Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.
7/21/2016 Oracle OpenWorld
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Oracle SuperCluster for Oracle E-Business Suite
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | Public 4
Typical Enterprise IT Operational Inefficiencies
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Public 5
Typical Enterprise IT Expenditure Distribution
Focus on ongoing expenses, not purchase price.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Optimized Engineered Systems & Cloud Systems built from
commodity servers, storage, networking, and software Monolithic servers
with custom software
Free
dom
to In
nova
te
2005 1995 2015
Freedom from Low-level Tasks Drives Innovation
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle’s Most Powerful Engineered System
7/21/2016 Public 7
• Complete, Integrated Platform • Servers, storage, networking, virtualization,
operating systems, application & database templates, specialized management tools, expert support
• Optimized for Oracle Database • Ultimate OLTP & batch performance, security,
reliability, horizontal & vertical scalability
• Runs Any Standard Application • Runs any standard application, from Oracle
including Oracle E-Business Suite, and 3rd party apps to custom Java, C++, Ruby-on-Rails, Python and more.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle E-Business Suite Customers
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle E-Business Suite Implementations Engineered and Optimized for Performance on Oracle SuperCluster
7/21/2016 Public 9
2x faster patching
E-Business suite database migration in 12 weeks
Form
er P
latfo
rm
PATCHING
Form
er P
latfo
rm
Business reports produced 1.7x faster
Reduced operational costs by 1.8x
SuperCluster Other
EBS RESPONSE TIMES
Supe
rClu
ster
5x faster EBS transaction times 3x EBS performance
improvement
SuperCluster Other
EBS TRANSACTIONS
Supe
rClu
ster
Form
er P
latfo
rm
SuperCluster Other
Form
er P
latfo
rm
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle E-Business Suite Implementations Engineered and Optimized for Performance on Oracle SuperCluster
7/21/2016 Public 10
SuperCluster Other
Form
er P
latfo
rm
EBS AUDIT REPORT
Form
er P
latfo
rm
DEFECT TRACKING TIME
EBS audit report 5x faster EBS HR module 149x faster
28 days to deploy Defect tracking reduced 36x
SuperCluster Other
Form
er P
latfo
rm
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 11
Why Customers Choose SuperCluster for E-Business Suite Engineered and Optimized for Performance
• Extreme Performance • High-volume batch, OLTP work-load and cloning performance
• Cost Reduction • Lower TCO compared to multi-vendor D-I-Y solutions
• Orders of magnitude easier to manage, simpler patching, greater uptime
• Faster Time to Value • 5X faster to deploy with fully documented Oracle E-Business Suite
consolidation best practices
• Risk Reduction, Security and High Availability • Pre-tested solution with built-in security and high availability
• Oracle Platinum Support
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Runs Oracle and Virtually Any Application
• Optimized for E-Business Suite
• Optimized for Oracle Database
• Oracle Fusion Middleware • Oracle Applications • 3rd Party Applications • All Oracle Solaris
Applications • Any Java, Ruby, Spring,
Grails, Groovy, REST, C/C++, etc.
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
General-purpose Storage • Virtual Machine and system data
Unified Ultra-fast Network • 40GB/s QDR InfiniBand I/O backplane
Database & Application Servers • Up to 32 processors and 32 TB of RAM • Software defined scale up or scale out
Exadata Storage Servers Highly optimized storage for Oracle
Database
Query processing OLTP Compression
SuperCluster: Hardware Architecture Complete | Optimized | Fully Virtualized | Scale-up and Scale-out
SuperCluster M6-32 SuperCluster T5-8
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Integrated Software Complete | Optimized | Fully Virtualized | Scale-up and Scale-out
SuperCluster M6-32 SuperCluster T5-8
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
An Obsolete Approach To Managing Data
Production Server with OLTP Database
Copy DB to Run Cost
Management
Data Warehouse Server with
OLAP Database (Column Format)
Oracle Business Intelligence
Server (Analytics &
Reports)
Periodic Batch
Processes
Extract, Transform, Load
Traditional Application Architecture
SLOW, COMPLEX
(Row Format)
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Extreme Performance Innovations
Poor Database Storage I/O Exadata Technology
Public 16
Traditional Performance Bottlenecks
Complex Multi-vendor Tuning
Poor Scalability
Inefficient Virtualization
Poor Memory Utilization
Poor Compute Performance
Full-stack Tuning & Patching
Linear Scale-up and Scale-out
Zero-overhead Virtualization
Architected for In-memory
Oracle T5 and M6 Processors
SuperCluster innovations
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
BOTH row and column in-memory formats for same data/table
Simultaneously active and transactionally consistent
100X Faster Analytics & reporting: column format
2X Faster OLTP: row format
7/21/2016 Public 17
The Next Database Performance Leap
Column Format
Memory
Row Format
Memory
Analytics OLTP Sales Sales
Oracle 12c Database In-memory
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Public 18
SuperCluster: In-Memory Modules for Oracle Applications
Real-time Cost and Profitability Analysis Optimize costs and working capital Evaluate COGS and valuations Maximize margins and gross profits
1000X Faster
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Public 19
SuperCluster: E-Business Suite In-Memory Cost Management
Real-time Cost and Profitability Analysis Optimize costs and working capital Evaluate COGS and valuations Maximize margins and gross profits
