Table of ContentsIntroduction -- 5Meeseva Activities -- 7List of Services -- 8 - 121. New service connections -- 13
1) NSC without estimate-domestic -- 14 2) NSC without estimate-commercial -- 15 3) NSC without estimate-General purpose -- 16 4) NSC without estimate-Religious purpose -- 16 5) NSC with estimate-domestic -- 28 6) NSC with estimate-Commercial -- 28 7) NSC with estimate-Industrial -- 29 8) NSC with estimate-Cottage Industries -- 30 9) NSC with estimate- Agriculture -- 3010) NSC with estimate- Agriculture (solar) -- 3011) NSC with estimate-Street Lights -- 3112) NSC with estimate- PWS & RWS -- 3113) NSC with estimate-NTR jalasiri -- 3014) NSC with estimate- General Purpose -- 3115) NSC with estimate-Religious Places -- 3116) NSC with estimate-Temporary Supply -- 3217) NSC with estimate-Sujala Padhakam -- 31
3
2. Load change services -- 42
18) Additional Load without Estimate -- 4319) Additional Load with Estimate -- 4320) Deration of Load -- 43
3.Consumer Complaints -- 51 a) Billing Related
21) Wrong data on bill -- 5222) Wrong entry on bill payment -- 5223) ACD/SC/BB/Arrears disputes -- 53
3. b. Meter Related -- 5924) Meter burnt -- 5925) Meter Running Fast/Creeping -- 5926) Meter struck up -- 4327) Net Metering -- 6028) Meter running slow/sluggish -- 6029) Meter damage -- 6030) No Seal/Seal Cut -- 6031) Meter seal cut -- 6032) Meter lost -- 60
4
3. c. Other Customer Services -- 67
33) Shifting of the service with in the same premises -- 68
34) Temporary supply below 10 days -- 6835) Pole Shift -- 6836) Line shift -- 6837) Termination /permanent dismantle -- 6938) Address correction -- 6939)Requirements of additional poles -- 7040) DTR Shift -- 7041) Shifting of the service with Different premises -- 7142) 24hrs supply -- 7143) Clubbing of services -- 7344) Distribution Transformer Failure -- 72
4) 45. Category Change -- 79
5) 46. Name Change -- 87
5
INTRODUCTIONEPDCL is one of the leading Distribution Company in the India, is extending its Services to the
public in the five Districts of its Jurisdiction i.e. Srikakulam, Viziangaram, Visakhapatnam, East & West
Godavari , through its existing 67 No’s Customer Service Centers Which are available at Sub-Division
Level .
These Customer Service Centers at Sub-Division level will cover 5 to 6 Mandals and are restricted to the
area of jurisdiction , the consumer has to visit his/her respective CSC to avail any of the EPDCL services
In order to provide better consumer service and to improve customer satisfaction at his convenience
and enhance more number of Service delivery points, EPDCL has Migrated its Services from existing
CSC’s on to Mee-Seva since 15th August 2016.
Now all 46 Services that are being offered through CSC’s through its 67 centers are now migrated to
nearly 2600 Mee-Seva Centers.
7
MEESEVA ACTIVITES
EPDCL Services Through Mee-SevaEPDCL services are categorized as::
1) New Service Connections
2) Load Change Services
3) Consumer complaints
4) Category Change.
5) Name Change
6) Repayment service
8
LIST OF SERVICES
1. New service connections1) NSC without estimate-domestic2) NSC without estimate-commercial3) NSC without estimate-General purpose4) NSC without estimate-Religious purpose5) NSC with estimate-domestic6) NSC with estimate-Commercial7) NSC with estimate-Industrial8) NSC with estimate-Cottage Industries9) NSC with estimate- Agriculture10) NSC with estimate- Agriculture (solar)11) NSC with estimate-Street Lights12) NSC with estimate- PWS & RWS13) NSC with estimate-NTR jalasiri14) NSC with estimate- General Purpose15) NSC with estimate-Religious Places16) NSC with estimate-Temporary Supply17) NSC with estimate-Sujala Padhakam
9
2. Load change services
18) ADditional Load without Estimate
19) Additional Load with Estimate
20) Deration of Load.
