Oil and gas standard dwgs

Citation preview

  • 1. ) KUWAIT OIL COMPANY (K. S.C. )Q T'V EIALi W LEI N l : l : l 5%!l I g , I I I I- 1 4,,JIf ._ 1 llllllllwlll I | llllllllflllllllllll M I IDesigu Team,November,2007

2. DOC. N0.EG-DO-C-001PAGE 1 OF 109REV.0(. e.I. .. .) . :., .s. n has 25,; KUWAIT OIL COMPANY (K. S.C. )ENGINEERING DRAWING PRACTICE CODE DOC.N0. EG-DO-C-001Engineering Group Design TeamISSUED AS ENGINEERING GROUP g, g_3I .2I 11-11-07 ENGINEERING DESIGN TEAM_ go __ _ GROUP CODE (DRAWING oFF1cE) Ibrahim AI-Awadhl Amlna Ra]ab Yousuf Ahmad All av 3. DOC. N0.EG-DO-C-O01 PAGE 2 OF 109 REV. OTABLE OF CONTENTS1 .0 INTRODUCTION 2.0 SCOPE3.0 GENERAL DRAFTING PRACTICE3.1 Presentation3.2 General Piping Guidelines3.3 General Dimensioning Guidelines 3.4 Colour Coding for checking3.5 Dimensioning Samples3.6 Drawing Scales3.7 Graphic Scales3.8 Location Plan3.9 Key Plan3.10 Section Indicators3.11 North Arrow3.12 Layouts,Surveys,Site and Location Plans3.13 Piping and Civil Drawings (Other than those for Buildings) 3.14 Architectural and Associated Plans3.15 Isometric and North Arrow3.16 Nozzle Orientation3.17 Orthographic Projection3.17.1 Plan 3.17.2 ElevationKOC DRAWING NUMBERING SYSTEM4.1 General 4.2 KOC P&ID Numbering System4.3 Equipment Numbering System 4.4 Line Numbering System 4. DOC. N0.EG-DO-C-O01PAGE 3 OF 109TABLE OF CONTENTS5.0 DRAWING FRAMES 8: TITLE BLOCK5.1 Specimen of Drawing Frames & Title Block 5.2 Drawing Title Panel (KOC) 5.3 Folding of DrawingsCAD LAYER SPECIFICATIONS6.1 Piping and Instrumentation 6.2 Piping 6.3 Electrical6.4 Civil /Architectural 6.5 Heating Ventilation & Air ConditioningLINE CHARACTERISTICS7.1 Piping drawing7.2 Piping & Instrument Diagrams,Process Flow Diagrams and Signal linesSYMBOLS 8: ABBREVIATIONS8.1 Piping and Instrument Diagram (P & ID) Symbols 8.1.1 Equipment Identification Prefixes8.1.2 Fluid Designation8.1.3 Insulation Designation (For Piping/ Equipment)8.1.4 Line Continuations8.1.5 Instrument Tag Number Identification /Instrument Identification 8.1.6 Instrument Line Symbols8.1.7 Instrument Symbols (Local)8.1.8 Local/ Local Panel /Packaged Unit Panel8.1.9 Distributed Control System8.1.10 Programmable Logic Controllers8.1.11 Scada System 5. DOC. N0.EG-DO-C-O01PAGE 4 OF 109REV. OTABLE OF CONTENTSMiscellaneousLevel Instruments Temperature Instruments Pressure InstrumentsFlow InstrumentsMiscellaneous Symbols For P&ID Valves For Piping & Instrument DiagramEquipment VesselsFiltersTanksHeat ExchangersPumpsMixing DevicesCompressors/Blowers/ Fans/EjectorsDrivers P&ID Abbreviations Instrument identification lettersInstrument Valves for P&IDInstrument Valves for P&ID (Safety)Typical Instrument ConnectionsTypical Shutdown & Vent ValvesSafety Blowdown Valve,Emergency Shutdown Valve Motor Operated ValvesMotor InstrumentationSample Connection ArrangementsInjection & Sample NozzleCorrosion CouponTypical Pump Casing Vents & Drains on Suction Discharge Lines & Base Plate DrainsStandard Hydrant & Fire Engine Suction Riser 6. DOC. N0.EG-DO-C-O01PAGE 5 OF 109REV. OTABLE OF CONTENTSPiping Symbols8.2.1 Piping Fittings8.2.2 Valves8.2.3 Type of Operators for Valves 8.2.4 Type of Pipe SupportsPiping Abbreviations Piping Legends Electrical Symbols8.5.1 Power8.5.2 Schematic and Single Line Diagram 8.5.3 Lighting8.5.4 Telecommunication8.5.5 Fire Alarm System8.5.6 Earthing 8.5.7 Building 8.5.8 Relays and MeteringElectrical Abbreviations Civil /Architectural Symbols8.7.1 General8.7.2 Doors8.7.3 Windows8.7.4 Kitchen & Toilet 8.7.5 Materials8.7.6 Walls 8.7.7 MiscellaneousCivil /Architectural Abbreviations HVAC SymbolsHVAC Abbreviations 7. DOC. N0.EG-DO-C-O01PAGE 6 OF 109REV. OTABLE OF CONTENTSPRINT ROOM OPERATING PROCEDURES 9.1 Introduction9.2 Reservation of Drawing Numbers9.2.1 Drawing Number Reservation Form for KOCDrawing Registration9.3.1 Drawing Registration Form for KOC 9.3.2 Drawing Revision Form for KOC9.3.3 Drawing Print Request Form for KOC /ContractorMicro Filming by KOC Print Room9.4.1 Aperture Card Preparation 9.4.2 Reduction Ratio 9.4.3 Section Filming9.4.4 Frame Spacing9.4.5 Center Mark,Cutting Mark & Scale 9.4.6 Positioning of Drawinga) Lens Resolution b) Exposure and Developing C) Film Mountingd) The Aperture Card e) Contractor Drawing Number9.5 Revision Procedure on KOC Drawings10.0 AS BUILT DRAWINGS10.1 As Built Drawing Submittal 10.2 As Built Drawing Approval Stamp 10.3 As Built Drawing Sheet Sizes10.4 As Built Drawing Title Panel10.5 As Built Drawing Specifications 8. I DOC. N0.EG-DO-C-O01PAGE 7 OF 1091 .0 INTRODUCTION1.1 The Engineering Drawing Practice Code (EDPC) amalgamates and updates the various requirements covered in various existing documents. 