1000X Faster Than commodity x86 hardware and regular Oracle Database 12c
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Revolutionary Transformation to Real-Time Enterprise No More Overnight Batch and Real-time Analytics
• Accelerate Your Business In-Memory Application
Architecture
INSTANT, SIMPLE
In-Memory Cost Mgmt Schema OLTP Schema
In-Memory Everything
Bi/Analytics
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Maximum Security Secure Multi-tenant Application and Database Cloud and Consolidation
Secure Java & Middleware
Secure Oracle Database
Secure OS Run-Time
Secure Boot & Firmware
Secure Workload Deployment
Secure VM Templates
Automated Compliance
End-to-End Encryption
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Metering, Limiting and Charging
Web-based Self Provisioning
Dynamic Resource Management
Role Based Access Control
Complete Workload Isolation
SuperCluster: End-to-End Multitenant Architecture
7/21/2016 Public 22
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Complete Solution for E-Business Suite
Application
Database
Operating Systems
Virtual Machines
Storage
Engineered Systems
Centralized Management
Services and
Support
SOLARIS ZONES
SPARC DOMAINS
SOLARIS CLUSTER
SOLARIS CLUSTER GOEGRAPHIC EDITION
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Oracle Optimized Solution for E-Business Suite Engineered, Tested, and Proven from Apps-to-Disk
1,000s of hours of testing across the stack to reduce risk
Sizing and configuration optimizations
Load/stress tests
Performance and scalability
tests
Real world workload tests
Patch regression tests
Fault injection
tests
Interoperability tests
End to end functional validation
Early development
tests
Identify integration
opportunities
Full Stack Optimizations One Engineering Team
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
High Availability
Scale
SuperCluster: High Availability Oracle E-Business Suite
InfiniBand Network
Oracle Exadata Storage Servers
10 GbE Data Center Network
Node 2
Oracle Solaris
Node 1
Oracle Solaris 11
Database Domain
Application Domain
Oracle Solaris Cluster
Oracle RAC
11g R2
Oracle Solaris
Oracle Solaris 11
Database Domain
Application Domain
Node 2
Isolation
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle Platinum Support Industry Leading Enterprise Support
7/21/2016 Public 26
Complete. Integrated. Proactive. High Availability Services.
ORACLE PLATINUM SERVICES
1 Covered system must be within an Oracle two-hour service area to receive two-hour response as a standard service.
• 24/7 support coverage • Specialized Support Team • 2-hour onsite response to hardware issues1 • New updates and upgrades for Database,
Server, Storage, and OS software
• Industry-leading response times: – 5 Minute Fault Notification – 15 Minute Restoration or Escalation to
Development – 30 Minute Joint Debugging with Development
• Patch deployment by Oracle engineers • 24/7 Oracle remote fault monitoring • Higher support level for Oracle stack
– Server, Storage, Network, Database software
Platinum Services at No Additional Cost
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle Platinum Services Benefits: Real World
• 75% fewer sev1 Service Requests • 70% fewer escalations • 37% fewer bugs encountered • 27% shorter avg. SR resolution time • 86% of SRs are opened by Oracle
–Requires an Auto Service Request connection
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle SuperCluster: Services Provider, Europe Implements Oracle E-Business Suite Platform
• Produce business reports 70% faster improving employee productivity
• Cut operational costs and simplified management
Oracle SuperCluster Oracle Exadata
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
• Improved serviceability with 2x faster patching
• E-Business Suite database migration in only 12 weeks
Oracle SuperCluster
Oracle SuperCluster: Educational Institutional, North America Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
• 5x OLTP performance increase • 3x performance increase in EBS
manufacturing, planning and logistics module
Oracle SuperCluster Oracle Exalogic
Oracle SuperCluster: Industrial Supplier, North America Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Public 31
Form
er P
latfo
rm
Supe
rClu
ster
• EBS employee audit report 5x faster
• EBS HR module performance 149x faster
• EBS financials reports 6.5x faster
InfiniBand
Oracle SuperCluster: Oil and Gas Provider, UAE Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
7/21/2016 Public 32
Form
er P
latfo
rm
Supe
rClu
ster
• 28 days to deploy the largest cMRO
implementation in the world • Defect tracking reduced 36x to 5 seconds • Advanced Supply Chain Management
savings of 320 person hours per month
Production Disaster Recovery
Oracle Data Guard Oracle Data Guard
ZFS Replication
Oracle SuperCluster: Aircraft Manufacturer, UAE Implements Oracle E-Business Suite Platform
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
“
Oracle Confidential – Internal/Restricted/Highly Restricted 33
17x Performance Gains, Rapid Deployment, 24x7 Oracle Monitoring and Support with Oracle SuperCluster
“Specialized Bicycles is a brand that innovates. That is why we work with Oracle. It is about speed, increasing efficiencies, knowing and managing net inventory. Our proof of concept showed performance gains up to 17x. An account reconciliation report took 20 hour report ran in 20 minutes on Oracle SuperCluster, that’s huge. We were always I/O bound managing 60TB of data. With the full integration ZFS, it was a huge upgrade for us on top of the flash memory side of the database. From the time we made out decision, did the POC, we were up tremendously fast with Oracle SuperCluster in 65 days. Oracle keeps the system up and running 24/7 with out us worrying.”
