Upload
tara-warner
View
16
Download
0
Embed Size (px)
Citation preview
This document contains SC Railing Company proprietary information. Disclosure is prohibited without the prior written permission of SC Railing Company.
7008 Northland Drive, Suite 150 Minneapolis, Minnesota 55428 p: 1-877-215-RAIL(7245) w: sc-railing.com
Staircases called for optional side-mounted posts
Top-mounted Vista railing
Balconies and overlooks called for top-mounted posts
Long runs of Vista railing create separation with a dramatic, yet minimal aesthetic
Our Vista railing is perfect when an unobstructed view is preferred
Free-standing handrails accompany the Vista railing on interior stairs
Project: Meadow Glen Middle School
Location: Lexington, SC
Architect: Hussey, Gay, Bell, & DeYoung International
GC: Adolfson & Peterson Construction
Completion: December 2012
Scope: This project called for 850 linear feet of Vista stainless and glass
railing and 2-line free-standing stainless handrail. Revered for its
simple, yet sturdy design, our Vista railing does not incorporate
a top cap, giving an air of openness, allowing the eye to see well
beyond the railing. Its strength lends itself to high-traffic spaces.
Project Information
Public Middle School
Case Study: Meadow Glen Middle School