3. Consumer Complaints
A) Billing Related
B) Meter Related
c) Other customer services
10
3. a. Billing Related
21) wrong data on bill
22) Wrong entry on bill payments
23) ACD/SC/BB/Arrears disputes
3. b. Meter Related
24) Meter burnt
25) Meter Running Fast/Creeping
26) Meter struck up
27) Net Metering
28) Meter running slow/sluggish
29) Meter damage
30) No Seal/Seal Cut
31) Meter seal cut
32) Meter lost
11
3. c. Other Customer Services33) Shifting of the service with in the same premises
34) Temporary supply below 10 days
35) Pole Shift
36) Line shift
37) Termination /permanent dismantle
38) Address correction
39) Requirements of additional poles
40) DTR Shift
41) Shifting of the service with Different premises
42) 24hrs supply
43) Clubbing of services
44) Distribution Transformer Failure
13
1. New service connections
New Service Connection ‘With out Estimate’(1 to 4)
Process Flow for New Service Connection‘With out Estimate’
When there is no requirement of additional infrastructure and if the
service can be released on the existing lines, the consumer can
opt for New Service Connection under this head.
14
1) NSC without estimate-domestic:
Description: Consumer can apply a service connection under this categorywhen the individual house having a separate kitchen withcompleted wiring and the pole is below 30 metres
Requirements: 1.Signed application.
2.Sale deed/latest house tax receipt /allotment letter
3.Self declaration for Wiring Certificate
4.Aadhar card
5. Photo
Charges: Amount per 1 kw Rs.1450/-
Development Charges- Rs. 1200/-
Security Deposit- Rs.200 /- + Service Charges(Rs.35/-)
Application fee – Rs.50/-
Note: If consumer is not having any proof of ownership then consumer can apply with Aadhar
card and Rs. 100/- Non-Judicial self Indemnity bond with 3 times Security Deposit.
}
15
2) NSC without estimate-commercial:
Description : consumer who avail supply of power in this category for commercial and
non- domestic premises such as under construction, shops, Business,
offices,public buildings,hospitals,hostels,hotels, choultries, restaurants,
clubs, theaters, bus stations, railway stations, timber depots, photo
studios, printing presses, etc..
Requirements:1. Signed application
2. Sale deed/latest commercial tax receipt /allotment letter
3. Self declaration for Wiring Certificate
4. Aadhar card
5. Photo
Charges: Amount per 1 kw 2100/- + service charges
Development Charges- Rs. 1200/-
Security Deposit- Rs.800 /- + Service Charges(Rs.35/-)
Application fee – Rs.100/-
Note: If consumer is not having any proof of ownership then consumer can apply with Aadhar
card and Rs.100/- Non-Judicial self Indemnity bond with 3 times Security Deposit.
}
16
3) & 4) NSC without estimate-General & Religious purpose:
Description: This is applicable for supply of power for temples, churches, mosques, government educational institutions and schools, public charitable trusts and societies registered, government welfare hostels and Registered old age Homes, Medical Institution on a no profit Basis .Requirements: 1.Signed application 2.secretary letter for school &colleges & welfare hostels 3.society registration letter for temples 4.Aadhar Card 5.Self declaration for Wiring Certificate 6. PhotoCharges: Amount per 1 kw 2100/- + service charges Development Charges- Rs. 1200/- Security Deposit- Rs.800 /- + Service Charges(Rs.35/-) Application fee – Rs.50 /-
Note: Statutory charges differ based upon the load, location and social category.
}
27
New Service Connection ‘With Estimate’ (5 to 16)
Process Flow for New Service ConnectionWith Estimate
When there is no infrastructure readily available to release theconsumer can opt for New Service Connection under this
head. Upon registration the department officer will inspect thelocation, prepare and sanction the estimate and intimate
customer as to how much has to be paid.
