO ESCAPE? THE SITE AS A WHOLE HAS CONTOURS AND IS GENERALLY DRY AND ARID, ONLY ACCESS IS THROUGH THE NH-222 HIGHWAY
N
S
WE
PHOTOGRAPHS OF MY SITE
5th YEAR
DESIGNMY CENTRAL PRISON IS SPECIFICALLY TO BE USED AS A CORRECTION CENTRE. PROVISION OF VARIOUS KINDS OF ACTIVITIES FORTHE PRISONERS LIKE AGRICULTURE , PERFORMING ARTS, SPORTS SUCH AS FOOT BALL, BASKET BALL , AND RACE TRACK ALONGWITH LECTURE HALLS FOR STUDYING AND SMALL SCALE INDUSTRIES HAVE BEEN INCLUDED. THE ABOVE ILLUSTRATIONS ARE ONEOF MY FIRST CONCEPTUAL ATTEMPTS TO DESIGN IN THIS SITE. THE MAIN DESIGN PRINCIPLE WAS ABOUT USING A SHAPE PARTICULARLY AN OCTAGON FOR THE STRUCTURES. BASIC AIM IN THIS DESIGN WAS TO TRY TO REDUCE BLIND SPOTS AS MUCH AS POSSIBLE
CONCEPT 1.MY FIRST INTENTION FOR DESIGNING WAS TO TO GIVEA BRUTALISTIC LOOK TO THE STRUCTURES. I SOLELYWANTED TO CHANGE THE FORM OF THE PRISONWITHOUT AFFECTING ITS FUNCTION.
PRISON GROUND
SPORTS
AGRICULTURE
CONCEPT 1a. CONCEPT 1b.
PRISON GROUND
SPORTS
AGRICULTURE
N
S
WE
272 277
282
287
292
297
302307
312317
322327
332337
342347
352357
362367
372377
382387
392397
402407
412417
422427
432
437
442
447
452
457
462
467
472
477
482
487
492
497
502
512
517
522
527532
537
542
547
552
557
562
567
572
577
582
587
592
597
602
607
507
277282287292
297
302
307
312
317
322
327
332
337
342
347
352
357
362
367
372
377
382
387
392397402
412
407
417
422
427
432
437
442
447
452
457
462
467
472
477
482
487
492
497
502
507
512
277
282
287
292
297
302
307
312
317
322
327
337
342
347
517
352
357
362
367
372
377
382
387
392
397
402
407
412
417
422
427
432
437
442
447
452
457
462
467
472
477
482
487
492
497
502
507
512
517522
527532
537542
547552
557562
567572
577
582587
592597
602
607
lobby+472
securitycheck+472
uniformandchangingroom +472
medicalcheck+472
photographyroom +472
registration+472
prisonhospital+457
visitor'sroom +457
lobby+457
prisonhospital+457
prisonhospital+457
prisonhospital+457
registration+457
clerkroom +457
controlroom +457
prisonground
cultivation
cultivation
cultivation
amphitheatre
lecturehalls
small scaleindustries
granary storage
sportsground
prison block
prison block
prison block
prison block
prison block
prison block
cafeteriaabove
5th YEAR
CONCEPT 2.MY SECOND CONCEPTUAL DESIGN WAS TO PLACE THE STRUCTURES IN SUCH A MANNER THAT THEYMERGE WITH THE CONTOUR ITSELF LEAVING THE PRISON BLOCKS AS THE FOCAL POINT.
FINAL CONCEPTFINALLY AFTER STUDYING ANDEXPERIMENTING WITH MANY OTHER CONCEPTS ESPECIALLYTHE PENAPTICON CONCEPT IHAVE ALMOST DEVELOPED MYCURRENT DESIGN ON THEGROUNDS OF MYFIRST CONCEPT. BELOW ARE THEILLUSTRATIONS OF MY FIRST ANDFINAL CONCEPT.
FIRST CONCEPT
FINAL CONCEPT
N
S
WE
5th YEAR
N
S
WE
CONCEPT 1b.
5th YEAR
N
S
WEROOF PLAN
5th YEAR
NS
W
E
UPPER GROUND FLOOR PLAN
LOWER GROUND FLOOR PLAN
FIRST FLOOR HOSPITAL PLAN
5th YEAR
NS
W
E
ENLARGED PLAN AND VIEWS OF VISITOR'SMEETING ROOM AND SPILL OUT AREA
AA'
CONTROL ROOM
KITCHEN
CONTROL ROOM
DINING AREA
lift
CONTROL ROOM
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
4.0000
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM
CONTROL ROOM CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
PRISONCELL
+407.45
+411.45
+415.45
+419.45
+423.45
+427.45
+431.45
+435.45
+439.45
+443.45
+447.45
+451.45
+342 M
+390 M
+399 M
+406 M
+413 M
+420 M
+450 M
5th YEAR
SECTION BB'
SECTION AA'
PHOTOGRAPHSOF MODEL
VIEWS OF A PRISON CELL
PLAN OF A PRISONCELL
PRISON BLOCKGROUND FLOOR
1ST TO 10TH FLOOR
COMPETITION
U N I V E R S I T Y O F M U M B A IS I R J J C O L L E G E O F A R C H I T E C T U R EA R C H I T E C T U R A L D E S I G N 2012-2013
The Faculty Medal is an award, first instituted in 2006, by the faculty of Sir JJ College of Architecture to be given to the best design from a competitionorganized by the college. The Architectural Design Competition is for participation by all students in the college. The themes of the design competitionshall address pressing urban, social and civic issues in the city of Mumbai.Each entry is intended to generate alternatives that can transform the citythrough design excellence. The best entries of the competition are intended to be put on display to the city at large
Spaces between Buildings: Stitching Mumbai together
Aim: The aim is to adapt and use leftover spaces between buildings inMumbai for public purposes and amenities.
