Projects Involved
1. SOFO Condominium – Kuala Lumpur
2. 9Th Miles Lutheran Church
3. D’Marina - Kuantan
Duration of Internship
03.01.17 – 08.03.17
Submission Date
10.03.17
INTERNSHIP REPORT CONTENT
Foreword Testimonial Letter Clement Wong Architecture Company profile Expectation & Objective of Internship Architectural
Academic Skill Authorities Meeting CCM Landscape Design Presentation Contractual and Legal Policy
Site Construction
Site Meeting Tender Meeting
Corporate
Developer’s Meeting Implementation Schedule Investor Chairman Meeting
Internal Administrative
SI Research Weekly Meeting
Internship Log Sheet Week 1 - 8 Reflection
Foreword
As a part of my Degree Course at Taylor’s University
Lakeside Campus , followed after the end of 5th
semester, I applied my internship in Clement Wong
Architecture.
My focus areas for the internship were following:
- To experience the real word architecture field.
- To gain more knowledges that can’t learn in
academic.
- To get competences and skills within the field
of architecture; included Contractual, Law
and Regulations, Authorities, Materials etc.
- Experience working for a company that
contain several competences, to get an
insight in other professions as well as my own
profession.
I spend my internship at the architecture firm at in
Clement Wong Architecture in a period of 2 months.
Testimonial Letter
Clement Wong Architecture Company profile
We are a young and dynamic architecture firm focusing on sustainable design and a touch of creativity. Our projects consist of residential, institutions, commercials, high rise and resorts. We focus on architecture that conserves energy, limits environmental impact and contributes to user’s enjoyment of life, expressing it in an uplifting, inspiring and contextually appropriate built environment. Our focus on green building design and it is our commitment to productively engage in the global community. We provide an office space for research and design experiment including vertical garden, rain water harvest, sustainable construction methods and low carbon foot print material etc.
Appendix 0.0 Group Photo of Young Architects in Clement Wong Architecture
Expectation & Objective of Internship
The expectations Clement’s expectations of me as an intern in the
company was first of all, that I could work in a 120% position, 40
hours a week. I was hired like a regular employee with an hourly
wage. My scopes of work during the internship were to do projects
within architecture and Project Management (Construction
Side). Especially working with detailed Technical Design,
Contractual, Site visit, Reports/ Minutes and Internal
Administration, depending on the projects they were having at the
time and what they could offer me to join. My own expectations for
the internship and the projects the corresponded well with what the
senior supervisor and complete the task given with understanding.
My goal was to improve my skills and knowledges that I cannot
learn during my university life. With this in mind I expected to enter
a field where I wouldn’t have much knowledge and a lot to learn.
Especially in the technical detailing parts of projects.
Expectations & Objectives of Internship Objectives I wanted to
archive some professional skills, methods and technics, and
learn more about designing in detail. By working in Clement Wong
Architecture as a company with various competences within the
clients, consultants and contractors. I also found it attractive to
get an insight of how the company are collaborating between the
different departments.
Architectural Academic Skill
SOFO RENCANA
Project Title: Cadangan Pembangunan Komersial 2 Block Pejabat 15 Tingkat
Location: Sungai Pencala, Kuala Lumpur
Appendix 1.0 Overview of SOFO Rencana Condominium
Appendix 1.1 Overview of SOFO Rencana Condominium
During the first week, I was given a task of helping with Technical Details Drawings for Tender.
The space I draft is the Section Drawings of Staircases and Toilets. The section drawings is not tally
to the floor plan, so I have to draft section drawings according to the floor plan correctly.
SOFO RENCANA
Project Title: Cadangan Pembangunan Komersial 2 Block Pejabat 15 Tingkat
Location: Sungai Pencala, Kuala Lumpur
Appendix 1.3 Ground Floor Plan & First Floor Plan
Appendix 1.4 Sectional Detail Drawings of Staircases
9Th Miles Lutheran Church
Project Title: Cadangan Pembangunan Komersial 2 Block Pejabat 15 Tingkat
Location: Cheras, Selangor
Appendix 1.0 Ground Floor Plan & First Floor Plan
Appendix 2.0 First Floor Plan
Appendix 2.1 Floor Plan and Sectional detail drawings
Architectural Authorities Meeting D’Marina Kuantan PR1MA Project Title: Cadangan Pembangunan Perumahan Yang Mengandung : Fasa 1 & Fasa 2
Location: Kuantan, Pahang
Appendix 3.2 BP Drawings Comment with Head Officer
During week 2, I was given an opportunity to
attend the submission of BP drawings in
Kuantan. This is the 3rd submission of BP to
Majlis Perbandaran Kuantan (MPK). This trip
is to seek the comments from the authority.