28
5) NSC with estimate-domestic: Description: Consumer can apply a service connection under this category when the individual househaving a separate kitchen with completed wiring subjected to the conditions that the pole is above 30 metres,If the load is above 5kw, and G+2
Requirements: 1.Signed application 2.Sale deed/latest house tax receipt /plan 3.Self declaration for Wiring Certificate 4.Aadhar card
5.PhotoCharges: Amount per application fee Rs.50 /- + service charges (Rs.35/-)
6) NSC with estimate-Commercial:
Description : Consumer can apply a service connection under this category with completed wiring subjected tothe conditions that the pole is above 30 metres, If the load is above 5kw.
Requirements: 1. Signed application 2. Sale deed 3. Approved site plan 4. Self declaration for Wiring Certificate 5. Aadhar card
6. PhotoCharges: Amount per application fee Rs. 100/- + service charges (Rs.35/-)
29
7) NSC with estimate-Industrial:Description: : for this category consumer applying contracted load of 75kw/100Hp and below. for small scale industrial purpose any
manufacturing, processing preserving goods for sales and also floor mills, oil mills, saw mills, poultry mills forming units ,floriculture in green
houses, sugar can crushing and news paper printing units
(a). For industry Requirements: 1) Signed application
2) Sale deed
3) Approved site plan
4) Local body NOC
5) SSI Certificate
6) pollution certificate
7) Self declaration for Wiring Certificate
8) Aadhar card
9) Photo
(b). For Fisheries : Requirements: 1) Signed application
2) Sale deed/1B,Adangal
3) Pattadar pass book
4) Local body NOC
5) Fisheries Certificate
6) Self declaration for Wiring Certificate
7) Aadhar card
8) Photo
Charges: Amount per application fee Rs. 100/- + service charges (Rs.35 /-)
30
8) NSC with estimate-cottage industries: Description: Consumer can apply a service connection under this category like Dhobi Ghats ,Small cottageindustries, carpentry, pottery, phenoyl production units, Agarbathi production units,Vermi culture, Seri culture,Mushroom growing, Rabbit farming, Sheep rearing ,Emu birds farming,polutry farm up to 1000 birds , Honey making,chaff cutting and Dairy Farming activities with connected load up to 10Hp
Requirements: 1) Signed application2) Sale deed3) SSI Certificate
4) Self declaration for Wiring Certificate 5) Aadhar card
6) Local Body NOC7) Photo
Charges: Amount per application fee Rs. 100/- + service charges
(9&10&13) NSC with estimate-Agriculture/AGL Solar/NTR Jala siri :
Description: : Consumer can apply a service connection under this category for Agriculture PurposeNote : For Agl solar – applicable up to connected load 5HpRequirements: 1) Signed application
2) 1B,Adangal / Pattadar pass book3) Ground Water Certificate (AP VOLTS)4) Self declaration for Wiring Certificate5) Aadhar card6) Photo
Charges: Amount per application fee Rs 50/- + Service Charges
31
(11& 12&17) NSC with estimate-Street Lights/P W S &RWS scheme/NTR Sujala Padakam :
Description:Consumer can apply a service connection under this category like Street Lights W S Scheme in the Local BodiesPanchayats/Municipalities /Municipal Corporations and NTR Sujala Padhakam (Drinking Water Schemes Notified by theGovt .Of AP and /Or Concerned statutory authorityRequirements:
1)Signed application2) Panchayaths/Municipal Secretary letter3) Self declaration for Wiring Certificate4) Aadhar card5) Photo
Charges: Amount per application fee Rs.100/- + service charges (Rs.35/-)
14&15) NSC with estimate-General Purpose /Religious Places:
Description: Consumer can apply a service connection under this category for temples, churches, mosques,government educational institutions and schools, public charitable trusts and societies registered, government welfarehostels and Registered old age Homes, Medical Institution on a no profit Basis .
