WATTSTOR Presenters

National Solar Centre 29th January 2015 Eur.Ing. Peter Cunningham MSc CEng FCIBSE .Chairman

Mark Smith CEng CEnv mCIWEM. Managing Director

MISSION

To provide affordable and viable energy storage and energy

management systems without the need for subsidy

GENERATE LOCALLY, STORE LOCALLY, USE LOCALLY

Page 3: 11  Wattstor, Mark Smith and Peter Cunningham

“Solar and Wind Power systems are useless when the sun

isn’t shining and the wind isn’t blowing. They also usually

generate their energy “at the wrong time”. A WATTSTOR

silences these criticisms.

Started January 2013

First 18 months spent field testing and product development

Validation from Exeter University Environmental Sciences Unit

Winner – Best New Product, Cornwall Sustainability Awards 2013

Launch funding raised via local crowdfunding and the Seed

Enterprise Investment Scheme in October 2014.

Commercial launch of business on 1st October 2014.

Second round of fund raising under way to pursue further R&D

Page 4: 11  Wattstor, Mark Smith and Peter Cunningham

Wattstor Key Features

The Wattstor can provide on & off grid renewable powered uninterruptable power supply

Maximum Self Consumption of Free Renewable Power

Scalable

Integrates with any Smart Switching System for Hot Water Diversion

We have a LOW COST mission, we are better value than the competition. Payback in 5-7 years

Page 5: 11  Wattstor, Mark Smith and Peter Cunningham

Why WATTSTOR?

Electricity prices

Page 6: 11  Wattstor, Mark Smith and Peter Cunningham

Powercuts

“Our current assessment is that the risks to electricity security of

supply will increase in the next five winters.” (Source – OFGEM)

Page 7: 11  Wattstor, Mark Smith and Peter Cunningham

Peak Shaving, Time Shifting etc.

From Storage

To Storage

Renewable Power Without

Storage

Renewable Power With

Storage

Page 8: 11  Wattstor, Mark Smith and Peter Cunningham

WATTSTOR TARGET MARKET

Phase 1 - Domestic

Initially this is the sub 30 KW system capacity market comprising 600,000 + FiT

(Feed in Tariff) registered renewable power systems in the UK alone with more

arriving daily.

66000+ systems in the South West.

Why sub 30 Kw capacity?

Below deemed 50% export threshold, maximum financial return

Current system suits single phase properties

Phase 2 - Commercial

With the release of our Wattstor IMP plus field trials of commercial inverter chargers

we will undertake larger installations as well as grid energy storage opportunities.

Page 9: 11  Wattstor, Mark Smith and Peter Cunningham

What is a WATTSTOR & How Does it Work?

Page 10: 11  Wattstor, Mark Smith and Peter Cunningham

Base Battery Storage Options

Battery type Cost Recycling Weight Safety Maintenance Battery Life

Lead Acid GEL Low Excellent Heavy Excellent No 5-7 years @ 50% DOD

Nickel Iron Medium Excellent Medium Some risk Yes 20-30 years

Lithium Ion High Poor/Nil Light Some risk No 15-20 years

HG Storage Low Excellent Light Excellent No 30 years +

Page 11: 11  Wattstor, Mark Smith and Peter Cunningham

Wattstor IMP

A programmable and customisable smart switch

can control up to 12 prioritised loads

can control resistive and non-resistive loads at domestic and commercial scale

can function as a simple, affordable Building Management System

can function as a renewable energy export limiter

switching beneficial loads on

switch generation off

Can fully integrate with the Smart Grid

Energy Monitoring system

Page 12: 11  Wattstor, Mark Smith and Peter Cunningham

WATTSTOR IMP Energy Storage Options

The IMP can be configured to control any load so energy can be

stored in any way, such as:

Heat & Hot Water – via Immersion/ Calorifier or Heat Pump

Cold - Refrigeration

Compressed Air

Spring, Flywheel etc.

Pump Storage

Hydrogen Generation

Anything’s possible!

Page 13: 11  Wattstor, Mark Smith and Peter Cunningham

Domestic Test ResultsSite 1: Single Phase Install, 6kWp Solar PV

Pre-installation:

10000kWh imported annually (Large electric only home)

The electricity import in July 2012 was 534 kWh with solar PV only.

Post Installation

6000kWh imported annually (40%/ £600 annual reduction)

85% -90% self consumption of Solar PV

In summer months, the daily electricity import from the utility company averaged 3.5 kWh (costing 53p) with some days at zero import

“In July 2013 with a WATTSTOR fitted this was 107.9 kWh …….. an 80% reduction in … import … during summer periods of high solar generation.”

(University of Exeter Environmental Sciences Institute – report published in full on website www.wattstor.com)

Page 14: 11  Wattstor, Mark Smith and Peter Cunningham

Domestic Test ResultsSite 2: 3 Phase Install, 10kWp Solar PV

Pre-installation:

£4000/yr electricity & oil bill

Post Installation (includes PV, Heat Pump & Wattstor)

£400/yr electricity bill

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

Dec Jan Feb Mar Apr May Jun Jul

Ave Daily Import

Ave Daily PV

Page 15: 11  Wattstor, Mark Smith and Peter Cunningham

Domestic Products & Retail Prices*

Model Description

PriceWattstor 3/3 3kW inverter/charger

3kWh of useable storage

Smart Switch

From

£2950

Wattstor 5/6 5kW inverter/charger

6kWh of useable storage

Smart Switch

Wattstor 5/9 5kW inverter/charger

9kWh of useable storage

Smart Switch

Wattstor 5/12 5kW inverter/charger

12kWh of useable storage

Smart Switch

* Detailed price on application

Base price based on Supply and Standard installation with WATTSTOR internally located (garage/utility room)

and within 5m of distribution board.

Page 16: 11  Wattstor, Mark Smith and Peter Cunningham

The Future

Financing options in partnership with a Renewables Only Utility company

Launch of VERSION 2 of IMP energy management switch

In the pipeline:

Re-used EV batteries

Off Peak Tariff storage

“Ditch The Grid”/OFF GRID systems

Combined Heat & Power/ Generator Support

Grid Level Energy Storage

2014 -2015 – Cornwall and South West

2015 -2016 – South East

2017 – UK

2018 – Everywhere!!!!!

Page 17: 11  Wattstor, Mark Smith and Peter Cunningham

Opportunities to Work With WATTSTOR

Referrals & Commission

Supply of Wattstor Kits: See Mark/Michael for details

Become a Crowdfunder! See Peter for details.

Page 18: 11  Wattstor, Mark Smith and Peter Cunningham
Page 19: 11  Wattstor, Mark Smith and Peter Cunningham

Contact Details Michael Danes

Director

[email protected]

Web: www.wattstor.com

www.ditchthegrid.org.uk

0845 524 0221

TREMOUGH INNOVATION CENTRE,

Penryn Campus

Falmouth University

Cornwall

TR10 9TA