Ron Polard CIO
Specialized 17x Performance Gains 65 days to deployment 65
“
17x
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
“ Extreme Efficiencies Implementing SuperCluster Cloud, Cut OPEX by over 80%, Scaled Down Footprint 5x
“The advantages of having the database and applications running on SuperCluster are huge, optimized to run Oracle Database, and Oracle Exalogic. With Oracle SuperCluster we were able to reduce operational costs by 80%, and scaled down and consolidate by a factor of 5x. Quarterly patching was really time saving for my staff. With Oracle SuperCluster, we have one Partner for the whole stack.”
Hallgrímur G. Sigurðsson Manager of Engineering
Advania hf Cut OPEX by over 80% Scaled Down Footprint 5x
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
“ Global Services Provider Runs Oracle E-Business Suite, On SuperCluster, Migrates from IBM Platform
“ NCR chose Oracle SuperCluster for the best performance for an Oracle E-Business Suite , Oracle Enterprise Database, and Oracle Exalogic integrated implementation supported by Oracle Platinum Services. The business benefits proven through the Oracle proof of concept include superior price/performance. NCR will be migrating from an IBM platform to Oracle SuperCluster, integrated with Oracle Exadata and used to manage its Global Service business.”
Martin Kawecki IT Director
NCR Superior Price Performance Oracle Global Services
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Public 36
SuperCluster: Best Platform for E-Business Suite Oracle’s Most Powerful Engineered System
• Engineered System: one integrated system with all the required hardware (servers, network, storage) and Oracle software
• One Architecture for Oracle E-Business Suite and Oracle Enterprise Database
• Solves the IT Challenges Faced by Organizations: • Avoids and removes database and storage silos • Makes all workloads faster • Rapid migration
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
For More Information
facebook.com/OracleHardware
blogs.oracle.com/hardware
linkedin.com/company/oracle
oracle.com/supercluster
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Public
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
BACKUP SLIDES
7/21/2016 Public 39
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Oracle SuperCluster: Customers by Workload Oracle E-Business Suite SAP
Siebel
Java/Solaris
FlexCube
PeopleSoft Oracle Database
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Compute
• 8 UCS M4 (256 Cores/4TB) • 1 UCS 5108 Chassis • 2 Fabric Interconnects • Rack Infrastructure
Subtotal
ASP $194K
$8K $26K
$2K $230K
Support/Yr. $1K $0K $1K $0K $2K
Storage • 10 EMC X-Brick 20 (200TB) • 1 EMC VNX 5600 (80TB) • EMC Unisphere Unified Suite
Subtotal
$2,805K
$65K $15K
$2,886K
$0K $4K $1K $5K
Software • Red Hat Server • VMware vSphere OC EP
Subtotal
$0k
$41K $41K
$17k $10K $27K
Total $3,157K ASP
$33K Support/Yr.
Compute
• 2 T5-8 (256 Cores/4TB) • 3 InfiniBand Switches • Rack infrastructure
ASP
Support/Yr.
Storage • 8 Exadata HC Storage (384TB) • 1 ZS3-ES Storage (80TB) • ZS3 Cloning & Replication • Exadata Storage Software
Software • Oracle Solaris • Oracle VM for SPARC • Enterprise Manager
Total $1,048K ASP
$155K Support/Yr.