We went to the department called Bahagian
Bangunan‘s (Building Type Planning) Meeting
Room. Then the lady head office will give
comments of our submitted drawings. The
comments or changes are made according to
the Uniform Building By Laws (UBBL). There
is one important thing which they focused on
OKU (Disable) facilities. Fortunately, the
building plan was all great and we just have to
wait for the approval from upper stage.
Appendix 3.0 Preparation and checking of BP drawings
Appendix 3.1 Front view of MPK Kuantan
During week 2, We are have to prepare our BP
drawings to submit to Kuantan the next day.
Before submission, we have to check again the
whole set of drawings and get sign by our boss
and the developer.
D’Marina Kuantan PR1MA
Project Title: Cadangan Pembangunan Perumahan Yang Mengandung : Fasa 1 & Fasa 2
Location: Kuantan, Pahang
Appendix 4.0 Bomba Station in Kuantan
Appendix 4.2 BP Drawings Comment with Head Officers Appendix 4.1Comment Sheet for BP Plan by MPK
During week 3, we made an appointment with the fire station authority with the BP submission
comment meeting in Kuantan. During the Comment Meeting, the office claimed that some space
to be change about the issues of fire escape, such as staircase, fire exit, type of fire door and
placement of fire hydrant etc.
Architectural CCM D’Marina Kuantan PR1MA Project Title: Cadangan Pembangunan Perumahan Yang Mengandung: Fasa 1 & Fasa 2 & Fasa 3
Location: Kuantan, Pahang
During week 2, my supervisor which is project architect of the project brought me to the first Client
Consultants Meeting (CCM). In this 10th CCM, the architect chaired the meeting and discuss about the
several matters such as Authority, Pre-consultation, KM, C&S, Infra, Land and Site Issues. By the
way, they are mainly focus on the Land Matters in this Meeting. There are several documents had not
submitted that caused delay of the payment and schedule of KM. CCM will be held every 2 weeks unless
there are some emergency issues, it will immediately issue emergency meeting.
Appendix 5.0 CCM Minutes 10 Agenda
Architectural Landscape Architecture D’Marina Kuantan PR1MA Project Title: Cadangan Pembangunan Perumahan Yang Mengandung: Fasa 1 & Fasa 2 & Fasa 3
Location: Kuantan, Pahang
During week 4, I attended the presentation of Landscape Architecture by Urbanis Landscape. The presentation
presented about the design concept, cost and quantity, type of landscapes and vegetation, facilities and
requirements by the client. The landscape architect designed the landscape mainly base on the cost and project
brief requirement to produce the first proposal, there are some comments to the landscape architect such as the
appropriate distance between vegetation, the pavement materials and the canopy & pavilion design strategies.
Appendix 6.0 Proposal of Landscape Architecture by Urbanis Architecture
Architectural Contractual and Legal Policy The Architect as Contract Administrator A Legal Perspective My boss Clement handed me this book to read,
the content of this book is about how is an
architect’s scope of work, building contract
and PAM Form Clauses. This is a guideline
when an architect start up his own firm to be
learned in some legal contractual perspective
and what position should an architect be in
construction site. There are also some rules
and regulations clarified by PAM organization
to follow.
Appendix 7.0 Scope of work of Architect
Appendix 7.1 Cover Page of PAM Contract 2006
PAM Agreement and Condition Of PAM
contract 2006 is also another contractual guide
documents which we have to learn and
understand in the future. Inside it, there is
some formal and legal agreements of different
articles to different consultants. Besides, it
consist of conditions of the contract. There are
lots of clauses to follow, which importantly
includes Contract Documents, Programme
and As-Built Drawings, Obligations, Fees
and Charges.
Site Construction Site Visit & Meeting
D’Marina Kuantan PR1MA
Project Title: Cadangan Pembangunan Perumahan Yang Mengandung: Fasa 1 Dan Fasa 2
Location: Kuantan, Pahang
Appendix 8.0 Site Office
Appendix 8.1 Borehole Progress Status
On week 5, I was assigned to work under Domus Project Management Company, I got my first time to visit
our site which is in Kuantan. There are already held a site office with some presentation of the building types
and master layout model. We were having a site meeting due to the site matters which are Site Clearing,
Soil Investigation (SI) and earthwork filling progress work. In this Meeting, we discussed about the
Extension of Time (EOT) and also Extension of Contract (EOC) for some subcontractors because their
period or contract had been expired, should continue with approval.