Requirements: 1. Signed application2. Secretary letter for school &colleges & welfare hostels3.society registration letter for temples4.AADHAR CARD5.Self declaration for Wiring Certificate
6. PhotoCharges: Amount per application fee Rs. 100/- + service charges (Rs.35/-)
32
16) NSC with estimate-Temporary Supply :
Description: Consumer can apply a service connection under this category supply of power for temporary.
Requirements: 1) Signed application2) Local Body NOC3) AADHAR CARD4) Self declaration for Wiring Certificate5) Photo
Charges: Amount per application fee Rs. 100/- + service charges (Rs.35/-)
PROCESS FLOW :
With Estimation Service Request Screen
35
Location of Premises where supply is required screen
Address for Communication Screen
Information Details Screen
41
Work Flow After Registration Process:
EstimationIntimation to
Customer throughADE for the payment
DE ADE
SERVICE RELEASE
Insp
ecti
on fo
res
tim
ati
on
ERO
PAYMENT
PAYMENT
MEE-SEVA
42
2. Load change services
18) Additional Load without Estimate
19) Additional Load with Estimate
20) Deration of Load.
43
(18& 19 & 20) Additional Load with estimate , without estimate And Deration of load - : Description: additional load : An existing consumer can increase the contracted load and also the phase change ( if necessary) fromsingle phase to three phase. Deration of load :decreasing the contracted load ( if necessary) Requirements: 1) Signed application
2) CC Bill and Latest payment Receipt3) AADHAR CARD4) Self declaration for Wiring Certificate5) LT Agreement ( For Agriculture and Industrial Only)
Charges: Amount per application fee Rs.50/- + service charges (Rs.35/-)
Load Change Application Service Selection
46
Request Load Change Details Selection Screen
Address for Communication and Informant Details Screen
51
3. Consumer Requests
a) Billing Relatedb) Meter Relatedc) Other customer services.
Process Flow for Consumer RequestsAn existing Consumers having any problem with related to Meter, Billing orany other complaints, the consumer can prefer to register a complaint underthis head
52
3 a .Billing Related Complaints:
21) Wrong data on bill:
Description: For this service the consumer to change that the concerned electricity bill is in correct i.eunits ,readings ,charges.
Requirements: 1. Request letter2. Aadhar Card3. Electricity Bill4. Application Form
Charges: Service charge only
22) Wrong entry on bill payment:
Description: For this service the consumer to correct that the concerned electricity bill payment was wronglyentered .
Requirements: 1. Request letter2. Aadhar Card3. Electricity Bill4. Application Form
Charges: Service charge only (Rs.35/-)
53
23) ACD/SC/BB/Arrears disputes:
Description: For this services
Back Billing, Additional Consumption Deposit,Short fall charges: A back-bill is a ‘catch-up’ bill sent to you by yourelectricity supplier when you haven’t been correctly charged for your energy use, for 12 months or more.
The department has been charging ACD - a refundable security charge - from customers by asking them to payan amount equal to their electricity bill for two months, which is calculated after taking out the monthly average of theirconsumption for a year.
Requirements: 1. Request letter2. Aadhar Card3. Electricity Bill4. Application Form
Charges: Service charge only (Rs.35/-)
59
3 b. Meter Related Complaints:
24) Meter burnt: If meter is burnt
Requirements : 1. Request letter2. Aadhar card3. Electricity bill
Meter burnt Charges : Single Phase : 920/- Three Phase : 2370/- + service Charges. (Rs.35/-) LTTVR : 7620/-25) Meter running fast/Creeping:
Requirements : 1 . Request letter 2. Aadhar card 3. Electricity bill Charges: service charges + testing fee : Single phase 200/- Three Phase 500/- + service charges (Rs.35/-) LTTVR 2500/-
60
27) Net Metering : this service is for solar roof tops .
