Citation preview
DETAIL I
SECTION
DETAIL II
GLASS STEEL STRUCTURE
STEEL WINDOWS AND DOORS DINTELS
STEEL STAIRWAYS
ELECTIVE PART- DESIGN MANAGEMENT
HYLKE SCHOOL
DETAIL 4.
CORNER OF
FRAME
DETAIL 3. HEB
180 – IPE 120
DETAIL 2.
FIXING METAL
STRUCTURE
DETAIL 1.
FOUNDATION
DETAIL 5. ROOF
BEAMS
STEEL GLASS
STRUCTURE
DETAIL 6.
BEAMS
CONNECTION
DETAIL 7.
BRIDGE
CONNECTIONS
DETAILS 8. HEB
180 – IPE 120
STEEL STRUCTURE
GROUNDFLOOR
STEEL STRUCTURE
FIRSTFLOOR
DETAIL 4.
CORNER OF
FRAME
DETAIL 3. HEB
180 – IPE 120
DETAIL 2.
FIXING METAL
STRUCTURE
DETAIL 1.
FOUNDATION
DETAIL 5. ROOF
BEAMS
STEEL GLASS
STRUCTURE
DETAIL 6.
BEAMS
CONNECTION
DETAIL 7.
BRIDGE
CONNECTIONS
DETAILS 8. HEB
180 – IPE 120
STEEL STRUCTURE
GROUNDFLOOR
STEEL STRUCTURE
FIRSTFLOOR
DETAIL 9. UPN 80
FOUNDATION
DETAIL 10. UPN
80 - IPN 160
NEW STEEL
DINTELS
DETAIL 11.
WOODEN SLAB –
STEEL DINTEL
STEEL STAIRWAYS
DETAIL 12.
START
CONNECTION
DETAIL 13. HEB
180
FOUNDATION
DETAIL 14. HEB
180 – IPE 120
DETAIL 15.
STAIRS AND
WOODEN SLAB
DETAIL 9. UPN 80
FOUNDATION
DETAIL 10. UPN
80 - IPN 160
NEW STEEL
DINTELS
DETAIL 11.
WOODEN SLAB –
STEEL DINTEL
STEEL STAIRWAYS
DETAIL 12.
START
CONNECTION
DETAIL 13. HEB
180
FOUNDATION
DETAIL 14. HEB
180 – IPE 120
DETAIL 15.
STAIRS AND
WOODEN SLAB
CASE
SPECIFICATION
PERSONAL
PLANING
ACTIVTY LIST
TIME
SCHEDULE
WORK
SPECIFICATION
BPM DRAWING LIST
BUILDING SITE
PLAN
TENDER
INVITATION
SPECIFICATIONS
TENDER
TENDER FORM TENDER
CONTROL PLAN
WORKERS
PLANING LEGAL
TIMELINE
DESIGN MANAGEMENT
Design managers mission The design is a more global concept than only
draw or defines shapes, objects and products.
The figure of the Design Manager is a
professional who is dedicated to design
thinking about the important asset for the
company, and how to manage it strategically to
provide the company or institution in a leading
position in the market, obtaining profitability.
The opportunity for Design Manager is
demonstrate how design can help to link
creativity and innovation.
ORGANIZE
DEVELOP
DESIGN
1. INDENTIFY NEEDS
Costumer requirements:
Multifunction for the city and surrounding rural area.
Accessible elevator to all floors.
Level free access
Parking areas for bus and for disabled people.
The school must be integrating 3 classrooms with app. 15 – 20 pupil
Activity areas for 60 – 70 people.
Activity rooms for habitants could be:
- Gymnastics for children
- Mother and child gymnastics - Spinning
- Fitness
- Meeting room and kitchen
- Club facilities for the youth
Integration of the local library
CONCLUSION
CHANGES AND REASONS:
Incorporation of glass structure: the large
glass entrance shell creates a space connected
directly with the nature that helps in the
learning of children.
It is between the fitness and education area,
creating independent spaces according to their
function.
Incorporation main entrance ramp: access
adaptation to disabled people in order to make
easier the access at the school.
Incorporation of the elevation; adaptation for
the disabled people to make easier the access to
any part of the building.
Incorporation a sliding wall between two
classes in order to creates the possibility of
expanding space.