SuperCluster T5-8 Full Rack Comparable Cisco/EMC/VMware/RedHat
Cisco/EMC/VMware/RedHat ASP Oracle ASP
SuperCluster: Lower CAPEX than Multi-vendor Systems
3X More
Expensive Year 1
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
Pay for an Engineered System as a Monthly Service Oracle IaaS Private Cloud
• SuperCluster for a monthly fee – Replace CAPEX with OPEX – Lower total cost than purchase
• Private / On Customer Premise – Maintain control of business critical data
• Elastic Compute Capacity on Demand – Pay For peak capacity, only when needed
• Oracle PlatinumPlus Services Included
– Higher level of support including patching services
7/21/2016 Public 42
$0
$100
$200
$300
$400
$500
$600
0 12 24 36 48 60
Cu
mu
lati
ve
Co
st (
$,
00
0s)
Months
3 year term
IaaS with 3 MonthsCoD per Year
IaaS no CoD used
Purchase plusAnnual Support
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Greater Value than Competition 4X Lower Total Cost of Ownership then IBM POWER7+ Solution
$15 million in savings
4X lower five year, Total Cost of Ownership
Greater Value1
SuperCluster Solution
IBM P780+ Solution
4X Savings
5 Year TCO
$5M
$10M
$20M
1Comparing (2) IBM P780s with POWER 7+ processors and 256GB RAM, IBM DS8870 Storage with 512 disks, Oracle Database Enterprise Edition with (1) Oracle SuperCluster ½ Rack HP, Oracle Database Enterprise Edition, Oracle Real Application Clusters, Oracle Exadata Storage Software and Oracle Solaris Cluster
$15M
See substantiation slides
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Save Money Replacing Legacy IBM Systems 2.4X Reduction in 5 year Total Cost of Ownership
Upgrade and Save1
Save $6.4 million over 5 years
Return On Investment in >3 years
30% lower hardware costs
3X lower floor space costs
2X lower power and cooling costs 1Based on analysis replacing IBM P595 servers and DS8300 Turbo storage with Oracle SuperCluster ½ rack
SuperCluster Solution
IBM P595 Solution
2.4X Savings
5 Year TCO
$5M
$10M
See substantiation slides
Copyright © 2015, Oracle and/or its affiliates. All rights reserved. |
SuperCluster: Save Money Replacing Legacy HP Systems 2.7X Reduction in 5 year Total Cost of Ownership
Upgrade and Save1
Save $10.5 million over 5 years
Return On Investment in >2 years
58% lower hardware costs
3X lower floor space costs
1.8X lower power and cooling costs 1Based on analysis replacing HP Superdome and EVA8000 storage with Oracle SuperCluster ½ rack
SuperCluster Solution
Superdome Solution
5 Year TCO
2.7X Savings
$5M
$10M
$15M
See substantiation slides
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides Solution Comparison Disclaimer and Methodology
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Statement of Confidentiality & Disclaimers This presentation and its contents (collectively, "Presentation") are the confidential information of Oracle. The Presentation may not be reproduced, published, disseminated, or otherwise disclosed without Oracle's written consent. The Presentation is designed to provide a rough estimate of the Oracle software and hardware needs for your company based on high level corporate information, and cannot account for all uses, risks and other factors that may affect results or performance, or for changes in your business practices or operating procedures that may be required to realize results or performance that are projected or implied in the Presentation. The Presentation may include selected third party data, information, research and/or reference materials (collectively, "Third Party Information"). The inclusion of the Third Party Information does not constitute an endorsement of Oracle's products or services by any third party. The Presentation is provided to You on an “AS IS” basis without warranty (either express or implied), may be used for informational and general planning purposes only, and is subject to change at Oracle's sole discretion. Further, this Presentation is not a commitment to deliver any future material, code, or functionality. The development, release, and timing of any features or functionality described in this Presentation remains at the sole discretion of Oracle.
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Safe Harbor Statement The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material, code, or functionality, and should not be relied upon in making purchasing decisions. The development, release, and timing of any features or functionality described for Oracle’s products remains at the sole discretion of Oracle.
