31
Key Issues with a Global Studio Ross Brisco Design School, Loughborough University 27 th October 2016

Key Issues with a Global Studio

Embed Size (px)

Citation preview

Page 1: Key Issues with a Global Studio

Key Issues with a Global StudioRoss BriscoDesign School, Loughborough University27th October 2016

Page 2: Key Issues with a Global Studio

Ross BriscoPhD Research Student

Social Network Sites and collaborative distributed design teams

Award winning design engineer

Lecturer and mentor

Design 1, Product Development and Global Design.

Page 3: Key Issues with a Global Studio

Introduction Key issues with collaborative distributed design

Workshop task 1 Challenges in collaborative design

Workshop Task 2 How can software meet these challenges

Findings From E&PDE conference

Recommendations From global design project

Conclusions Including contact information

Page 4: Key Issues with a Global Studio

The four C’s of Computer-Supported Cooperative work University of Minnesota - Computer Science

Page 5: Key Issues with a Global Studio

Distributed Collaborative Engineering DesignComputer-Supported Cooperative Work• Communication• Propose• Environment• Resources• Membership• Process and structure

Computer-Supported Collaborative Design• Communication of design

artefacts• Supporting the design process• Making design decisions• Conducting design activities

Page 6: Key Issues with a Global Studio

Why is this important?

Social Media

Social Tools in Enterprise Millennial Generation

Mobile Communication

Page 7: Key Issues with a Global Studio

Why is this important?

“We propose that the proliferation of Web 2.0 technologies and their incorporation into the learning and teaching environment means that academic staff and students will need

to develop skills in digital literacy to participate effectively in distributed project-based collaborative work.”

“A Social Media tool that has been built specifically to support that type of Engineering Design Communication has the potential to provide a more collaborative method of

communication.”

Bohemia, E., & Ghassan, A. (2012). Globally networked collaborative learning in industrial design. American Journal of Distance Education, 26(2), 110–125. Gopsill, J. a, Mcalpine, H. C., Hicks, B. J., J.A., G., H.C., M., & B.J., H. (2014). Supporting engineering design communication using a custom-built social media tool - PartBook. In Proceedings of the 13th

International Design Conference DESIGN 2014 (Vol. 29, pp. 1785–1798.

Page 8: Key Issues with a Global Studio

CSCD tools

Groupware

Web 2.0

Social Software

Knowledge Management Systems

Knowledge Capture Systems

Team Organisation

Team Reporting

Team Awareness

Page 9: Key Issues with a Global Studio

3 Case studies

Page 10: Key Issues with a Global Studio

A social media approachJames Gopsill

Page 11: Key Issues with a Global Studio

Communication Channels

Social Network Site

Video Conference

Cloud StorageWith collaborative tools

James MAMO

Page 12: Key Issues with a Global Studio

Communication Channels

Social Network Site

Video Conference

Cloud StorageWith collaborative tools

James MAMO

Page 13: Key Issues with a Global Studio

Multidisciplinary Distributed TeamsLennart FAHNENMÜLLER

Page 14: Key Issues with a Global Studio

Workshop Task

Q1

Page 15: Key Issues with a Global Studio

What are the challenges of supporting collaboration during the design process?

Please write these challenges on a post-it note and stick it on the flip chart paper.

Question 1

Page 16: Key Issues with a Global Studio

What are the challenges of supporting collaboration during the design process?

Please discuss the post-it notes in your teams and pick the three key challenges using the dots to vote.

Question 1

Page 17: Key Issues with a Global Studio

What are the challenges of supporting collaboration during the design process?

Share with the room. Please nominate a speaker to share your three key challenges.

Question 1

Page 18: Key Issues with a Global Studio

Workshop Task

Q2

Page 19: Key Issues with a Global Studio

Which functionality of social software can be used to overcome these challenges?

Discuss in your teams and write these on the flip chart paper.

Question 2Web 2.0Social Network SitesGroupware

Page 20: Key Issues with a Global Studio

Which functionality of social software can be used to overcome these challenges?

Share with the room. Please nominate a speaker to share your solutions.

Question 2

Page 21: Key Issues with a Global Studio

Findings from E&PDE 2016 Workshop

Page 22: Key Issues with a Global Studio

Outcomes from the E&PDE 2016 workshop• Teamwork

• Prompt replies• Group discussion • Software • Learn about each others skills• Facilitate collaborative work

• Data Storage• Real time synchronous work

• Tools• Versioning • Whiteboards• Ideation support • Knowledge Management

Page 23: Key Issues with a Global Studio

Workshop Task

Recommendations

……….…….….

……………….

Page 24: Key Issues with a Global Studio

Which three guidelines would you create to inform future distributed design engineers?

Discuss in your teams and write these on the flip chart paper.

Question 3

Page 25: Key Issues with a Global Studio

Which three guidelines would you create to inform future distributed design engineers?

Share with the room. Please nominate a speaker to share your solutions.

Question 3

Page 26: Key Issues with a Global Studio

Initial Recommendations

Page 27: Key Issues with a Global Studio

Recommendations: Communication

Students should discuss and test software that will aid global communication before beginning any design tasks.

A single social network platform should be used.

Page 28: Key Issues with a Global Studio

Recommendation: Communication

A video conference tool should be used regularly to simulate face-to-face meetings.

Students should use a cloud storage solution.

Page 29: Key Issues with a Global Studio

Recommendations: Communication

All tools (social network, cloud storage and video conferencing) should have fully featured mobile applications.

Page 30: Key Issues with a Global Studio

Recommendations: Process and Structure

One team member should be assigned the role of minute secretary.

One team member should be assigned the role of communications secretary.

Page 31: Key Issues with a Global Studio

Thank you for your attention

Messenger: RossBriscoTwitter: @[email protected]

tinyurl.com/Global99