Requirements :
1.Application form
2.Request letter
3. Aadhar card
4.Electricity bill
charges: application fee 25/- +Service Charges (Rs.35/-)
Remaining Meter related Complaints:
S.No Complaints Requirements Charges
26 Meter Struck up 1.Request letter
2.Electricity Bill
3.Aadaar Card
Service Charges only
28 Meter running slow/slugging
29 Meter Damage
30 No seal/seal cut
31 Meter seal cut
32 Meter lost
67
3. c. Other Customer Services
33) Shifting of the service with in the same premises
34) Temporary supply below 10 days
35) Pole Shift
36) Line shift
37) Termination /permanent dismantle
38) Address correction
39) Requirements of additional poles
40) DTR Shift
41) Shifting of the service with Different premises
42) 24hrs supply
43) Clubbing of services
44) Distribution Transformer Failure
68
3 c. Other customer services :33) Shifting of service with in the same premises:
Description: To shift the meter in the same location.Requirements: 1.Electricity bill
2. Request letter3. Aadhar card4.Application form
Charges: Rs.125/- +Service charges (Rs.35/-)
34) Temporary supply below 10days:Description: This service is only for temporary purpose like exhibitions, festivals, functions.Requirements: 1.Request letter
2.Indeminity Bond(Rs.100/-) 3.Aadhar Card
Charges: Statutory Charges + Service Charges (Rs.35/-)
35) Pole Shifting:Description: To shift the pole from one place to other placeRequirements: 1.Electricity bill
2. Request letter3. Aadhar card4.Application form5. Declaration form in Indemnity Bond(Rs.100/-)
Charges: Service charges only (Rs.35/-)
36) Line Shifting:Description: To shift the line from one place to other placeRequirements: 1.Electricity bill
2. Request letter3. Aadhar card4.Application form5. Declaration form in Indemnity Bond(Rs.100/-)
Charges: Service charges only (Rs.35/-)
69
37) Termination /permanent dismantle:
Description: I f the consumer opts for termination or permanent dismantlement
Requirements: 1. Request Letter 2.Electricity bill 3. Aadhar card 4. Ownership proof
Charges: Service Charges only. (Rs.35/-)
38) Address Correction: Description: If any corrections in electricity bill like door no, place,name spelling these are comes under addresscorrection.
Requirements:1.Request letter2. proof of ownership/tax receipt3. Electricity bill4. Aadhar card
Charges: Service charges only. (Rs.35/-)
70
39) Requirements of Additional poles: Description: To get this service for non sufficient of poles for their premises/street lights .
Requirements:
1. Electricity bill
2. Request letter
3. Aadhar card
4. Application form
5. Declaration form in Indemnity Bond(Rs.100/-)
Charges: Service charges only. (Rs.35/-)
40) DTR Shifting:
Description: To shift the DTR from one place to other place
Requirements: 1.Electricity bill
2. Request letter
3. Aadhar card
4. Application form
5. Declaration form in Indemnity Bond(Rs.100/-)
Charges: Service charges only (Rs.35/-)
71
41) Shifting of service with other same premises:
Description: To shift the meter from one location to other location .Requirements: 1. Electricity bill
2. Request letter3. Aadhar card4. Application form5. House tax
Charges: Rs.125/- +Service charges (Rs.35/-)
42) 24 hrs. Supply:
Description: For this service Industry/Agriculture/Fish tanks .Requirements: 1. Electricity bill
2. Request letter3. Aadhar card4. Application form5. Declaration form in Indemnity Bond(Rs.100/-)
Charges: Rs.125/- +Service charges (Rs.35/-)
72
44) DTR Failure:
Description: Any Consumer can approach Mee-seva to register if the Transformer Fails
Requirements: 1. Electricity bill2. Request letter3. Aadhar card4. Application form5. Declaration form in Indemnity Bond(Rs.100/-)
Charges: Service charges (Rs.35/-)
73
43) Clubbing of Services:Description: To get this service consumer having two services in a portion of same premises/the departmentauthorities inspect and issue a notice to the consumer having two services in a portion for same purpose.