1.2 The Code aims too Bring uniformity in Mechanical,Electrical,Civil,Process and Instrumentation discipline drawings. o Provide quick reference to pre designed standard and laying down good design drawing process to work more effectively. - Assist users to read the drawings by giving fixed set of conventions in preparation of drawings. o Standardize as much possible of engineering works for projects handled by Engineering Group and Contractors. This code is for use by Kuwait Oil Company (KSC) and its Contractor. This issue of Engineering Drawing Practice Code (EDPC) supersedes the following existing KOC documents : o Engineering Drawing Office Practice Code,issued earlier. o Standards Specification for Contractor Drawings (Issue dated 25th May 1998)o The above documents are superseded and withdrawn. 2.0 SCOPE2.1 This code specifies the requirements for preparation of Engineering Drawings for KOC Facilities in Kuwait. 2.2 The procedure for initiation,numbering,approval and revision of drawings generated by KOC and Contractors are covered in this code. 2.3 This Code also specifies the print room operating procedures. 3.0 GENERAL DRAFTING PRACTICEDrawings and diagrams shall comply with the requirements of Engineering Drawing Practice Code. 3.1 Presentationa) Third angle orthographic projection shall normally be used.Section planes shall be clearly shown. Elevations and sections shall be correctly orientated when viewed from the bottom or right hand edge of the drawing. 9. DOC. N0.EG-DO-C-O01PAGE 8 OF 109REV. Od) Isometric projections may be used for sub-assemblies of piping. e) Perspective may be used to give an artists impression of the finished building or installation. f) Views and sections shall be chosen so as to present information clearly with the minimum number of views.So that information is not repeated. g) For any equipment or detail which appears in the plan but is omitted in the section or elevation,for clarity a statement of this meaning should be added under the section name. General Piping Guidelinesa) All Piping will clearly indicate all Clearances,Intersections,Anchors,Guides,Piping Supports,Spring and Rod,Hangers and Connections to Associated Equipment. Piping Drawings will show Dimensions in mm and Levels in Metres. A Co-ordinate will locate all Equipment such as Vessels,Tanks,Exchangers,Pumps,Pipe Racks and Buildings.Piping will beDimensioned from these Coordinates where possible. Pipe 12" and under will be drawn Single Line.Double line Piping will be used for Lines 14" and Larger. e) Each Line on the Piping Arrangement Drawings will be marked toshow Flow Direction & the Line Size,Fluid Designation,Line Number,Line Class and Insulation Designation if Insulation is needed. 10. I DOC. N0.EG-DO-C-O01 PAGE 9 OF 1093.3General Dimensioning Guidelinesa) All dimensions on a drawing shall use the same unit. Dimensions shall normally be in millimetres,Coordinates,Levels and survey dimensions shall normally be in metres.If other units are required they shall be clearly stated on each drawing within brackets. The abbreviation symbols for Diameter,Radius and Square shall precede the figure e. g. 012 or D12, R85 and El 30.Where equipment or material is sized in Imperial units the metric conversion shall be given in brackets,the Imperial size shall not be normally given. Nominal pipe sizes and valve bores should be given in Imperial units unless otherwise requested. Fractions of millimetres shall be avoided where possible,except these are machining tolerances,sheet thickness and wirediameters. As a minus sign is easily misread,a suitable datum shall be taken as TBM (temporary bench mark) such that all levels are positive. This bench mark shall be clearly indicated on the drawing or diagram when necessary.The bench mark shall be related to the ordnance survey or chart datum. Normally separate drawings should be made for different types of work.For example the following should be on separate drawingsMechanical works,Civil works,Electrical works,Air conditioning,Plumbing,Fire fighting and Pipe spools which are to be prefabricated. Colour Coding for CheckingColours used for checking shall have the following meanings: Deletions and inaccuracies Additions CorrectBlue -Red - Green -Comments not implying inaccuracy like instruction to draughtsman should be marked up in pencil.All irrelevant notes,like calculations,sketching. ..etc.shou| dt be marked up on the check print. 