17
BEYOND Shohei Shimokawa Contract III - Outpatient Health Care Facility for Autism

Beyond - Outpatient Health Care Facility for Autism

Embed Size (px)

Citation preview

BEYONDShohei Shimokawa

Contract III - Outpatient Health Care Facility for Autism

2Introduction

BEYOND

Harmony between nature and art.Art therapy is known as one of the effective treatments for people with autism. Its creative process of art creation improves and enhances a patient's physical, mental, and emotion well-being. Artistic self-expression helps people to resolve conflicts within themselves and problems in their lives. More-over, it helps to manage behavior, reduce stress, and develop interpersonal skills. With the help of power and beauty in the nature surrounding the site, the introduction of various kinds of artistic pro-grams will promote treatment and improve autism.

Proposal

Program 3

Room Number Quantity Area (sq.ft) Total (sq.ft) Room Number Quantity Area (sq.ft) Total (sq.ft)

R101 1 500 500 P101 2 500 1000R201 1 200 200 P201 1 800 800R301 1 200 200 P301 2 1500 3000

R401 - R402 2 100 200 P401 - P404 4 60 240R501 1 60 60 P501 1 120 120

1160 5160

AT 1 3000 3000 T101 - T102 2 250 5003000 T103 - T105 3 130 390

T201 - T203 3 300 900T301 1 1300 1300

T302 - T304 3 40 120D101 - D110 10 100 1000 T306 1 70 70D201 - D210 10 150 1500 T401 1 1000 1000D301 - D310 10 150 1500 T501 1 800 800

D401 1 300 300 T601 1 250 250D501 - D502 2 200 400 T701 1 150 150

D601 1 150 150 T801 - T806 6 60 360D701 1 700 700 T901 1 70 70

D801 - D802 2 200 400 T1001 1 60 60D901 1 60 60 1560

D1001 - D1004 4 60 240D1101 10 150 1500

6750A101 1 200 200A201 1 300 300A301 1 200 200

S101 1 400 400 A401 1 300 300S201 - S202 2 200 400 A501 1 200 200

S301 1 200 200 A601 5 150 750S401 1 300 300 A701 1 300 300S501 1 200 200 A801 1 300 300

S601 - S605 5 150 750 A901 - A902 2 100 200S701 1 300 300 A1001 1 60 60S801 1 100 100 2550

S901 - 902 2 60 120S1001 1 100 100S1101 1 100 100

2970Total 20150

Reception Desk

Bathroom

Exective Office

StorageMail Room

Locker Room

Staff Kitchen/Lounge AreaConference Room

Public Area

Bathroom

Restaurant / BarExhibition space

Lecture Room

General Stuff Work Station

Janitorial Room

Staff Kitchen/Lounge Area

Stuff Area

Doctor's OfficeDoctor's Lounge

Stuff Nap Room

Stuff Conference RoomStuff Lockerrooms

Stuff Bathrooms

Stuff Entrance

Ceramic Studio

Evaluation RoomNurse Station

Observation Room

Janitorial Closet

ATRIUMAtrium

Examination Room

Storage

Dignostic Area

Laboratory

Waiting Area

Physical TherapyPainting Room

Waiting Area

Janitorial Room

Diagnosis Office

Storage

Entry / ReceptionEntry LobbyReception

Waiting AreaBathroom

Storage

Storage

Storage

MUsic Studio

EscapeFurnace

Janitorial Closet

Therapy Area

Bathroom

Sterile Area

Administrative Area

Music Studio L

Bathroom

Nurse station

Wash Room

PC Studio

Room Number Quantity Area (sq.ft) Total (sq.ft) Room Number Quantity Area (sq.ft) Total (sq.ft)

R101 1 500 500 P101 2 500 1000R201 1 200 200 P201 1 800 800R301 1 200 200 P301 2 1500 3000

R401 - R402 2 100 200 P401 - P404 4 60 240R501 1 60 60 P501 1 120 120

1160 5160

AT 1 3000 3000 T101 - T102 2 250 5003000 T103 - T105 3 130 390

T201 - T203 3 300 900T301 1 1300 1300

T302 - T304 3 40 120D101 - D110 10 100 1000 T306 1 70 70D201 - D210 10 150 1500 T401 1 1000 1000D301 - D310 10 150 1500 T501 1 800 800