Requirements: 1. Electricity bill2. Request letter3. Aadhar card4. Application form
Charges: Rs.125/- +Service charges (Rs.35/-)
Work Flow Process
79
4) 44. Category Change
An existing consumer who want to change his service category can register under this head
Description: For this service the consumer to change the category from I to II & II to I as they required.Requirements:
1. Signed application form2. Request letter
3. latest electricity bill with payment receipt4. Aadhar card
Charges: in case of(a) Cat II to I collect only application fee 25/-+ service charges (Rs.35/-)(b) Cat I to Cat II Difference SD charges collected as the system shown
Process Flow:
EPDCL Department
87
5) Name ChangeAn existing consumer who want to change the Name of his service can register under this head(generally this will be required when a consumer purchases a property with Electric serviceconnection, or while transferring property from parents to children etc)
46) NAME CHANGE:
Description: This service provides o citizen to change the name from old name to new name for the existing service connection.
Requirements:1.Signed application2. Sale deed3.Latest Municipal tax receipt4. Link document5. Title transfer form with notary6. Indemnity Bond(Rs.100/-)7. latest Electricity bill and receipt8.Aadhar card
For agriculture service: 1.signed application2.sale deed3. pattadhar pass book4. MRO certificate( in case service no not mentioned in sale deed)5. ERO no due certificate
remaining requirements 4 to 8 as above mentioned
98
6) Repayment Service
Any service rejected with a reasons like Wrong category applied then difference amounts /estimationamounts/Meter Running fast Challenging fee/Temporary Supply can be done in this service.
Other activities in Mee-seva• NSC repayments• PROCESS FLOW
100
Repayment Service Request Application Request screen
Repayment Service Application Request Screen
104
Flow for Re-Upload Documents
This service facilitates citizen to Re-upload Supporting documents for New Connection Applications
which are rejected by the Department
If any application number rejected by department due to unsatisfactory or insufficient documents,
then Citizen has provision to upload his documents using Re-upload Documents in EPDCL
Department.
This Re-upload facility is available only in Mee-Seva centre where he had applied New Connection
Service. For this Re upload service need not to pay any amount
106
• Select the ‘View Transaction’ link at Mee-Seva Home Page.
• Enter Application No or Transaction No (or) Search transaction number based on From Date,To Date and Service Name
• Based on Transaction/Application No, it displays Transaction No, Service Name, Customer Name,Transaction Date, Amount (Rs.), Status, Upload Documents and Application Preview.
• Click on Preview Link. It displays all applicant details which are entered at earlier.
• Browse the re-uploaded document and click on Submit button.
List of Forms
• Application form
• Indemnity bond form
• Name transfer form
• Name transfer indemnity bond form
• Shifting self declaration form
• Agriculture declaration form
107
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
APPLICATION FORM FOR NEW SERVICE
108
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
APPLICATION FORM FOR NEW SERVICE
109
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
NEW SERVICE INDEMNITY BOND FORMATS
110
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
NEW SERVICE INDEMNITY BOND FORMATS
111
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
INDEMNITY BOND FORMATS
113
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
INDEMNITY BOND FORMATS
114
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
INDEMNITY BOND FORMATS
115
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
FORM-3 FOR AGRICULTURAL SERVICES
117
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
APPLICATION FORM FOR SOLAR NET METERING
118
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
APPLICATION FORM FOR SOLAR AGL
119
Eastern Power Distribution Company of A.P.LimitedCustomer Service Center (CSC)
NAME CHANGE TRANSFEROR AND TRANSFEREE FORM
120
Registration
Here the registration process take place the consumer data will be filled in the MEESEVA
software and it will be allotted a registration no
For New service connection it starts with NSCREG
Where as for csc it starts with no as 150—————
....THANK YOU....