11. I DOC. N0.EG-DO-C-O01PAGE 10 or 1093.5 Dimensioning Samples27.504L100500 E 100600 E3.6 Drawing Scalesa) The Following metric scales are preferred in laying out the drawing contents. 1:1 1:10 1:50 1:500 1:250O 1:40 1:2 1:20 1:100 1:1000 1:5000 1:33 1/3 1:5 1:25 1:200 1:2000All layout and general arrangement drawings shall be drawn to scale.The scale shall be indicated in the scale section of the title block. If for reason of clarity more than one scale is used,the scale used will be clearly indicated below each view or detail and the text as AS SHOWNshall be printed in the scale section of the title. For schematic drawings (e. g. P & ID's),the word NONE shall be printed in the scale section of the title block. On scaled drawings where for reasons of clarity the physical dimensions are drawn "Not To Scale" the dimension shall be annotated below the dimension text thus '(NTS)'. 3.7 Graphic Scales0 I0 20 30 40GRAPHIC SCALE 1 :500a) Graphic Scales shall be placed above the Title Block.b) Graphic Scales shall be shown in all scaled drawings. 12. DOC. N0.EG-DO-C-O01 PAGE 11 OF 109REV. O3.83.9Location Plana) Location Plan shall be placed above the Graphic scales/ Title block. b) Location Plan for Plant/ Facilities approaching road maps shall be indicated on the drawing wherever necessary. Key Plana) Key Plan shall be placed above the Graphic scales/ Title block.b) The subject area of the particular drawing is to be hatched for clarification. Section Indicators@_INorth Arrowa) A North point shall appear on every plan and shall be designated True,Refinery or Plant Grid. b) The North arrow shall take the form shown in option 1, 2 or 3.TOP RIGHT HAND CORNER OF DRAWING SPACEOption-23.12 Layouts,Surveys,Site and Location Plansa) The true or Grid North shall point to the top of the sheet see Option 1 & 2.b) Double arrows giving the relationship between True and Site or Plant GridNorths shall be used on layouts and Surveys only see Option 3; for surveys,the angle of variation should be added. 13. I DOC. N0.EG-DO-C-O01PAGE 12 or 1093.13 Piping and Civil Drawings (Other than those for Buildings)The orientation of all piping plans and civil arrangement plans shall be the same as Plant Layout.Plans for subassemb| ies and Layout part plans musthave the same orientation as the main plan layout.Architectural and Associated Plansa) On building plan the main entrance is normally shown towards the bottom of the drawing sheet.The north arrow shall be added to the plan showing its true position.i. e. North arrow may be shown towards the bottom ofthe drawing sheet. All other plans relating to the same building should have the same orientation e. g. RC foundation,drainage,plumbing and power and lighting. If a Site or Location plan is added to the same drawing sheet as the working drawing then the Site or Location plan shall have the same orientation as the Site Layout. Isometric and North ArrowThe directional symbol on the pipeline isometric sheet / detail shall be shown as in Option 1 or 2TOP RIGHT HAND CORNER OF ISOMETRIC SHEET/DETAILOption-1 Option-2DIAMETER OF ISOMETRIC ELLIPSE TO BE 20mm3.16 Nozzle OrientationThe north arrow on vessel drawings contains designation of 0 for N", 90 for "E",180 for "S" ,270 for "W" and the orientation of a nozzle in plan is determined by this method. 14. DOC. N0.EG-DO-C-O01 PAGE 13 OF 109 REV. ONEW TANK "B"6000 HIGH 3.17.1 PlanEXISTING NEW TANK "E" i TANK "D"13o0oI HIGHI SOOOII-IIGHI I FUTURE I : I:I' NEW BLOCK 'F' EXTENSION 3000 HIGH IIEIInAnZ9 TANK "C"3.17.2 Elevation TANK "B"TANK "D"BLOCK 'F'.The full line of Tank C is taken through the future extension of Block F and the Existing Tank E. .Tank E is carried in front of Tank C since E is in front of C but is stopped at Block F since E is behind F. .Tank C is shown in a shortdash line behind Tank D but not behind both Block F and Tank D. This convention sets a limit to the extent of the hidden edges and in certain cases gives added information in the view,e. g. from the elevation alone Tank B is seen to be directly behind Block F and also behind Tank C. d.Tank A is stopped at Tank C and at the outline of Tank E since A is behind in each case. e.Edges of future or existing items that are behind other outlines should not be shown. 