D401 1 300 300 T601 1 250 250D501 - D502 2 200 400 T701 1 150 150

D601 1 150 150 T801 - T806 6 60 360D701 1 700 700 T901 1 70 70

D801 - D802 2 200 400 T1001 1 60 60D901 1 60 60 1560

D1001 - D1004 4 60 240D1101 10 150 1500

6750A101 1 200 200A201 1 300 300A301 1 200 200

S101 1 400 400 A401 1 300 300S201 - S202 2 200 400 A501 1 200 200

S301 1 200 200 A601 5 150 750S401 1 300 300 A701 1 300 300S501 1 200 200 A801 1 300 300

S601 - S605 5 150 750 A901 - A902 2 100 200S701 1 300 300 A1001 1 60 60S801 1 100 100 2550

S901 - 902 2 60 120S1001 1 100 100S1101 1 100 100

2970Total 20150

Reception Desk

Bathroom

Exective Office

StorageMail Room

Locker Room

Staff Kitchen/Lounge AreaConference Room

Public Area

Bathroom

Restaurant / BarExhibition space

Lecture Room

General Stuff Work Station

Janitorial Room

Staff Kitchen/Lounge Area

Stuff Area

Doctor's OfficeDoctor's Lounge

Stuff Nap Room

Stuff Conference RoomStuff Lockerrooms

Stuff Bathrooms

Stuff Entrance

Ceramic Studio

Evaluation RoomNurse Station

Observation Room

Janitorial Closet

ATRIUMAtrium

Examination Room

Storage

Dignostic Area

Laboratory

Waiting Area

Physical TherapyPainting Room

Waiting Area

Janitorial Room

Diagnosis Office

Storage

Entry / ReceptionEntry LobbyReception

Waiting AreaBathroom

Storage

Storage

Storage

MUsic Studio

EscapeFurnace

Janitorial Closet

Therapy Area

Bathroom

Sterile Area

Administrative Area

Music Studio L

Bathroom

Nurse station

Wash Room

PC Studio

Project Site and Space Analysis 4

Concept 5

Circulation

Sustainability

Art

Soft

Geometry

coexistence

Division

Blend

Expanse

Close

Wood

Glass

Sun Light1.618

Beyond

creativity

Acoustic

OrganicPath

Radial

Nature

Separation

mineral

Branch

Open

Green

Neutral

Connection

Section

Design Criteria

Concept 6

Project Diagram 7

Bubble Diagram

Main Level Lower Level

Atrium

Reception

PublicArea

AdministrativeArea

DiagnosisArea

Therapy Area

StuffArea

DiagnosisArea

Atrium

AdministrativeArea

Project Diagram 8

Entry Lobby

Waiting Area

Bathroom

Lecture Room

RestaurantBar

Bathroom

Museum

Evaluation Room

Examination Room

Waiting Area

Bathroom

Nurse Station

Observation Room

Sterile Area

Reception Desk

Atrium

Reception

1

Storage

Laboratory

Janitorial Closet

Bathroom

Waiting Area

Waiting Area

Reception

2

Storage

StuffEntrance

StuffBathroom

StuffLounge

Naproom

Work Station

Janitorial Closet

Executive Office

Painting Studio

MusicStudio

Physical Therapy

Bathroom

CeramicStudio

PCStudio

Nurse Station

Bathroom

Conference Room

Mail Room

DiagnosisOffice

Staff Lounge

Storage

StuffLocker

Doctors Office

Conference Room

Doctors Lounge

Atrium

Bubble Diagram

Project Diagram 9

Stuff Entrance

Locker Room

DiagnosisOffice