Goals of the Design:??The redesign/urban insert using spaces betweenexisting buildings should create a vibrant space for educational,recreational, community or other useful public activities.??The proposed projects should have a positive social andcultural impact on the target community.?????????????????????????????????????????????????????????
social tool, which applied thoughtfully, has the power to shapehuman cultural and economic activity.? The final design should be seamless between theexisting built form and the new insertions
Site:The design proposal should first introduce the local context. Thiscould be any neighborhood, anywhere in Mumbai. Oneneighborhood is not favored over another, recognizing the factthat a middle-class context can be as deprived as poorneighborhoods when it comes to social infrastructure.
Design Guidelines:??Find a relevant site in Mumbai that is a leftover space between two existing buildings (alleys, housegullies, setbacks, ignored spaces) that is around 3.0 to 3.5 meters wide. Any length longer than the widthis acceptable. The site should be accessible from a public road or footpath.??Design an architectural insert that will revitalize the surroundings as well as provide a vital urban amenity.??The insert should be accessible by public, but can be of specific benefit to the immediate neighborhood.??Your design should be contemporary and inspiring. Barrier free environments and those with a minimaldependence on energy consumption will be valued as design entries.
COMPETITION
FACULTY MEDAL: SOCIAL SPACE FOR STUDENTSIN MUMBAI AND NAVI MUMBAI IT IS A VERY COMMON THING TO SEE SCHOOL CHILDREN USINGFOOTPATHS , STREETS OR BUS STOPS AND RAILWAY STATIONS AS THEIR PLACE OF FUN AND FROLIC AS WELLAS FOR STUDYING. THE SITE THAT I HAVE SELECTED IS LOCATED IN THE VASHI GAOTHAN AREA IN NAVIMUMBAI. THIS AREA IS BASICALLY A SMALL SETTLEMENT INSIDE THE VASHI CITY LIMITS AND CONSISTS OF G TOG+4 STRUCTURES. THE RESIDENTS OF THIS AREA ARE TENANTS AND SUB TENANTS RESULTING IN VERY LITTLEOR NO PLACE FOR CHILDREN AND STUDENTS TO INTERACT AND STUDY AT HOME. MORE OVER LACK OFPLAY GROUNDS AND OPEN SPACES IN THIS AREA HAS RESULTED IN CHILDREN USING STREETS FOR STUDIESAND INTERACTION.
THE SITE
THE SELECTED SITE IS MARKED IN RED. THIS SITE IS A SPACE BETWEEN TWO BUILDINGS WHICH HAS AWIDTH OF 3M AT THE ENTRANCE AND INCREASES TO 3.4M. BECAUSE THE WIDTH OF THE SITE IS LESS ANDTIGHT, I HAVE USED THE CONCEPT OF RAMPS AND FLAT SPACES TO BECONSTRUCTED BETWEEN THE BUILDINGS. THE STRUCTURE PROPOSED IS A STEEL STRUCTURE WITH I-SECTIONS (ISMB 250) AS SUPPORTING MEMBERS.
ALL THE RAMPS AND FLATSPACES ARE GOING TO BECOVERED WITH ARTIFICIALTURF SO THAT CHILDRENCAN EASILY SIT ON THEM.
I-SECTION (ISMB 250)
FENCING
SOLAR LAMP
FLAT SPACES
RAMP
STEPS
N
SW
E
COMPETITIONGROUND FLOOR
PLANTOP FLOOR PLAN
BUILDING
BUILDING
BUILDING
ROOF PLANA
A'
B
B'
SECTION AA'
SECTION BB'
ELEVATION
3.89
M
4.71
M
5.21
M
N
SW
E
WORK EXPERIENCE: I AM CURRENTLY WORKING WITH ARCHITECTMANOJ VIJAN AND ASSOCIATES AND HAVE BEEN INVOLVED IN MANY PROJECTSWITH THIS FIRM. ONE OF THE PROJECTS IN WHICH I AM DEEPLY INVOLVEDRIGHT FROM THE DESIGN LEVEL IS " UNIVERSAL HIGH SCHOOL AURANGABAD"WHICH IS CURRENTLY BEING BUILT AT T-1 INDUSTRIAL AREA, CHIKALTHANA,AURANGABAD, INDIA.
THE CLIENT AND CONCEPT: THE CLIENT HERE IS THEOWNER OF A NUMBER OF SCHOOLS IN MAHARASHTRA, MOSTOF THEM DESIGNED BY US. HE WANTED THE SCHOOL TO HAVEAN INTERNATIONAL LOOK BUT AT THE SAME TIME BLENDWITH THE CONSERVATIVE ARCHITECTURE OF AURANGABAD.
PHOTOGRAPHS OF MODEL
3D VIEWS
LOWER GROUND FLOOR
UPPER GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
UNIVERSAL HIGH AURANGABAD
Tread=300mmRiser =152mm
Tread=300mmRiser =152mm
Water jets
Earth Filling upto +/- 0.00m lvl
MULTIPURPOSE COURT
MULTIPURPOSE COURT
BASKET BALL COURT
LONG JUMP SAND PIT
ATHLETIC TRACK
DN
4.00M WIDE TERRACE
CANTILIVER PORCH@ 2nd FL.LVL
JOB PROJECTS