15. DOC. N0.EG-DO-C-O01 PAGE 14 OF 109 REV. O4.0KOC DRAWING IVIUIVIBERIIIEG SYSTEMNORTH AREA FACILITIES2m 9!North Kuwait Area /Umm Al-Aish CampGathering Center - Gathering Center - 23Gathering Center - 24 * Gathering Center - 25Gathering Center - 26 * Gathering Center - 190 (Water) Booster Station 130Booster Station - 131Central Injection Pumping Facilities (CIPF)l*15 . . i-i- HOKDOOLOCATION CODE217U'| OU'IU1U'lU'| U'|KO llllll i- OWU1-l>UJU'I17593 626Sea Water Treatment Plant (SWTP)EAST AREA FACILITIESAhmadi AreaGathering Center - O1 Gathering Center 02 Gathering Center - 095L- LOCATION NO_ SOUTH AREA FACILITIES CODE1 Burgan Area 050 Explosive Store 226 Gathering Center 403 Gathering Center - 04 404 Gathering Center - 05 * 405 Gathering Center 06 406 Gathering Center - O7 407 Gathering Center - O8 408 Gathering Center - 12 * 412 Gathering Center - 13 * 413 Gathering Center 14 * 414 Gathering Center - 21 556 Booster Station 140 592 Booster station 150 592 Wafra 103 Gas Injection Plant 332| )03LOCATIONWEST AREA FACILITIES CODEWest Kuwait AreaGathering Center 16 Gathering Center - 17Gathering Center - 10Gathering Center - 18Gathering Center - 11 Gathering Center 19 Gathering Center - 20 Gathering Center - 22KIO IU'I-LChilled Water Plant - A Chilled Water Plant - B Mina & MarineNorth Tank Farm South Tank Farm North PierSouth PierAhmadi HospitalI"IIII"I"I"I xicnu-i. I>. wi)io NNwn- llU1 xoooGathering Center - 27Gathering Center 28 Booster Station - 170Minagish Water Injection PlantGENERALCommon for all GC's StandardWell headCathodic Protection Gas LinePipe Line Services217REFERENCE CODEO10 015 416 345 418 615l-* wNIndustrial Area Shuaiba areaKPC Building Al-Tameer BuildingIUIUI-1-I-1 HOLOCD (. JU'lO OGDLAJ I-@I- IIIl_. .u. aCrude Oil Transit Line Sub StationPolice Head Quarter RoadIraq Kuwait Gas Line Water Line105 097 662 211 612 106NOTES:* GATHERING CENTER'S 5 12 13 14 18 24 & 26 ARE ABANDONED 16. I DOC. N0.EG-DO-C-O01PAGE 15 OF 109LOCATION CODE SERIAL NO.SE UENTIAL NO._i_ _if /QO00-00-000 LDISCIPLINE CODEDITICUIDIEINE DB| 'AIV|3>/ IENG DESCRIPTIONGeneral Layout Plot Plan,Data Sheets,Charts,SpecificationBuilding,Foundation,Car Park,Roads,Fences,Architectural,Doors,WindowsSteel Works,Concrete,Masonry,Carpentry,Ceilings,RoofAll Type of PipingMechanical & Equipment,Rotating Equipment,Compressors,Pumps,Drivers,Process Blowers,Blenders,Mixers,P & ID's,Flow Diagrams,HVACTank & Vessels Pressure Vessels,Columns,Storage TanksTelecom,Earthings,Cathodic Protections,Motors,Generators,Transformers,ConvertersControl Valves,Indicators,Instrument Panels,Alarms,Measuring Equipment,Pneumatic TubingElectricalInstrumentation4.2 P&ID Numbering System407-5-316FACILITY/ AREA CODE DISCIPLIN E CODESEQUENTIAL NUMBER.3 Equipment Numbering System25-G-1 0 1 A PLANT NUMBER I xEQUIPMENT IDENTIFICATION PREFITRAIN=1,2,3, ETC.(COMMON=0) SEQUENTIAL NO.PARALLEL/ STANDBY/ SPARE UNITS(A, B,C, ETC. )4.4 Line Numbering System16"-PL-1090-C15A-HC LINE SIZEFLUID DESIGNATIONLINE NUMBER LINE CLASS (REFER PIPING MATERIAL SPEC. )INSULATION DESIGNATION 17. DOC. N0.EG-DO-C-O01 PAGE 16 OF 109REV. O5.0 DRAWING FRAMES 8; TITLE BLOCK5.1 Specimen of Drawing Frames & Title BlockALL 210 > O 15841ALL 210lm I686> -l>II '_'I | l I'| '|l . . I .2197.CL E. IN F-- O 18. DOC. N0.EG-DO-C-O01PAGE 17 OF 109REV. O5.2 Drawing Title Panel (KOC)All KOC drawing shall have the standardized drawings title panel as shown. KUWAIT OIL C0. K.S.C. AREA /LOCATIONPROJECT TITLE PROJECT TITLE DRAWING TITLEDRAUGHTING DESIGN A P P R O V A L SD~D/ MAN NAME SIGNATURE DESIGNATION S. D.D/ MAN NAME SIGNATURELD. D/NAN NAME SIGNATUREDRAWING SHEET No. 5.3 Folding of DrawingsA0 841 X 118933" X 47"A1+686 X 970 27" X 38"A1 594 X 84123" X 33"A2 420 X 59416.5" X 23"A3 297 X 42011.7" X 16.5"A4 210 X 2978.3" X 11.7" 19. I DOC. N0.EG-DO-C-O01PAGE 18 OF 1096.0 CAD LAYER SPECIFICATIONS 6.1 Piping and InstrumentationDESCRIPTION CAD LAYER COLOUR N0. COLOUR NAME LINE TYPEPIPELINE BLACKEQUIPMENT EQ BLACKFITTINGS FIT MAGENTATEXT TXT G REENINSTRUMENT/ PLANT AIR IA/ UTA 115MISCELLANEOUS MISC 21INST. CABLE INSTPNEUMATIC SIGNALHYDRAULIC SIGNALCAPILLARY TUBING CTELECTRICAL SIGNAL ESDCS SOFTWARE OR S FIRM WIRE LINKDC TELEMETRY SIGNAL TS ELECTRO MAGNETIC/EM SONIC SIGNAL7 7EQUIPMENTCRUDE OIL WETCRUDE OIL DRYLP GASHP GASFUEL GASLEAN GASCONDENSATE 20. DOC. N0.EG-DO-C-O01 PAGE 19 OF 109 REV. ODESCRIPTION CAD LAYER COLOUR N0. COLOUR NAME LINE TYPECHEMICAL/ GLYCOL CHEM/ GLY 