Diagnosis Area

Stuff Lounge

Locker Room

TherapyArea

Stuff Lounge

Locker Room

StaffSequence

Stuff Entrance

Office

Administration

Staff Lounge

AdministrationSequence

Reception

Therapy Area

Atrium

Administration

Exhibition Space

Restaurant /Bar

Lecture Room

Administration

Diagnosis Area

Waiting Area / Bathroom

Exam Area

Waiting Area / Bathroom

Evaluation Area

Administration

Family / PatientSequence

Sequence Diagram

Project Diagram 10

Process Diagram

AreA

Adding Atrium

Volume

open for sunlight

Plan Section Perspective 11

677 SF

PHYSICAL THERAPYT501

1302 SF

CERAMIC ROOMT301

136 SF

OFFICED401

234 SF

STUFF KITCHEN / LOUNGEA701

118 SF

STORAGES1101

144 SF

MAIL ROOMA301

79 SF

BATHROOMA901

76 SF

BATHROOMA902

142 SF

OFFICED403142 SF

OFFICED402

142 SF

OFFICED404

142 SF

OFFICED405

142 SF

OFFICED406

152 SF

OFFICED408

152 SF

OFFICED409

136 SF

OFFICED410

152 SF

OFFICED407

52 SF

BATHROOMS902

51 SF

BATHROOMS901

176 SF

LOCKER ROOMS201

141 SF

DOCTORS OFFICES602

140 SF

DOCTORS OFFICES601

141 SF

DOCTORS OFFICES603

141 SF

DOCTORS OFFICES604

166 SF

LOCKER ROOMS202

190 SF

CONFERENCE ROOMA801

150 SF

EXECTIVE OFFICEA601

150 SF

EXECTIVE OFFICEA602

151 SF

EXECTIVE OFFICEA603

136 SF

EXECTIVE OFFICEA604

142 SF

EXECTIVE OFFICEA605

253 SF

DOCTORS LOUNGES701

56 SF

BATHROOMT801

50 SF

BATHROOMT802

139 SF

STORAGET702

283 SF

MUSIC STUDIO LT102

135 SF

MUSIC STUDIOT103

58 SF

BATHROOMT805

226 SF

MUSIC STUDIO LT101

135 SF

MUSIC STUDIOT104

334 SF

PC STUDIOT201

898 SF

PAINTING ROOMT401

28 SF

ESCAPET302

28 SF

ESCAPET303

28 SF

ESCAPET304

80 SF

JANITORIALT901

65 SF

JANITORIALS1001

53 SF

JANITORIALD604

213 SF

STAFF KITCHEN / LOUNGES401

123 SF

STAFF CONFERENCES301

160 SF

STAFF NAP ROOMS501

108 SF

WORKSTATIONS801

141 SF

DOCTORS OFFICES605

56 SF

BATHROOMT803

81 SF

FURNACET305

3326 SF

ATRIUMAT

73 SF

STORAGED1101

257 SF

NURSE STATIONT601

59 SF

BATHROOMT806

145 SF

STORAGEA1101

140 SF

PC STUDIOT202

334 SF

PC STUDIOT203

183 SF

LOCKER ROOMA501

50 SF

RoomD311

1/16" = 1'-0"1 Level 1

Plan Section Perspective 12

103 SF

OBSERVATIOND101

143 SF

WAITING AREAA101

103 SF

OBSERVATIOND102

103 SF

OBSERVATIOND103

103 SF

OBSERVATIOND104

103 SF

OBSERVATIOND105

103 SF

OBSERVATIOND106

103 SF

OBSERVATIOND107

108 SF

OBSERVATIOND108

108 SF

OBSERVATIOND109

108 SF

OBSERVATIOND110

150 SF

EX ROOMD201

143 SF

EVALUATIOND307

134 SF

STORAGED802

146 SF

NURSE STATIOND401

145 SF

EX ROOMD202 137 SF

EX ROOMD203

137 SF

EX ROOMD204

133 SF

EX ROOMD205

141 SF

EX ROOMD206 165 SF

EX ROOMD207

141 SF

EX ROOMD208

162 SF

EX ROOMD209

137 SF

EVALUATIOND305

128 SF

EVALUATIOND301

128 SF

EVALUATIOND302

137 SF

EVALUATIOND306 166 SF