This model compares the TCO including CAPEX and OPEX of keeping the current environment (i.e. business as usual) versus replacing it with a proposed architecture plus the associated IT related business benefits. TCO categories include: Hardware acquisition and service, Software licenses and maintenance, Power and cooling (CO2 emissions calculated but not monetized), Floor space, and Integration and deployment. IT related business benefits include: Employee productivity, IT staff productivity, and Planned and unplanned downtime. Growth: The average utilization rate of equipment is increased based on the growth rate until it reaches the maximum (default maximum = 60%) at which point additional equipment is acquired. Growth is applied to new proposed equipment deployed during the migration period but is not applied to equipment that is being ramped down. Average utilization: Average utilization applies to workload capacity for servers and to storage capacity for storage. Default average utilization range: initial = 40% and maximum = 60%. Useful life replace: Useful life replace models the cost of replacing equipment at the end of its useful life with equivalent workload or storage capacity at an estimated future price point. Software licenses are transferred to the new equipment. Hardware service is recalculated at the new rate. Future equipment acquisition: The price to acquire equivalent workload or storage capacity is decreased at a default annual erosion rate of 15% per year starting in year 2 through year 5 based on Moore’s Law. Migration Period: For large multi-year implementations, proposed equipment is added and current equipment ramped down in equal amounts for each year of the migration period Purchase: If equipment is purchased, then the entire hardware acquisition cost (CAPEX cash flow) occurs in the year it is acquired. Lease: If equipment is leased, then the cash flow is spread over the lease term (default 3 years). At the end of the lease term, equipment is assumed to be replaced with new equivalent capacity at an estimated future price point recalculating the lease using the same rate.
Methodology
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
EBS Sizing Used in Comparisons High Level IBM Sizing Used for 2000 and 5000 User Comparisons
Source of IBM EBS sizing information: http://public.dhe.ibm.com/common/ssi/ecm/en/ord03011usen/ORD03011USEN.PDF
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides SuperCluster Replaces IBM P595 Solution Comparison
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. | 7/21/2016 Oracle OpenWorld
Lowering TCO for EBS Customer 2000 Users
Initial Year 1 Year 2 Year 3 Year 4 Year 5 sh Outflows 0.00 837.00 860.00 1,971.00 2,722.00
sh Outflows 1,335.00 249.00 254.00 1,670.00 497.00
3,000.00
BAU Proposed Hardware Acquisition 4,370 965 5x Hardware Service 1,563 524 3x Software - Hardware License 4,116 2,844 1x Power and Cooling 297 101 3x Floor Space 125 39 3x Integration and Deployment 466 38 12x
Total cash outflows over the next 5 years BaU = $10,937K Proposed = $4,512K TCO Reduction = $6,425K
TCO OVER 5 YEARS PROJECTED CASH FLOWS
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Initial Year 1 Year 2 Year 3 Year 4 Year 5Benefits 0.00 0.00 0.86 0.90 2.02 2.77Costs -1.34 -0.25 -0.25 -1.67 -0.50 -0.51
3.00
Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total TCO Business as Usual (IB) 0 837 860 1,971 2,722 4,546 10,937
TCO Proposed (P) 1,335 249 254 1,670 497 507 4,512
Other Proposed Project Investments (O) 0 0 0 0 0 0 0
Net TCO (IB - P - O) -1,335 588 606 301 2,225 4,039 6,425
Business Benefits (BB) 0 21 44 45 46 47 203
Net Cash Flow (Net TCO + BB) -1,335 609 650 346 2,271 4,086 6,628
Cumulative Net Cash Flow -1,335 -725 -75 271 2,542 6,628
Cumulative Discounted Net Cash Flow (NPV) -1,335 -778 -236 28 1,607 4,203
Cash Flows And Value Metrics
*Currency USD in Thousands **Unless otherwise noted, all future cash flows are undiscounted
Discounted Total Savings (NPV) : $4,203K TCO reduction : 59% Payback months : 27 Net Initial Investment : $-1,335K ROI based on total project cost (%) : 147 IRR (%) : 65 Cost of 3 month delay : $120K Cash flow discounting period : Year end Cost of Capital : 10%
PROJECTED CASH FLOWS USD in Thousands, Undiscounted
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer Installed Base
Qty Reqd. Qty Server, Engineered System IBM Power 595 Server IBM 2 2