3 GREENFRESH WATER FRW BLUEBRACKISH WATER BRW CYANFIRE FIGHTING WATER FFWDRAINAGE/ BLOW DOWN MAGENTADIMENSIONS BLACKUJ TEXT GREENMISCELLANEOUSI l-21LINE 100/ RELIEF LINEI-A LA)13LINE 80 FLARE/FLARE LINENITROGENZn MI- I-1 -I>-w 011-DIESEL DSLINSTRUMENT/ PLANT AIR IA/ UTAFLOW LINE FLOW LINEFENCE FENCEBUND WALLH :1 0 e 4 lASPHALT ROAD> U) 50BLUERIG ROAD BLUETRACK ROAD-lBLUEOIL WELL0 2WHITEWATER WELL5 EMAGENTA CABLE MARKER WHITE FIRE HYDRANTCRASH BARRIERU3GRIDSGRAY ~~G RAYOIL LAKEO I-OIL FIELDO O 'n O 8 n I Z J0 ,0VIEW PORTS BLACK7 CK WVP LMATCHLINE M 21. I DOC. N0.EG-DO-C-O01PAGE 20 OF 109REV. O | 6.3 Electrical DESCRIPTION CAD LAYER COLOUR No.COLOUR NAME LINE TYPEJOE 74 74 TPVC SHEATHED EARTHING CABLE ECABBUSBAR BUSBAR GREENEQUIPMENT EQ BLACKTELEPHONE CABLE 204CATHODIC PROTECTION 124ELECTRIC OVERHEAD CABLE REDGROUND BED REDCATHODIC PROTECTION BLUE TRANSFORM ER RECTIFIERSUBSTATION SS MAGENTATRANSFORMER TRANSF MAGENTAOVER HEAD LINE POLE/PYLONPY LO N CYANVIEW PORTSTEXTMATCH LINE6.4 Civil/ ArchitecturalDESCRIPTION CAD LAYER COLOUR N0. COLOUR NAME LINE TYPE 1EXTERNAL WALL GREENTOILET & BATH FIXTUREKITCHEN & PANTRY FIXTURE 6 MAGENTA 4J 5 E E KEG J E6 MAGENTA 22. DOC. N0.EG-DO-C-O01 IPAGE 21 OF 109REV. O6.4 Civil/ Architectural(Cont'd) DESCRIPTIONTYPE CONCRETE COLUMN CONC COLFENCE FENCE xxx VIEW PORTS VPGRIDS GR : - CRASH BARRIER CB 1 RED 0 TREES TRS 64 64MISCELLANEOUS 21 21FOUNDATION FND : ::: : mu TRACK ROAD TR 5 BLUE TEXT TXT 3 GREENMATCHLINE 7 BLACK ------ --6.5 Heating Ventilation & Air Conditioning DESCRIPTION CAD LAYER LINE TYPEHVAC EQUIPMENTH-EQBLUESUPPLY AIR DUCT RETURN AIR DUCT SUPPLY AIR DIFFUSERS- 6SUPPLYLA) ORETURNS-DIFFUSERMAGENTA 30RED RETURN AIR DIFFUSERS R-DIFFUSERHVAC REFRIGERANT PIPE H-PIPEHVAC DATA H-DATAHVAC UNIT 4HVAC TEXTWALLVIEW PORTSMISCELLANEOUS 21MATCHLINE 7 _--_--_ 23. DOC. N0.EG-DO-C-O01 PAGE 22 OF 109 REV. O7.0 LIi~'E CHARACTERISTICSDESCRIPTION V(, InD, T' LINE TYPEMATCHLINE 0.7 PHANTOM 2 CENTER LINE DEFAULT CENTER 2NEW PIPING ABOVE GROUND 0.5 CONTINUOUSNEW PIPING UNDER GROUND OR 0 5 DASH OBSCURED BY EQUIPMENT,WALL,ETC.'EXISTING PIPING ABOVE GROUND DEFAULT CONTINUOUSEXISTING PIPING UNDER GROUND OR OBSCURED BY EQUIPMENT,WALL,ETC. FUTURE PIPING DEFAULT CENTER 2DEFAULT DASHPROPOSED PIPING 0.5 CONTINUOUS OUTLINE OF EXISTING FACILITIES DEFAULT CONTINUOUSOUTLINE OF NEW FACILITIES 0.5 CONTINUOUSOUTLINE OF FUTURE FACILITIES DEFAULT CENTER 2WIDTH(mm) LINE TYPEDESCRIPTION NEW PROCESS LINE 0.40 CONTINUOUS EXISTING LINE DEFAULT CONTINUOUS AUXILIARY LINE (MINOR PROCESS/ UTILITY) DEFAULT * PHANTOM 2 FUTURE LINE DEFAULT CONTINUOUS BATTERY LIMIT 0.70 PHANTOM 2LIMIT OF VENDOR SCOPE OF SUPPLY DEFAULT CENTER 2INSTRUMENT AIR (PNEUMATIC SIGNAL) DEFAULT * CONTINUOUSINSTRUMENT LIQUID (HYDRAULIC SIGNAL) DEFAULT * CONTINUOUSELECTRICAL SIGNAL DEFAULT * HIDDENELECTRO MAGNETIC OR SONIC DEFAULT * CONTINUOUSINSTRUMENT CAPILLARY TUBING DEFAULT * CONTINUOUSNOTE:* FOR NEW WORK LINE WIDTH SHALL BE 0.30 mm 24. I DOC. N0.EG-DO-C-O01 PAGE 23 OF 109H REV. O | 8 0 SYMBOLS & ABBREVIATIONS8.1 Piping and Instrument Diagram (P & ID) Symbols8.1.1 Equipment Identification PrefixesAGITATOR/ MIXERZl-COLUMNS,SEPARATORS,DRYERSTAN KSFILTERS/ COALESCERS INSULATIONELECTRICAL EQUIPMENTHEAT TRANSFER EQUIPMENTBUILDINGSEVAPORATION PONDF FIRED HEATERS,FLARE STACKS,BURN PIT SPPUMPS (DRIVERS: GM= MOTOR,GT TURBINE,GE= ENGINE)SCRAPER LAU NCHER/ RECEIVER SPECIALTY ITEMSUMPVACUUM EQUIPMENT HP HOLDING POND VJ INSTRUMENT AND COMMUNICATION WEQUIPMENTCOMPRESSORS,BLOWERS,FANS Z (DRIVERS:KM= MOTOR,KT= TURBINE,KE= ENGINE)8.1.2D E EP G HFluid DesignationAA AERATION AIR FGINSTRUMENT AIR GHPLANT AIRAI APMATERIAL HANDLING EQUIPMENT VESSEL/ DRUMWASTE WATER TREATMENT UNITSPAC KAG ESFUEL GAS,PILOT GAS RICH GLYCOL INERT GAS (NITROGEN)BD BLOWDOWN AND RELIEFCRD CRUDE DRY GPCRW CRUDE WETNATU RAL GASPU RGE GAS LEAN GLYCOLCW CONTAMINATED WATER DC CHEMICAL DRAININJECTION CHEMICALPROCESS CHEMICALDD DEDICATED DRAINDH OILY DRAIN (OPEN) OHDO OPEN DRAIN (WATER)FUEL OIL (DIESEL)HYDRAULIC OIL LUBE OIL AND SEAL OILU "UPRESSURIZED DRAINSTORM DRAIN PESANITARY SEWERPROCESS CONDENSATE PROCESS EFFLUENT PROCESS GAS/ VAPOUREXPORT GASES ELECTRIC POWER SUPPLY RFFF FIRE FOAM VAmm mmPROCESS LIQUID REFRIGERANTVENT TO ATMOSPHERE 25. I DOC. N0.EG-DO-C-O01PAGE 24 OF 109REV. O | 8.1.2 Fluid Designation (COnt'd) VTVESSEL TRIM X CORROSION INHIBITORWC COOLING WATER SUPPLY ANTI-FOAMFIRE WATER XE DEMULSIFIERWD POTABLE WATER COAGULANTWO OILY WATER FOAMWP PRODUCED