STERILE ROOMD601

140 SF

EVALUATIOND308

140 SF

EVALUATIOND309

140 SF

EVALUATIOND310

158 SF

RECEPTION DESKA201

52 SF

BATHROOMD1002

51 SF

BATHROOMD1001

1506 SF

RESTAURANT / BARP201

57 SF

BATHROOMR401

58 SF

JANITORIALA901

84 SF

BATHROOMD1004

79 SF

BATHROOMD1003

2443 SF

EXHIBITION SPACEP301

689 SF

LABORATORYD701

47 SF

STORAGED801

60 SF

BATHROOMR402

56 SF

BATHROOMP403

50 SF

BATHROOMP404 56 SF

BATHROOMP401

50 SF

BATHROOMP402

145 SF

EX ROOMD210

131 SF

EVALUATIOND303

390 SF

RECEPTIONR201

47 SF

JANITORIALR501

342 SF

LECTURE ROOM1102

344 SF

LECTURE ROOM1103

206 SF

WAITING AREAD502

137 SF

EVALUATIOND304

227 SF

WAITING AREAD501

108 SF

STORAGEP501

247 SF

WAITING AREAR301

1/16" = 1'-0"1 Level 2

Plan Section Perspective 13

Level 10"

Level 214' - 0"

ROOF28' - 0"

3/32" = 1'-0"1 whole section

Plan Section Perspective 14

1 axon

Plan Section Perspective 15

Level 10"

Level 214' - 0"

Level 214' - 0"

ROOF28' - 0"

Level 10"

Level 214' - 0"

ROOF28' - 0"

1/8" = 1'-0"1 Drawing

1/8" = 1'-0"2 lobby

1/16" = 1'-0"3 garden

1/8" = 1'-0"1 Level 1 - Drawing

1/16" = 1'-0"2 Level 1 - Garden

1/8" = 1'-0"3 Level 2 - Lobby

Level 10"

3'-0"

3'-0"

1'-6"

2'-6"

10'-0

"

1/4" Plywood

1/4" Clear Float Glass

1/4" Tempered Etched Glass

1/4" Tempered Etched Glass

4" Diameter Steel Epoxy zinc primer with PU paint

1 1/2" = 1'-0"1 LIGHTING DETAIL

1/4" = 1'-0"2 Drawing Detail

3 GLASS DOME DETAIL

4" WOOD RADIAL CUSTOM SYSTEMS

INPLANA C07 CDP19 1000-830 ET 01

Plan Section Perspective 16

Level 10"

Level 214' - 0"

Level 214' - 0"

ROOF28' - 0"

Level 10"

Level 214' - 0"

ROOF28' - 0"

1/8" = 1'-0"1 Drawing

1/8" = 1'-0"2 lobby

1/16" = 1'-0"3 garden

1/8" = 1'-0"1 Level 1 - Drawing

1/16" = 1'-0"2 Level 1 - Garden

1/8" = 1'-0"3 Level 2 - LobbyLevel 1

0"

3'-0"

3'-0"

1'-6"

2'-6"

10'-0

"

1/4" Plywood

1/4" Clear Float Glass

1/4" Tempered Etched Glass

1/4" Tempered Etched Glass

4" Diameter Steel Epoxy zinc primer with PU paint

1 1/2" = 1'-0"1 LIGHTING DETAIL

1/4" = 1'-0"2 Drawing Detail

3 GLASS DOME DETAIL

4" WOOD RADIAL CUSTOM SYSTEMS

INPLANA C07 CDP19 1000-830 ET 01

Plan Section Perspective 17

Level 10"

Level 214' - 0"

Level 214' - 0"

ROOF28' - 0"

Level 10"

Level 214' - 0"

ROOF28' - 0"

1/8" = 1'-0"1 Drawing

1/8" = 1'-0"2 lobby

1/16" = 1'-0"3 garden

1/8" = 1'-0"1 Level 1 - Drawing

1/16" = 1'-0"2 Level 1 - Garden

1/8" = 1'-0"3 Level 2 - Lobby

Level 10"

3'-0"

3'-0"

1'-6"

2'-6"

10'-0

"

1/4" Plywood

1/4" Clear Float Glass

1/4" Tempered Etched Glass

1/4" Tempered Etched Glass

4" Diameter Steel Epoxy zinc primer with PU paint

1 1/2" = 1'-0"1 LIGHTING DETAIL

1/4" = 1'-0"2 Drawing Detail

3 GLASS DOME DETAIL

4" WOOD RADIAL CUSTOM SYSTEMS

INPLANA C07 CDP19 1000-830 ET 01