POWER6/5GHz/64GB/4ch/8co IBM 2 2 Disk, Virtual Tape IBM DS8300 Turbo DISK_VTS 1 IBM 1 1
16 x 300GB FC IBM 24 24 Software - Hardware License Oracle Database Enterprise Edition Database Oracle
IBM Power 595 - Server IBM 2 2
Oracle Enterprise Edition RAC HLS 1 Oracle
IBM Power 595 - Server IBM 2 2
Installed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer Installed Base
Qty Reqd. Qty Server, Engineered System SPARC SuperCluster T5-8 SuperCluster Oracle 0 1
HP Half Rack/13TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1 Software - Hardware License Oracle Database Enterprise Edition Database Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Enterprise Edition RAC RAC Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Solaris Cluster Enterprise Edition Cluster Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Exadata Storage Server Software (any rack size) Exadata Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Proposed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Installed Base Proposed
Growth assumptions Growth Type Exponential Exponential Annual growth rate (%) 20.0% 20.0% Site licensed software growth rate (%) 0.0% 0.0% Calculate end of useful life replace Yes Yes Deployment ramp (new required equipment) (Num) 1 1
Discount assumptions Hardware discount (%) 0.0% 0.0% Software discount (%) 0.0% 0.0% Hardware service discount (%) 0.0% 0.0%
Acquisition Plan Acquisition method Purchased Purchased
Inflation assumptions Base inflation rate (%) 5.0% 5.0% Service inflation rate (%) 5.0% 5.0% Software inflation rate (%) 0.0% 0.0% Unit price deflation rate (%) 15.0% 15.0%
Software assumptions Percent of hardware licensed (%) 100.0% 100.0%
Percent of licenses available to transfer to this hardware (%) 0.0% 0.0% Keep surplus licenses on maintenance No No
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Installed Base Proposed
Hardware service assumptions Service level Default Default Premier Service Rate (%) 12.0% 12.0%
Utilization assumptions Minimum/initial hardware utilization (%) 40.0% 40.0% Maximum hardware utilization (%) 60.0% 60.0% Hours of operation per month (Hours) 720 720
Tape media assumptions Tape utilization (%) 70.0% 70.0% Compression ratio (Num) 2 2
Lease Assumptions 1 year lease term monthly rate (Num) 0.051 0.051 2 year lease term monthly rate (Num) 0.040 0.040 3 year lease term monthly rate (Num) 0.029 0.029 4 year lease term monthly rate (Num) 0.023 0.023 5 year lease term monthly rate (Num) 0.020 0.020 Lease Term (Years) 3 3
Oracle On Premise Iaas Assumptions IaaS term (Years) 5 5 Year 4 & 5 discount (%) 30.0% 30.0% IaaS COD enablement percentage (%) 0.0% 0.0%
Power assumptions Power cost per kWh (USD) 0.1 0.1
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Installed Base Proposed
Power assumptions CO2 (kg/kWh) 0.6078 0.6078 PUE (Power Usage Effectiveness) (Num) 1.8 1.8
Floor space assumptions Floor space cost (sq ft per month) (USD) 20.000 20.000 Rack height (rack units) (Num) 42 42 Floor space per rack (sq ft) 18.18 18.18 Rack density (%) 100.0% 100.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides SuperCluster Replaces HP SuperDome Solution Comparison
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Initial Year 1 Year 2 Year 3 Year 4 Year 5 sh Outflows 0.00 1,206.00 1,231.00 2,556.00 4,600.00
sh Outflows 1,335.00 249.00 254.00 1,670.00 497.00
5,000.00
BAU Proposed Hardware Acquisition 5,338 965 6x Hardware Service 1,904 524 4x Software - Hardware License 6,915 2,844 2x Power and Cooling 186 101 2x Floor Space 145 39 4x Integration and Deployment 549 38 14x
TCO OVER 5 YEARS PROJECTED CASH FLOWS
Total cash outflows over the next 5 years BaU = $15,036K Proposed = $4,512K TCO Reduction = $10,524K
Lowering TCO for EBS Customer 2000 Users
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Initial Year 1 Year 2 Year 3 Year 4 Year 5Benefits 0.00 0.00 1.23 1.27 2.60 4.64Costs -1.34 -0.25 -0.25 -1.67 -0.50 -0.51
5.00
Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total TCO Business as Usual (IB) 0 1,206 1,231 2,556 4,600 5,443 15,036
TCO Proposed (P) 1,335 249 254 1,670 497 507 4,512
Other Proposed Project Investments (O) 0 0 0 0 0 0 0
Net TCO (IB - P - O) -1,335 957 977 886 4,103 4,936 10,524
Business Benefits (BB) 0 19 39 40 41 42 182
Net Cash Flow (Net TCO + BB) -1,335 976 1,016 926 4,144 4,979 10,706
Cumulative Net Cash Flow -1,335 -359 657 1,584 5,727 10,706
Cumulative Discounted Net Cash Flow (NPV) -1,335 -443 404 1,109 3,992 7,154