D’Marina Kuantan PR1MA
Project Title: Cadangan Pembangunan Perumahan Yang Mengandung: Fasa 1 Dan Fasa 2
Location: Kuantan, Pahang
Appendix 8.2 Site Meeting Minutes 02
The site meeting minutes discussed about the land surveyor to peg out the boundaries and provide
Boundaries survey drawing for Fasa 1 and Fasa 2.
The SI meeting minutes discussed about the number of borehole (BH) and Cone Penetration Test (CPT)
to be marked and test.
Appendix 8.3 Soil Investigation Meeting Minutes 01
Site Construction Tender Meeting
D’Marina Kuantan PR1MA
Project Title: Cadangan Pembangunan Perumahan Yang Mengandung: Fasa 1 Dan Fasa 2
Location: Kuantan, Pahang
Tender Opening
On week 6, I am fortunately to be invited into tender meeting of Sewage Treatment Plan (STP) of contractor.
Firstly, the contractor had his presentation of his design and estimated cost the STP for the project. In the
meeting, there are clients, us architect, developer, C&S engineer (IR) and Quantity Surveyor (QS).
Architect and C&S Engineer will comment about the design, then QS will comment about the cost and policy
of the contract. After that, Qs will calculate out the Building Quotation (BQ) out and finalize the contract.
On week 7, each of the contractors’ envelope were sent to QS secretly, there come to a tender opening
session, which finalize all the estimated cost of every contractors. Then QS open out all the documents from
different contractors and choose the most valuable contractor. Then Qs will issue an Letter of Award (LA)
to determine the selected contractor legally as the STP contractor of this project.
Corporate Developer’s Meeting
D’Marina Kuantan PR1MA
Project Title: Cadangan Pembangunan Perumahan Yang Mengandung: Fasa 1 Dan Fasa 2
Location: Kuantan, Pahang
Implementation Schedule
Appendix 9.0 Implementation Schedule
On week 5, there is a developer’s meeting. Developer’s Meeting as also called as Internal Meeting, it is the
meeting within developer, architect, client, and project management. The meeting was discussed about
Cost and Time matter and problem to be issued. Besides, it was an informal meeting to update the client
and developer about the current situation of the construction site and the documentary to certain authorities.
We also discuss about the PR1MA Contract which call Master En-Bloc Purchase Agreement (MEBPA).
Internal Administration SI Research
D’Marina Kuantan PR1MA
Project Title: Cadangan Pembangunan Perumahan Yang Mengandung : Fasa 1 Dan Fasa 2
Location: Kuantan, Pahang
Boreholes include any drilled onshore and offshore, for any purpose and to any depth and include auger holes, shafts, pits,
auger holes, shot-holes, wells and vibro cores There are two main types of bore, open holes and cored holes and there are
two main types of drilling rigs, rotary and percussion.
The cone penetration or cone penetrometer test (CPT) is a method used to determine the geotechnical
engineering properties of soils and delineating soil stratigraphy. The test is also called, Dutch Cone test. Due to its simplicity
and efficiency, the cone penetration test is one of the most commonly accepted and used in-situ testing methods in
geotechnical investigation worldwide.
Weekly Meeting
Weekly Meeting is also called as “Monday Breakfast”. It
is because it start on every Monday. Couple of
colleagues have to take turns to prepare breakfast for
everyone. During breakfast, all of us have to do public
speaking and share some knowledges or resolution to
everyone. Our boss will give a lecture about knowledges
instead of architectural skill for 3 minutes session. After
that, it will start meeting to discuss each status of the
project from the previous week and achievements.
Appendix 10.0 Monday Breakfast
Internship Log Sheet Week 1
Internship Log Sheet Week 2
Internship Log Sheet Week 3
Internship Log Sheet Week 4
Internship Log Sheet Week 5
Internship Log Sheet Week 6
Internship Log Sheet Week 7
Internship Log Sheet Week 8
Conclusion
To sum up, I have learnt two different knowledges during this 2 months internship. Firstly, Architecturally
I improve my software skill which is Autocad to draw technical detail drawings. On the other hand, I have
learnt more knowledges from Project Management about the contractual, legal documents by architects,
and construction site. I appreciate that I have an opportunity to learn some of the construction knowledges.
It is important to gain some information from the construction site. In university, we will learn about SPACE
AND TIME, when we come to real industrial world, we learn one more which is COST. I have to thank to
my boss and colleague that give me so much pleasure chance to learn that I am not be able to learn in
university. Lastly, after internship we will be able to find our own direction or decision of our path in our
future.