WATER/ FORMATION WATEROXYGEN SCAVENGER WR COOLING WATER RETURN XIXI XK XL XW XA METHANOLACIDCAUSTIC SOLVENT BIOCIDEHYPO CH LORITE PO LYE LECTROLITESCALE INHIBITOR VAPOR>< >< X 502 IG)"'|U0XB V 8.1.3 Insulation Designation (For Piping/ Equipment) A FACOUSTIC A FIREPROOF & ACOUSTICC COLD HA HOT ACOUSTICCA COLD ACOUSTIC HC HEAT CONSERVATIONCOLD & SPECIAL ACOUSTIC HOT & SPECIAL ACOUSTICET ELECTRICAL TRACING PP PERSONNEL PROTECTIONE HEAT 81 ACOUSTIC W/ ELECTL.TRACING SA SPECIAL ACOUSTICTA 8.1.4 Line Continuations P&ID N0- LINE ENTERING/ LEAVING P&ID.XXX-X-XXX FLUID DESIGNATION/ DESTINATION/ ORIGIN (NOTE 1)XX-FLUID DESIGNATION (APPLICABLE TO DRAIN,RELIEF,VENT,VENT,BLOWDOWN AND OTHER UTILITIES WHERE SEPARATEDISTRIBUTION P&ID PLANNED FOR)1. SHOW FLUID NAME AND ITEM NO.OF DESTINATION OR ORIGIN.EXAMPLE:HP DRY CRUDE TO HP SEPARATOR 407-C-O01 26. DOC. N0.EG-DO-C-O01 PAGE 25 OF 109II REV. O8.1.5LSHH-1111AINSTRUMENT IDENTIFICATIONTRAIN=1,2,3, ETC.(COMMON=0) SEQUENTIAL NUMBERSUFFIX (OPTIONAL)8.1.6 Instrument Line SymbolsInstrument Tag Number Identification /Instrument IdentificationINSTRUMENTS ARE IDENTIFIED FOR LEVEL,FLOW,PRESSURE AND TEMPERATURE ETC.AS FOLLOWS:(EXAMPLE FOR LEVEL)LSHH LEVEL SWITCH HIGH HIGHLSH LEVEL SWITCH HIGHLT LEVEL TRANSMITTERLC LEVEL CONTROLLERLI LEVEL INDICATORLG LEVEL GAUGELSL LEVEL SWITCH LOWLSLL LEVEL SWITCH LOW LOWLAHH LEVEL ALARM HIGH HIGH (TYPICAL)PN EUMATIC SIGNALHYDRAULIC SIGNALCAPILLARY TUBINGELECTRICALDCS SOFTWARE OR FIRMWARE LINKTELEMETRY SIGNALELECTROMAGNETIC/ SONIC SIGNALLOCALLY MOUNTED INSTRUMENTINSTRUMENTS SHARING COMMON HOUSINGLOCALLY MOUNTED INSTRUMENT (FUTURE)LOCALLY MOUNTED INSTRUMENT (EXISTING)LOCALLY MOUNTED FOUNDATION FILEDBUS COMPLIANT INSTRUMENT LOCALLY MOUNTED PROFIBUS DP COMPLIANT INSTRUMENT 27. I DOC. N0.EG-DO-C-O01PAGE 26 OF 109REV. O I8.1.8 Local/ Local Panel/ Packaged Unit PanelPILOT LIGHT LOCALPROGRAMMABLE LOGIC OR SEQUENCE CONTROL FIELD MOUNTEDPROGRAMMABLE LOGIC OR SEQUENCE CONTROL ACCESSIBLE TO OPERATOR AT AUXILIARY LOCATIONPANEL OR SYSTEM INST.IN AUXILIARY ROOM OR CONTROL ROOMREAR OF PANEL OR BLIND INSTRUMENT SYSTEM IN AUXILIARY ROOM OR CONTROL ROOMPILOT LIGHT PANEL MOUNTEDINSTRUMENT LOCATED IN LOCAL GAUGE BOARDPILOT LIGHT LOCAL PANEL MOUNTEDINSTRUMENT LOCATED ON LOCAL PANEL ONE OR TWO DIGIT NUMBER SHALL BE USED TO IDENTIFY SPECIFIED LOCAL PANELINSTRUMENT LOCATED REAR OF LOCAL PANEL ONE OR TWO DIGIT NUMBER SHALL BE USED TO IDENTIFY SPECIFIED LOCAL PANELDCS VDU DISPLAYED INSTRUMENT IN CENTRAL CONTROL ROOMDCS VDU DISPLAYED INSTRUMENT IN CENTRAL CONTROL ROOM TREND OR SEQUENCE RECORDER FIRST CHARACTER DEFINED BY LOOP TYPEDCS VDU DISPLAYED SOFTWARE ALARM'13 I5DCS VDU DISPLAYED INPUT ALARM HARD WIRED OR SERIAL LINKDCS LOGIC NORMALLY ACCESSIBLE TO OPERATOR (XXX LOGIC DIAGRAM SHEET NUMBER)DCS LOGIC NOT NORMALLY ACCESSIBLE TO OPERATOR (XXX LOGIC DIAGRAM SHEET NUMBER)@$I 28. I DOC. N0.EG-DO-C-O01PAGE 27 OF 1098.1.10 Programmable Logic ControllersPROGRAMMABLE LOGIC OR SEQUENCE CONTROL ACCESSIBLE TO OPERATOR (YYY PLC NUMBER) (XXX LOGIC DIAGRAM SHEET NUMBER)PROGRAMMABLE LOGIC OR SEQUENCE CONTROL NOT ACCESSIBLE TO OPERATOR (YYY PLC NUMBER) (XXX LOGIC DIAGRAM SHEET NUMBER)ESD NORMALLY ACCESSIBLE TO OPERATOR (Y SHUTDOWN LEVEL) (XXX ESD LOGIC DIAGRAM SHEET NUMBER)ESD NOT NORMALLY ACCESSIBLE TO OPERATOR (Y SHUTDOWN LEVEL) (XXX ESD LOGIC DIAGRAM SHEET NUMBER)INPUT TO SHUTDOWN SYSTEM WITH S/ D LEVEL (Y) OUTPUT FROM SHUTDOWN SYSTEM WITH S/ D LEVEL (Y)8. 1 .1 1 SCADA SystemREMOTE TERMINAL UNIT(SCADA)8.1.12 MiscellaneousFUNCTION INSTRUMENT RELAYSQUARE ROOTADD OR TOTALISE SUBTRACTBIASHIGH SELECTLOW SELECT MULTIPLYDIVIDEINTEGRAL FUNCTION SET POINT LIMITS OTHER FUNCTIONS AS PER I. S.A. -I | > INTERLOCK GATE (ARROW DENOTES DIRECTION OF LOGIC)3 WAY PNEUMATIC HAND SWITCH 4 WAY PNEUMATIC HAND SWITCH8.1.13 Level InstrumentsLEVEL SWITCHLEVEL TRANSMITTER EXTERNAL FLOAT TYPE (TRANSMITTERS/ CONTROLLERS/ GAUGE GLASSES)DIFFERENTIAL TYPE LEVEL INDICATING TRANSMITTERINTERNAL FLOAT TYPE LEVEL INSTRUMENTLEVEL GLASS (ILLUMINATED)PRESSURE INDICATING TRANSMITTERCHEMICAL/ DIAPHRAGM SEAL 30. I DOC. N0.EG-DO-C-O01 PAGE 29 OF 109REV. OOT8.1.16 Flow InstrumentsFLOW TRANSMITTER (ORIFICE PLATE)IOQAIXXOSENIOR ORIFICE FITTINGFLOW TRANSMITTER (VENTURI,DALL OR FLOW NOZZLE)RESTRICTION ORI FICE"IN LINE" TYPE FLOW METERS (TARGET - TGT) (MAGNETIC FLOW -MAG) (CORIOLIS - COR) (THERMAL MASS FLOW -TMF)(ULTRASONIC FLOW - ULT) (VORTEX FLOW - VOR)POSITIVE DISPLACEMENT INDICATING METER WITH INTEGRATORTURBINE METERVARIABLE AREA METER (ROTAMETER)FLOW TRANSMITTER (PITOT TUBE/ ANNUBAR)VORTEX FLOW TRANSMITTERIgwwFLOW STRAIGHTENING VAN ES 31. I DOC. N0.EG-DO-C-O01PAGE 30 OF 109REV. O I8.1.17 Miscellaneous Symbols for P&IDINSULATING FLANGESPEC.BREAK/ LINE NUMBER CHANGE/ INSULATION LIMITABOVEGROUND/ UNDER GROUND DEMARCATIONINSULATION AND ELECTRICAL TRACINGREMOVABLE SPOOLBARRED TEEINSULATION.