Cash Flows And Value Metrics
*Currency USD in Thousands **Unless otherwise noted, all future cash flows are undiscounted
Discounted Total Savings (NPV) : $7,154K TCO reduction : 70% Payback months : 17 Net Initial Investment : $-1,335K ROI based on total project cost (%) : 237 IRR (%) : 96 Cost of 3 month delay : $184K Cash flow discounting period : Year end Cost of Capital : 10%
PROJECTED CASH FLOWS USD in Thousands, Undiscounted
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer Installed Base
Qty Reqd. Qty Server, Engineered System HP 9000 Superdome SERVER 1 HP 2 2
PA-8900/1.1GHz/16GB/1ch/2co HP 19 19 Disk, Virtual Tape HP EVA8000 DISK_VTS 1 HP 2 1
14 x 300GB FC HP 13 13 Software - Hardware License Oracle Database Enterprise Edition HLS 1 Oracle
HP 9000 Superdome - SERVER 1 HP 2 2
Oracle Enterprise Edition RAC HLS 1 Oracle
HP 9000 Superdome - SERVER 1 HP 2 2
Installed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer Installed Base
Qty Reqd. Qty Server, Engineered System SPARC SuperCluster T5-8 SuperCluster Oracle 0 1
HP Half Rack/13TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1 Software - Hardware License Oracle Database Enterprise Edition Database Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Enterprise Edition RAC RAC Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Oracle Solaris Cluster Enterprise Edition Cluster Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Exadata Storage Server Software (any rack size) Exadata Oracle
SPARC SuperCluster T5-8 - SuperCluster Oracle 0 1
Proposed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Installed Base Proposed
Growth assumptions Growth Type Exponential Exponential Annual growth rate (%) 20.0% 20.0% Site licensed software growth rate (%) 0.0% 0.0% Calculate end of useful life replace Yes Yes Deployment ramp (new required equipment) (Num) 1 1
Discount assumptions Hardware discount (%) 0.0% 0.0% Software discount (%) 0.0% 0.0% Hardware service discount (%) 0.0% 0.0%
Acquisition Plan Acquisition method Purchased Purchased
Inflation assumptions Base inflation rate (%) 5.0% 5.0% Service inflation rate (%) 5.0% 5.0% Software inflation rate (%) 0.0% 0.0% Unit price deflation rate (%) 15.0% 15.0%
Software assumptions Percent of hardware licensed (%) 100.0% 100.0%
Percent of licenses available to transfer to this hardware (%) 0.0% 0.0% Keep surplus licenses on maintenance No No
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Installed Base Proposed
Hardware service assumptions Service level Default Default Premier Service Rate (%) 12.0% 12.0%
Utilization assumptions Minimum/initial hardware utilization (%) 40.0% 40.0% Maximum hardware utilization (%) 60.0% 60.0% Hours of operation per month (Hours) 720 720
Tape media assumptions Tape utilization (%) 70.0% 70.0% Compression ratio (Num) 2 2
Lease Assumptions 1 year lease term monthly rate (Num) 0.051 0.051 2 year lease term monthly rate (Num) 0.040 0.040 3 year lease term monthly rate (Num) 0.029 0.029 4 year lease term monthly rate (Num) 0.023 0.023 5 year lease term monthly rate (Num) 0.020 0.020 Lease Term (Years) 3 3
Oracle On Premise Iaas Assumptions IaaS term (Years) 5 5 Year 4 & 5 discount (%) 30.0% 30.0% IaaS COD enablement percentage (%) 0.0% 0.0%
Power assumptions Power cost per kWh (USD) 0.1 0.1
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Installed Base Proposed
Power assumptions CO2 (kg/kWh) 0.6078 0.6078 PUE (Power Usage Effectiveness) (Num) 1.8 1.8
Floor space assumptions Floor space cost (sq ft per month) (USD) 20.000 20.000 Rack height (rack units) (Num) 42 42 Floor space per rack (sq ft) 18.18 18.18 Rack density (%) 100.0% 100.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Substantiation Slides SuperCluster Solution and IBM P780+ Solution Comparison
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Initial Year 1 Year 2 Year 3 Year 4 Year 5ve Proposal 8.33 0.70 0.86 3.22 2.68
sh Outflows 1.64 0.32 0.32 2.06 0.62
Competitive Proposal Proposed
Hardware Acquisition 7.52 0.96 8x Hardware Service 1.64 0.52 3x Software - Hardware License 9.67 3.94 2x Power and Cooling 0.18 0.10 2x Floor Space 0.06 0.04 2x Integration and Deployment 0.48 0.04 12x
TCO OVER 5 YEARS PROJECTED CASH FLOWS
Total cash outflows over the next 5 years Competitive Proposal = $19.6M Proposed = $5.6M TCO Reduction = $14.0M
Lowering TCO for EBS Customer 5000 Users