(e. g. PERSONNEL PROTECTION)SPECTACLE BLIND (CLOSED)WELD CAPSPECTACLE BLIND (OPEN)HAMMER/ PADDLE BLIND OR SPADECONCENTRIC REDUCERRING SPACERY-TYPE STRAINERECCENTRIC REDUCERLINE JOINED WITH COUPLINGSY-TYPE STRAINER WITH 1/2" VALVE NORMALLYCLOSED AND PLUGGED. T-TYPE STRAIN ERSILENCERFLAME ARRESTORFEMALE HOSE CONNECTIONMALE HOSE CONNECTION WITH CAPINSTRUMENT FILTERSIGHT GLASSLINE (2% SLOPE MINIMUM)EXPANSION BELLOWSFLEXIBLE HOSEIN LINE FILTERTUNDISH WITH SAND COVERVORTEX BREAKERATMOSPHERIC VENTDEMISTER PAD/ WIRE MESH SCREENATMOSPHERIC VENT WITH MESH SCREEN 32. l DOC. N0.EG-DO-C-O01PAGE 31 OF 109REV. O | 8.1.17 Miscellaneous Symbols for P&ID (Contd)TIE-IN NUMBER(XXX TIE-IN NUMBER) (YYY PLANT NUMBER)VENDOR TIE-IN POINTPU LSATION DAMPERT-TYPE STRAINER (TEMP. )BREATH ER CAPDUPLEX STRAINERCONE TYPE STRAINER (TEMP. )ANALYZERBLOWER INLET SILENCERNEW PROCESS LINEBLOWER INLET FILTER SILENCERAUXILIARY LINE (UTILITY)STATIC MIXEREXISTING LINEDISTRIBUTOR/ SPRAY NOZZLEFUTU RE LI N ESPECIAL PIPING ITEM (XXX ITEM NUMBER)BATFE RY LI MITEXHAUST HEADUTILITY STATIO N W-WATER,A-AIR,N- NITROGENDF-DRINKING FOUNTAIN,SS-SAFETY SHOWER EW-EYE WASHLIMIT OF VENDORS SCOPE OF SUPPLYSAMPLE CON N ECTIONVESSEL INSULATORTUNDISH 33. I DOC. N0.EG-DO-C-O01PAGE 32 OF 1098.1.18 Valves for Piping and Instrument DiagramDQ GATE VALVE Do] GLOBE VALVE| 4 CHECK VALVEBUTTERFLY VALVE0 BALL VALVE | ( PLUG VALVEANGLE VALVE 3-WAY VALVEEQUALISING VALVECHOKE VALVE ON MAIN BODYE 2 S FLOAT OPERATED VALVE 4-WAY VALVEDRAIN VALVE ON :RECIRCULATION VALVE MAIN BODY8.1.19 Equipment0?VERTICAL VESSEL HORIZONTAL VESSEL HORIZONTAL VESSEL (WITH DEMISTER) (WITH BOOT)W: >= RSCRAPER LAUNCHER/ RECEIVER TRAY TOWER PACKED COLUMNFI LTER(CARTRIDGE) COALESCING FILTER (CARTRIDGE) 34. l DOC. N0.EG-DO-C-O01PAGE 33 OF 109REV. O IQ ii QOPEN TANK FLOATING ROOF TANK CONE ROOF TANKE GDOME ROOF TANK RECTANGULAR TANK CYLINDRICAL TANKd) Heat Exchangers / (GATE) LOCALLY OPERATED8.1.21 Instrument Valves for P & ID (Safety)EPRESSURE SAFETY VALVE THERMAL SAFETY [email protected] M@RUPTURE DISC VA (PRESSURE RELIEF)PRESSURE RELIEF/ VACUUM BREAKER VALVE (FOR TANKS)RUPTURE DISC (VACUUM BREAKER) 41. DOc. No. EG-DO-C-001PAGE 40 OF 109REV. O I8.1.22 Typical Instrument Connections8.1.22.a Pressure Instrument Connections (For Notes See Page N0-42)TYPE DETAIL P & I D REPRESENTATIONSINGLE " INSTPRESSURE ' INSTRUMENTS . . EIPINGMULTIPLE PRESSURE INSTRUM ENTS 8.2.22.b Dp Instrument Connections (For Notes See Page N0-42)TYPE DETAIL P & I D REPRESENTATION PIPING INST 2..LEVEL PIPING INSTT FLOW 8.2.22.c Temperature Instrument Connections (For Notes See Page No.42)TYPE DETAIL P &I D REPRESENTATIONTEMPERATURETEM PERATU RE 42. I DOC. N0.EG-DO-C-O01 8.1.22.dPAGE 41 OF 109Level Instrument ConectionsREV. O(For Notes See Page No.42)Level Switches,Level Gauges,External Float (but Not DP Cells)TYPELEVEL SWITCHDETAILe2..|>| |INST 3/4" PIPING IN5T- DRAIN PIPING3/4..PIPING INST.DRAIN PIPING 43. I DOC. N0.EG-DO-C-O01PAGE 42 OF 109REV. O I8.1.22.e Control Valve Manifold Conections (See Notes) TYPE DETAIL P &I D REPRESENTATIONPRESSURE LEVEL FLOWE1. a.INSTRUMENT CONNECTIONS ARE TYPICAL ONLY.DETAILS SHALL BE MODIFIED TO MATCH RELEVANT PIPING SPECIFICATION.ONLY LINE CLASS PIPING VALVES WILL BE SHOWN ON P&ID'S.FOR INSTRUMENT ISOLATION VALVES REFER TO INSTRUMENT HOOK-UP DRAWINGS. .MEASUREMENT AND CONTROL INSTRUMENT SHALL BE INDEPENDENT OF SAI-_| 'EY INSTRUMENTS. .ALL SHUTDOWN SWITCHES FOR PROCESS PARAMETERS SHALL HAVE INDEPENDENT TAPPING FOR EACH OF THEM. .ALL INSTRUMENT CONNECTIONS AT HIGHER PRESSURE (CLASS 900 & ABOVE) SHALL BE PROVIDED WITH DOUBLE INSOLATION VALVES. .HYDROCARBON VENTS AND DRAINS FROM LEVEL INSTRUMENTS & CONTROL VALVES SHALL BE CONNECTED TO THEIR RESPECTIVE DISPOSAL SYSTEMS. .TYPICAL LEVEL BRIDLE SHOWING ISOLATION VALVES,VENTS & DRAINS.ALL DETAILS TO BE MODIFIED TO MATCH TO RELEVANT PIPING SPECIFICATION. LINE CLASS VALVES ARE INDICATED,INSTRUMENT VALVES ARE NOT SHOWN. .LEVEL SWITCHES TO HAVE SEPARATE VESSEL NOZZLES WHEN INTERLOCKED WITH ESD SIGNALS. .SHOW BALL VALVE FOR HYDROCARBON SERVICE.SHOW GATE VALVE FOR NON-HYDROCARBON SERVICE. 44. I DOC. N0.EG-DO-C-O01PAGE 43 OF 109REV. O I8.1.22.f Level Bridle Presentation (For Note-2 See Page N0-42)TYPICAL LEVEL BRIDLE DETAIL P & I D REPRESENTATIONLEVEL BRIDLE WITH STAND PIPEVESSEL OR TANKVESSEL OR TANK* INSTRUMENT CONNECTIONA.LEVEL GAUGE (LG) :1"B.LT (D/ P CELL TYPE) :3/4"C.LT (DISPLACEMENT TYPE) :2"D.LS (EXTERNAL TYPE) :1"(INSTRUMENT VALVES ARE NOT SHOWN)LEVEL BRIDLE WITHOUT STAND PIPE VENTVESSEL ORTANK VESSEL OR TANKINSTRUMENT CONNECTION .LEVEL GAUGE (LG) :1" .LT (D/ P CELL TYPE) :3/4" .LT (DISPLACEMENT TYPE) :2" .LS (EXTERNAL TYPE) :1" (INSTRUMENT VALVES ARE NOT SHOWN) 45. I DOC. N0.EG-DO-C-O01PAGE 44 OF 1098.1.23 Typical Shutdown and Vent Valves 8.1.23.a Double Acting ESD ActuatorTYPICAL INSTRUMENT AIR HOOK-UP'S FOR ALL SHUTDOWN/ VENT VALVES (NOTE 1)* CHANGE SYMBOL FOR DCS BASED LOGIC TO SUITNOTE: 1. SINGLE OR DOUBLE ACTING ACTUATOR TO BE SELECTED IN ACCORDANCE WITH REQUIRED VALVE OPENING/ CLOSING SPEED AND TORQUE. 46. I DOC. N0.EG-DO-C-O01PAGE 45 OF 109REV. O I8.1.24 Safety Blow Down Valve,Emergency Shutdown Valve 8.1.24.a Safety Blow Down Valve Controlled By ESD LogicDETAILS P&ID REPRESENTATIONAVAILABLE CLOSE OPENNE N3 @ M M MC. I P O I 0/ / //. OPEN CLOSE OPEN E3 Eh W @ I IXXX =LOOP NUMBERNOTES: 1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX2. ALL BLOWDOWN VALVE & ESDVS TO BE PROVIDED WITH A DEDICATED INSTRUMENT AIR ACCUMULATOR. 47. I DOC. N0.EG-DO-C-O01PAGE 46 OF 109REV. O I8.1.24.b Emergency Shut Down Valve Controlled By ESD LogicDETAILS P&ID REPRESENTATIONIND.RESET READY FOR START ACCEPTED RESET / /V/ / |// / TRIPPED Io I/ /// //TRIP F--- ___ I I I l I I I ICLOSE OPEN Eh Eh w& WXXX =LOOP NUMBERNOTES: 1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX2. ALL BLOWDOWN VALVE & ESDVS TO BE PROVIDED WITH A DEDICATED INSTRUMENT AIR ACCUMULATOR. 48. I DOC. N0.EG-DO-C-O01PAGE 47 OF 109REV. O IIND.RESET READY FOR START ACCEPTED RESETas / PROCESS INTERRU PTCLOSE OPENmm mm 0 O I I I | XXX =LOOP NUMBERJ1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX2. ALL BLOWDOWN VALVE & ESDVS TO BE PROVIDED WITH A DEDICATED INSTRUMENT AIR ACCUMULATOR. 3. PROCESS INTERRUPT LOGIC SIGNAL. 49. I DOC. N0.EG-DO-C-O01PAGE 48 OF 109REV. O I8.1.24.d ESDVContro| |ed by ESD Logic and Compressor Antisurge ControlIND.RESET READY FOR START ACCEPTED RESETTRIPPEDPROCESS INTERRUPT TRIP CLOSE OPEN % as m 0 0XXX =LOOP NUMBERJ1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX2. ALL BLOWDOWN VALVE & ESDVS TO BE PROVIDED WITH A DEDICATED INSTRUMENT AIR ACCUMULATOR. 3. PROCESS INTERRUPT LOGIC SIGNAL. 50. I DOC. N0.EG-DO-C-O01PAGE 49 OF 109REV. O I8.1.24.e Emergency Shut Down Valve Controlled by ESD Logic and ESD Logic Output. DETAILS P&ID REPRESENTATIONIND_ RESET READY FOR START ACCEPTED RESET/ XXX =LOOP NUMBERNOTES: 1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX2. ALL BLOWDOWN VALVE & ESDVS TO BE PROVIDED WITH A DEDICATED INSTRUMENT AIR ACCUMULATOR. 51. I DOC. N0.EG-DO-C-O01PAGE 50 OF 109REV. O IAVAILABLE CLOSE OPENW1 7% W3 PROCESS W W@ M TRIPPEBINTERRUPT O O/O I /o , / / 2/ I. __CLOSE OPENEEEQ MW 00XXX =LOOP NUMBERJ1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX2. ALL BLOWDOWN VALVE & ESDVS TO BE PROVIDED WITH A DEDICATED INSTRUMENT AIR ACCUMULATOR. 3. PROCESS INTERRUPT LOGIC SIGNAL. 52. DOC. N0.EG-DO-C-O01 PAGE 51 OF 109 REV. ODETAILS P&ID REPRESENTATIONLOCAL/ O FF REMOTEXXX =LOOP NUMBER1. FOR PROCESS SHUTDOWN LOGIC REFER TO CAUSE AND EFFECT MATRIX 53. DOC. N0.EG-DO-C-O01 PAGE 52 OF 109 REV. ODETAILS P&ID REPRESENTATIONOPEN I H5 . XXXA/ CLOSEI H5 ggxxc. OPEN I HSQXX'? /STOP HSXXX E/ CLOSE E )(XXFLOCAL/ O FF REMOTE HS? XXG/ LOCAL/. ULREMOTE IomXXX =LOOP NUMBER 54. I DOC. N0.EG-DO-C-O01PAGE 53 OF 109RED RED GREEN GREENe oooo e W W IOPEN OPEN,IOPEN ISTOP ICLOSEICLOSEI------ K ) '------IALL INSTRUMENTS TO CARRY THE SAME TAG NUMBER AS CORRESPONDING MOV'S. 8.1.25.b Remote Operated ValveDETAILS P&ID REPRESENTATIONOPEN REMOTE EB El CLOSE OPEN @ Eh @ @ OCAL/ OFF I I REMOTE Ixxxx =LOOP NUMBER (NOTES 1,2)L1. DURING REMOTE OPERATION CONTINUOUS DEPRESSING OF OPEN OR CLOSE SOI-TI" PUSH BUTTON ON DCS OPERATOR INTERFACE CAUSE VALVE TO TRAVEL.RELEASE OF SOFT PUSH BUTTON LEVELS VALVE IN LAST POSITION. 2. TYPE OF VALVE SHALL BE AS SHOWN ON RESPECTIVE P&ID. 55. DOC. N0.EG-DO-C-O01PAGE 54 OF 109REV. O8.1.26 Motor InstrumentationNOTE 2m m DU/ STANDBY oOo OOO SELECT sroppeo @ MOTOR WW STARTOAVAILABLE NOTE 1 I 0REMOTE IIOIFAULT 0STOP ooO %