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Initial Year 1 Year 2 Year 3 Year 4 Year 5Benefits 0.00 0.00 0.00 0.00 0.00 0.00Costs -0.00 -0.00 -0.00 -0.00 -0.00 -0.00
Category Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Total TCO Competitive Proposal (CP) 8.33 0.70 0.86 3.22 2.68 3.77 19.56
TCO Proposed (P) 1.64 0.32 0.32 2.06 0.62 0.63 5.60
Other Proposed Project Investments (O) 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Net TCO (CP - P - O) 6.68 0.39 0.53 1.16 2.06 3.14 13.96
Business Benefits (BB) 0 0.03 0.06 0.07 0.07 0.07 0.30
Net Cash Flow (Net TCO + BB) 6.68 0.42 0.60 1.23 2.12 3.21 14.26
Cumulative Net Cash Flow 6.68 7.10 7.70 8.93 11.05 14.26
Cumulative Discounted Net Cash Flow (NPV) 6.68 7.06 7.56 8.50 9.98 12.01
Cash Flows And Value Metrics
*Currency USD in Millions **Unless otherwise noted, all future cash flows are undiscounted
Discounted Total Savings (NPV) : $12.01M TCO reduction : 71% Payback months : 0 Net Initial Investment : $6.68M ROI based on total project cost (%) : 254 IRR (%) : 1,000,000,000,000 Cost of 3 month delay : $0.12M Cash flow discounting period : Year end Cost of Capital : 10%
PROJECTED CASH FLOWS USD in Millions, Undiscounted
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer Installed Base
Qty Reqd. Qty Server, Engineered System IBM Power+ 780 SERVER 1 IBM 0 2
POWER7+/3.72GHz/256GB/4ch/32co IBM 0 2 Disk, Virtual Tape IBM DS8870 DISK_VTS 1 IBM 0 1
256x146GB SAS 15K RPM IBM 0 2 Software - Hardware License Oracle Database Enterprise Edition HLS 1 Oracle
IBM Power+ 780 - SERVER 1 IBM 0 2
Competitive Proposal IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Category Component / Sub Component Name Manufacturer Installed Base
Qty Reqd. Qty Server, Engineered System SPARC SuperCluster T5-8 SERVER 1 Oracle 0 1
HC Half Rack/64TB+48TB/3.6GHz/2048GB/8ch/128co Oracle 0 1 Software - Hardware License Oracle Database Enterprise Edition HLS 1 Oracle
SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1
Oracle Enterprise Edition RAC HLS 1 Oracle
SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1
Exadata Storage Server Software (any rack size) HLS 1 Oracle
SPARC SuperCluster T5-8 - SERVER 1 Oracle 0 1
Proposed IT Infrastructure
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Competitive Proposal Proposed
Growth assumptions Growth Type Exponential Exponential Annual growth rate (%) 20.0% 20.0% Site licensed software growth rate (%) 0.0% 0.0% Calculate end of useful life replace Yes Yes Deployment ramp (new required equipment) (Num) 1 1
Discount assumptions Hardware discount (%) 0.0% 0.0% Software discount (%) 0.0% 0.0% Hardware service discount (%) 0.0% 0.0%
Acquisition Plan Acquisition method Purchased Purchased
Inflation assumptions Base inflation rate (%) 5.0% 5.0% Service inflation rate (%) 5.0% 5.0% Software inflation rate (%) 0.0% 0.0% Unit price deflation rate (%) 15.0% 15.0%
Software assumptions Percent of hardware licensed (%) 100.0% 100.0%
Percent of licenses available to transfer to this hardware (%) 0.0% 0.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Competitive Proposal Proposed
Software assumptions Keep surplus licenses on maintenance No No
Hardware service assumptions Service level Default Default Premier Service Rate (%) 12.0% 12.0%
Utilization assumptions Minimum/initial hardware utilization (%) 40.0% 40.0% Maximum hardware utilization (%) 60.0% 60.0% Hours of operation per month (Hours) 720 720
Tape media assumptions Tape utilization (%) 70.0% 70.0% Compression ratio (Num) 2 2
Lease Assumptions 1 year lease term monthly rate (Num) 0.051 0.051 2 year lease term monthly rate (Num) 0.040 0.040 3 year lease term monthly rate (Num) 0.029 0.029 4 year lease term monthly rate (Num) 0.023 0.023 5 year lease term monthly rate (Num) 0.020 0.020 Lease Term (Years) 3 3
Oracle On Premise Iaas Assumptions IaaS term (Years) 5 5 Year 4 & 5 discount (%) 30.0% 30.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |
Key IT Infrastructure Assumptions Input Competitive Proposal Proposed
Oracle On Premise Iaas Assumptions IaaS COD enablement percentage (%) 0.0% 0.0%
Power assumptions Power cost per kWh (USD) 0.1 0.1 CO2 (kg/kWh) 0.608 0.608 PUE (Power Usage Effectiveness) (Num) 1.8 1.8
Floor space assumptions Floor space cost (sq ft per month) (USD) 20.000 20.000 Rack height (rack units) (Num) 42 42 Floor space per rack (sq ft) 18.18 18.18 Rack density (%) 100.0% 100.0%
Copyright © 2014, Oracle and/or its affiliates. All rights reserved. |